Generator One-time Cost
Units: | $000 |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | Any Value |
Key Property: | No |
Description: | One-time cost associated with the project |
Detail: |
Generator One-time Cost is incurred in the period the project is built by LT Plan. The cost is added to the Build Cost, and the sum is used to calculate the annualized costs.