Units: | $000 |
Mode: | Output Only |
Multi-band: | False |
Default Value: | |
Validation Rule: | |
Key Property: | No |
Description: | Annualized cost of units built |
Heat Plant Annualized Build Cost is the annuity calculated from the input Build Cost and WACC as described in the LT Plan topic.