Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Abatement Cost | $/kg (Metric), $/lb (U.S. Imperial) | False | 0 | False | Cost per unit of emission removed | |
Efficiency | % | False | 100 | False | Efficiency of emission abatement | |
FO&M Charge | $000 | False | 0 | False | Annual fixed charge for emission abatement technology | |
Max Abatement | kg (Metric), lb (U.S. Imperial) | False | 1E+30 | False | Maximum emission abatement rate | |
Max Abatement Day | tonne (Metric), ton (U.S. Imperial) | False | 1E+30 | False | Maximum abatement in a day | |
Max Abatement Hour | kg (Metric), lb (U.S. Imperial) | False | 1E+30 | False | Maximum abatement in an hour | |
Max Abatement Month | tonne (Metric), ton (U.S. Imperial) | False | 1E+30 | False | Maximum abatement in a month | |
Max Abatement Week | tonne (Metric), ton (U.S. Imperial) | False | 1E+30 | False | Maximum abatement in a week | |
Max Abatement Year | tonne (Metric), ton (U.S. Imperial) | False | 1E+30 | False | Maximum abatement in a year | |
Running Cost | $/h (Metric), $/hr (U.S. Imperial) | False | 0 | False | Fixed cost of running emission abatement when generators are on-line | |
Units | - | False | 1 | In (0,1) | True | Flag if emission abatement technology is installed |
Units Out | - | False | 0 | In (0,1) | False | Flag if emission abatement technology is out-of-service |
VO&M Charge | $/MWh | False | 0 | False | Cost per unit of generation | |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Generation Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of generator emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Consumption Base | GJ/h (Metric), MMBtu/h (U.S. Imperial) | False | 0 | False | Consumption at notional zero generation level | |
Consumption Incr | GJ/MWh (Metric), Btu/kWh (U.S. Imperial) | False | 0 | False | Incremental consumption as a function of generation |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Abatement Cost | $/kg (Metric), $/lb (U.S. Imperial) | False | 0 | False | Cost per unit of emission removed for this emission | |
Efficiency | % | False | 100 | False | Efficiency of emission abatement for this emission | |
Max Abatement | kg (Metric), lb (U.S. Imperial) | False | 1E+30 | False | Maximum emission abatement rate for this emission |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of gas field emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of gas plant emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of gas node emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of gas demand emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Participation Factor | - | False | 1 | Between 0 And 1 | False | Proportion of gas contracts emissions that feed into the abatement technology |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Abatement Coefficient | kg (Metric), lb (U.S. Imperial) | False | 0 | False | Coefficient of emissions abated | |
Operating Hours Coefficient | h | False | 0 | False | Coefficient of number of hours the emission abatement technology is running |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Abatement Coefficient | kg (Metric), lb (U.S. Imperial) | False | 0 | False | Coefficient of emissions abated | |
Operating Hours Coefficient | h | False | 0 | False | Coefficient of number of hours the emission abatement technology is running |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Abatement - kg (Metric), lb (U.S. Imperial) | Abatement - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emissions abated |
Abatement Cost - $ | Abatement Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost per unit of emission removed |
Abatement Net Cost - $ | Abatement Net Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Net of [Total Cost] and [Abatement Value] |
Abatement Value - $ | Abatement Value - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Value of emissions abated |
Consumables Cost - $ | Consumables Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total cost of consumables |
Efficiency - % | Efficiency - % | Production | LT Plan, MT Schedule, ST Schedule | False | Efficiency of emission abatement |
FO&M Cost - $ | FO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total fixed operations and maintenance costs |
Gross Emissions - kg (Metric), lb (U.S. Imperial) | Gross Emissions - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission input to the abatement technology |
Net Emissions - kg (Metric), lb (U.S. Imperial) | Net Emissions - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emissions net of abatement |
Operating Hours - h | Operating Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of operation. |
Running Cost - $ | Running Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Fixed cost of running emission abatement when generators are on-line |
Total Cost - $ | Total Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total of fixed, semi-fixed and variable costs |
Units | Units | Production | LT Plan, MT Schedule, ST Schedule | False | Flag if emission abatement technology is installed |
Units Out | Reliability | LT Plan, MT Schedule, ST Schedule | False | Flag if emission abatement technology is out-of-service | |
VO&M Cost - $ | VO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total variable operation and maintenance cost |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Consumption - GJ (Metric), MMBtu (U.S. Imperial) | Consumption - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Consumable used |
Cost - $ | Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of consumable used |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Abatement - kg (Metric), lb (U.S. Imperial) | Abatement - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emissions abated for this emission |
Abatement Value - $ | Abatement Value - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Value of emissions abated for this emission |
Efficiency - % | Efficiency - % | Production | LT Plan, MT Schedule, ST Schedule | False | Efficiency of emission abatement for this emission |
Gross Emissions - kg (Metric), lb (U.S. Imperial) | Gross Emissions - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission input to the abatement technology for this emission |
Net Emissions - kg (Metric), lb (U.S. Imperial) | Net Emissions - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emissions net of abatement for this emission |