Flow Path Build Cost

Units: $
Mode: Input/Output
Multi-band: True
Default Value: 0
Validation Rule: Any Value
Key Property: No
Description: Cost of building the Flow Path
Detail:
Input

Flow Path Build Cost is the cost of building a new Flow Path for LT Plan. This cost can be defined in combination with Economic Life and WACC so that LT Plan computes an annuity as described in the article LT Plan. If Build Cost is defined without these parameters then the entire cost is incurred in the period the Flow Path is added.

Output

As output Build Cost is the total cost of Units Built in the reporting period.

See also: