Gas Pipeline Max Flow Back Week

Units: 1000·~ (Metric), ~ (U.S. Imperial)
Mode: Input Only
Multi-band: False
Default Value: 0
Validation Rule: ≥0
Key Property: No
Description: Maximum quantity of gas that can be extracted at the pipeline sending node each week
Detail:

Gas Pipeline Max Flow Back Day is the weekly variant of Max Flow Back. The maximum quantity of gas that can be extracted at the pipeline sending node each week.

See also: