Facility Max Ramp Down
Units: | - |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 1E+30 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Maximum ramp down rate |
Detail: |
Facility Max Ramp Down sets a limit on the rate at which the facility can decrease Production from one interval to the next. The value is the maximum change in production per hour. This limit applies for Production ranges between the minimum operating level and Max Operating Level.
For multi-unit facilities the available ramp down is defined as:
-
Max Ramp Down (total) = Units
Operating × Max Ramp Down
By default the ramping limit is a hard constraint meaning that no violation is allowed. To create soft constraints with a penalty price use the Max Ramp Down Penalty property.
Property | Value | Units |
---|---|---|
Units | 1 | - |
Max Operating Level | 100 | - |
Min Operating Factor | 40 | % |
Max Ramp Up | 30 | - |
Max Ramp Up Penalty | 100 | $ |
Max Ramp Down | 30 | - |
Max Ramp Down Penalty | 100 | $ |
Related reporting properties:
- Facility Ramp
- Facility Ramp Down Price
- Facility Ramp Down Violation Hours
- Facility Ramp Down Violation
- Facility Ramp Down Violation Cost
See also: