Generator Energy Utilisation Factor
Units: | % |
Mode: | Output Only |
Multi-band: | False |
Default Value: | |
Validation Rule: | |
Key Property: | No |
Description: | Portion of available technical capacity dispatched |
Detail: |
Generator Energy Utilisation Factor is the ratio of actual output over a period to the maximum possible output over that period, only for committed operational hours. The maximum possible output accounts for generator start ups, shut downs, and ramping constraints.