Company Index

Company Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk$False0FalseAcceptable risk around target net profit
Formulate RiskYes/NoFalse0In (0,-1)FalseIf constraint should be formulated to bound company net profit risk
LoadMWFalse0FalseOwn load + load contracts
Load Includes LossesYes/NoFalse0In (0,-1)FalseFlag if input load includes transmission losses
Mark-up Bias-False0FalseBias given towards high revenue periods in mark-ups (cost recovery algorithm)
Max MaintenanceMWFalse1E+30≥0FalseMaximum generation capacity allowed to be scheduled on maintenance
Max Maintenance Factor%False100Between 0 and 1FalseMaximum generation capacity allowed to be scheduled on maintenance as a proportion of installed capacity
Min MaintenanceMWFalse0≥0FalseGeneration capacity that must be scheduled on maintenance
Min Maintenance Factor%False0Between 0 and 1FalseGeneration capacity that must be scheduled on maintenance as a proportion of installed capacity
Risk Level-False0.1Between 0 and 1FalseRisk level for risk-constrained optimization
Strategic%False100Between 0 And 100FalsePercentage of company generation that acts strategically
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Company Emissions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Allocationkg (Metric), lb (U.S. Imperial)False0FalseEmission rights allocation
Allocation Daytonne (Metric), ton (U.S. Imperial)False0FalseEmission rights allocation
Allocation Hourkg (Metric), lb (U.S. Imperial)False0FalseEmission rights allocation
Allocation Monthtonne (Metric), ton (U.S. Imperial)False0FalseEmission rights allocation
Allocation Weektonne (Metric), ton (U.S. Imperial)False0FalseEmission rights allocation
Allocation Yeartonne (Metric), ton (U.S. Imperial)False0FalseEmission rights allocation

Company Regions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Load Participation Factor-False0FalseProportion of region load the company is responsible for

Company Companies Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Balancing Area Interchange Hurdle$/MWhFalse0FalseFinancial hurdle rate for exports from the company
Max Balancing Area InterchangeMWFalse1E+30FalseMaximum financial exports

Company Markets Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Share%False100Between 0 And 100FalseCompany's share of market trades

Company Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Committed Capacity CoefficientMWFalse0FalseCoefficient of company committed generation capacity
Contract Volume CoefficientMWFalse0FalseCoefficient of company contract volume
Dump Energy CoefficientMWFalse0FalseCoefficient of dump energy (over generation)
Generation CoefficientMWFalse0FalseCoefficient of company generation
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Unserved Energy CoefficientMWFalse0FalseCoefficient of unserved energy

Company Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Committed Capacity CoefficientMWFalse0FalseCoefficient of company committed generation capacity
Contract Volume CoefficientMWFalse0FalseCoefficient of company contract volume
Dump Energy CoefficientMWFalse0FalseCoefficient of dump energy (over generation)
Generation CoefficientMWFalse0FalseCoefficient of company generation
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Unserved Energy CoefficientMWFalse0FalseCoefficient of unserved energy

Company Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Abatement Cost - $Abatement Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of emission abatement
Annualized Build Cost - $000Annualized Build Cost - $000ExpansionLT PlanFalseAnnualized cost of generating units built
Auxiliary Use - MWAuxiliary Use - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseAuxiliary use
Available Capacity - MWAvailable Capacity - MWCapacityLT Plan, MT Schedule, ST ScheduleFalseAvailable generation capacity
Balancing Area Interchange Exports - MWBalancing Area Interchange Exports - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseFinancial exports from the company
Balancing Area Interchange Exports Revenue - $Balancing Area Interchange Exports Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from financial exports from the company
Balancing Area Interchange Imports - MWBalancing Area Interchange Imports - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseFinancial imports to the company
Balancing Area Interchange Imports Cost - $Balancing Area Interchange Imports Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of financial imports to the company
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of units built
Capacity Built - MWCapacity Built - MWExpansionLT PlanFalseCapacity built (Max Capacity x Units Built)
Capacity Curtailed - MWEnergy Curtailed - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseAmount of non-positive-priced generation curtailed.
Capacity Price - $/kW/yrCapacity Price - $/kW/yrExpansionLT Plan, MT Schedule, ST ScheduleFalseAverage price paid for capacity in the company
Capacity Retired - MWCapacity Retired - MWExpansionLT PlanFalseCapacity retired (Max Capacity x Units Retired)
Capacity Revenue - $Capacity Revenue - $000ExpansionLT Plan, MT Schedule, ST ScheduleFalseRevenue from capacity payments to generators in the company
Constrained Off Revenue - $Constrained Off Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseConstrained off revenue
Constrained On Revenue - $Constrained On Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseConstrained on revenue
Contract Cost - $Contract Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration cost from physical contracts
Contract Generation - MWContract Generation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration from physical contracts
Contract Load - MWContract Load - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseLoad from physical contracts
Contract Revenue - $Contract Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from physical contracts
Contract Settlement - $Contract Settlement - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseMonies received (+ve) or paid out (-ve) on CfDs
Contract Volume - MWContract Volume - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseVolume of financial contracts (CfDs)
Cost to Load - $Cost to Load - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePool purchase cost from own load + load contracts
Debt Cost - $Debt Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of debt
Dispatchable Capacity - MWDispatchable Energy - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseOn-line capacity
Dump Energy Allocation - MWDump Energy Allocation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseDump energy allocated to the company.
Emissions Cost - $Emissions Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost from production of emissions
Equity Cost - $Equity Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of equity
Fixed Costs - $Fixed Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fixed costs
Fixed Load Generation - MWFixed Load Generation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration attributable to [Fixed Load] constraint.
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance cost
Fuel Contract Cost - $Fuel Contract Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of fuel purchased under contract
Fuel Cost - $Fuel Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fuel bill
Fuel Inventory Cost - $Fuel Inventory Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of fuel stockpile.
Fuel Market Revenue - $Fuel Market Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from fuel markets
Fuel Offtake - GJ (Metric), MMBtu (U.S. Imperial)Fuel Offtake - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseFuel offtake
Fuel Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Fuel Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseAverage fuel price
Fuel Transition Cost - $Fuel Transition Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of transitioning between Fuels.
Fuel Transport Cost - $Fuel Transport Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of transporting fuel to the generator
Gas Demand - GJ (Metric), MMBtu (U.S. Imperial)Gas Demand - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal gas demand for the company
Gas Imbalance - GJ (Metric), MMBtu (U.S. Imperial)Gas Imbalance - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal gas supply imbalance for the company (Gas Demand - Gas Supply)
Gas Market Revenue - $Gas Market Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from gas markets
Gas Supply - GJ (Metric), MMBtu (U.S. Imperial)Gas Supply - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal gas supply for the company
Generation - MWGeneration - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseOwn generation + generation contracts
Generation at RRN - MWGeneration at RRN - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseOwn generation taken to the regional reference node
Generation Cost - $Generation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration cost
Generation-weighted Price - $/MWhGeneration-weighted Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration-weighted average price
Generator Firm Capacity - MWGenerator Firm Capacity - MWCapacityLT Plan, MT Schedule, ST ScheduleFalseCapacity provided by generators
Generator Monopoly Rent - $Generator Monopoly Rent - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseMonopoly rent from competitive bidding
Generator Start & Shutdown Cost - $Generator Start & Shutdown Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal cost of generation unit starts
Heat Market Revenue - $Heat Market Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from heat markets
Inertia - MW·sInertia - GW·sProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of inertia
Installed Capacity - MWInstalled Capacity - MWCapacityLT Plan, MT Schedule, ST ScheduleFalseInstalled generation capacity
Levelized Cost - $/MWhLevelized Cost - $/MWhExpansionLT PlanFalseLevelized cost of electricity
Load - MWLoad - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseOwn load + load contracts
Load-weighted Price - $/MWhLoad-weighted Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseLoad-weighted average price
Loss Allocation - MWLoss Allocation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseLosses allocated to the company.
Lower Reserve - MWLower Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of lower (spin down) reserve
Min Load Generation - MWMin Load Generation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration attributable to Min Load constraint
Net Balancing Area Interchange - MWNet Balancing Area Interchange - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseNet Financial Interchange for the company (Financial Exports - Financial Imports)
Net Balancing Area Interchange Revenue - $Net Balancing Area Interchange Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet Financial Revenue (Financial Export Revenue - Financial Imports Cost)
Net Contract Revenue - $Net Contract Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet revenue from physical contracts
Net Contract Settlement - $Net Contract Settlement - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseMonies received (+ve) or paid out (-ve) on CfDs net of interconnector surpluses
Net Contract Volume - MWNet Contract Volume - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseNet volume on CfDs (generation - contract volume)
Net Cost to Load - $Net Cost to Load - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet cost to load
Net Generation - MWNet Generation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseMax(0, generation - purchase)
Net Generation Revenue - $Net Generation Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet generator pool revenue
Net Load - MWNet Load - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseMax(0, load - generation)
Net New Capacity - MWNet New Capacity - MWExpansionLT PlanFalseNet Capacity (cumulative Max Capacity x (Units Built - Units Retired))
Net Pool Revenue - $Net Pool Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePool revenue plus financial contract settlement
Net Profit - $Net Profit - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet profit
Net Reserves Revenue - $Net Reserves Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet revenue from provision of reserves
Net Revenue - $Net Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet revenue
No Cost Capacity - MWNo Cost Energy - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseCapacity available at no cost.
Pool Revenue - $Pool Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePool revenue from own generation + generation contracts
Price Paid - $/MWhPrice Paid - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseWeighted average price paid for purchases
Price Received - $/MWhPrice Received - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseWeighted average price received for generation
Pump Cost - $Pump Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePool cost for pump energy
Pump Load - MWPump Load - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseLoad drawn by pump storage generators
Purchaser Load - MWPurchaser Load - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseLoad from cleared purchaser bids
Raise Reserve - MWRaise Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of raise (spin up) reserve
Regulation Lower Reserve - MWRegulation Lower Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of regulation lower reserve
Regulation Raise Reserve - MWRegulation Raise Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of regulation raise reserve
Replacement Reserve - MWReplacement Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of replacement reserve
Reserves Cost - $Reserves Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost from reserves
Reserves Revenue - $Reserves Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from provision of reserves
Reserves VO&M Cost - $Reserves VO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseVariable operations and maintenance cost associated with providing reserves
Retirement Cost - $000Retirement Cost - $000ExpansionLT PlanFalseCost of units retired
Shadow Capacity Built - MWShadow Capacity Built - MWExpansionLT PlanFalseCapacity built (Max Capacity x Units Built) before Competition models.
Shadow Generation - MWShadow Generation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseGeneration before uplift or Competition models.
SRMC - $/MWhSRMC - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseWeighted average SRMC of the company sent out generation
Start Fuel Cost - $Start Fuel Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of fuel for unit starts
Start Fuel Offtake - GJ (Metric), MMBtu (U.S. Imperial)Start Fuel Offtake - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseStart fuel offtake
Strategic Shadow Price - $/MWhStrategic Shadow Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price on the Company [Strategic] constraint.
Total Cost - $000Total Cost - $000ExpansionLT PlanFalseTotal of fixed and variable generation costs
Total Generation Cost - $Total Generation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal of generation and start and shutdown costs and emissions costs
Total System Cost - $Total System Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal system cost including fuel, VO&M, start and shutdown costs, emissions costs and ramp costs.
Transmission Rental - $Transmission Rental - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseSettlement surplus on own transmission lines
Undispatched Capacity - MWUndispatched Energy - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseCapacity on-line but undispatched
Unserved Energy Allocation - MWUnserved Energy Allocation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseUnserved energy (USE) allocated to the company.
UoS Cost - $UoS Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal use of system cost
VO&M Cost - $VO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal variable operation and maintenance cost
Waste Heat - GJ (Metric), MMBtu (U.S. Imperial)Waste Heat - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseWaste heat from generation
x xPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution

Company.Fuels Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Inventory Cost - $Inventory Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCosts associated with fuel stockpile
Offtake - GJ (Metric), MMBtu (U.S. Imperial)Offtake - TJ (Metric), BBtu (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseFuel offtake
Offtake Ratio - %Offtake Ratio - %-LT Plan, MT Schedule, ST ScheduleFalseProportion of fuel used by the generators

Company.Emissions Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Abatement - kg (Metric), lb (U.S. Imperial)Abatement - tonne (Metric), ton (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseEmissions abated
Abatement Cost - $Abatement Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of emission abatement
Allocation - kg (Metric), lb (U.S. Imperial)Allocation - tonne (Metric), ton (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseEmission rights allocation
Cost - $Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseEmission cost net of rights allocation
Generation - MWGeneration - GWh-LT Plan, MT Schedule, ST ScheduleFalseGeneration associated with the emission
Gross Production - kg (Metric), lb (U.S. Imperial)Gross Production - tonne (Metric), ton (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseEmissions prior to removal or abatement
Intensity - kg/MWh (Metric), lb/MWh (U.S. Imperial)Intensity - kg/MWh (Metric), lb/MWh (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseEmission intensity of generation
Production - kg (Metric), lb (U.S. Imperial)Production - tonne (Metric), ton (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseNet production of the emission
Removal - kg (Metric), lb (U.S. Imperial)Removal - tonne (Metric), ton (U.S. Imperial)-LT Plan, MT Schedule, ST ScheduleFalseEmissions removed
Removal Cost - $Removal Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of emission removal

Company.Reserves Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Provision - MWProvision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve revenue

Company.Regions Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Capacity - MWAvailable Capacity - GWh-LT Plan, MT Schedule, ST ScheduleFalseAvailable generation capacity in region
Contract Settlement - $Contract Settlement - $000-LT Plan, MT Schedule, ST ScheduleFalseMonies received (+ve) or paid out (-ve) on CfDs in the region
Contract Shortfall - MWContract Shortfall - GWh-LT Plan, MT Schedule, ST ScheduleFalseShortfall of generation for contracts in region (pro-rated)
Contract Volume - MWContract Volume - GWh-LT Plan, MT Schedule, ST ScheduleFalseVolume of financial contracts (CfDs) sold in the region
Generation - MWGeneration - GWh-LT Plan, MT Schedule, ST ScheduleFalseGeneration in region
Generation at RRN - MWGeneration at RRN - GWh-LT Plan, MT Schedule, ST ScheduleFalseOwn generation taken to the regional reference node
Installed Capacity - MWInstalled Capacity - MW-LT Plan, MT Schedule, ST ScheduleFalseInstalled capacity in region
Load - MWLoad - GWh-LT Plan, MT Schedule, ST ScheduleFalseOwn load in region
Marginal Cost - $/MWhMarginal Cost - $/MWh-LT Plan, MT Schedule, ST ScheduleFalseMarginal cost of generation in the Region
Net Contract Settlement - $Net Contract Settlement - $000-LT Plan, MT Schedule, ST ScheduleFalseMonies received (+ve) or paid out (-ve) on CfDs net of interconnector surpluses
Net Contract Volume - MWNet Contract Volume - GWh-LT Plan, MT Schedule, ST ScheduleFalseNet volume on CfDs (generation - contract volume)
Pool Revenue - $Pool Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalsePool revenue from own generation + generation contracts in region
Price Received - $/MWhPrice Received - $/MWh-LT Plan, MT Schedule, ST ScheduleFalseWeighted average price received for generation in region
Shadow Generation - MWShadow Generation - GWh-LT Plan, MT Schedule, ST ScheduleFalseGeneration before uplift or Competition models.

Company.Companies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Balancing Area Interchange Exports - MWBalancing Area Interchange Exports - GWh-LT Plan, MT Schedule, ST ScheduleFalseFinancial exports from parent company to child company
Balancing Area Interchange Exports Revenue - $Balancing Area Interchange Exports Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseRevenue from financial exports from the region
Balancing Area Interchange Imports - MWBalancing Area Interchange Imports - GWh-LT Plan, MT Schedule, ST ScheduleFalseFinancial imports to the parent region from child region
Balancing Area Interchange Imports Cost - $Balancing Area Interchange Imports Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of financial imports to the region
Net Balancing Area Interchange - MWNet Balancing Area Interchange - GWh-LT Plan, MT Schedule, ST ScheduleFalseNet Financial Interchange (Financial Exports - Financial Imports)
Net Balancing Area Interchange Revenue - $Net Balancing Area Interchange Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseNet Financial Revenue (Financial Export Revenue - Financial Imports Cost)