Gas Field Index

Gas Field Attributes

NameUnitsDefault ValueValidation RuleDescription
Energy Density-0Energy per unit of the gas
Unit-0Unit the gas is measured in

Gas Field Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Balance Period-False0In (0,1,2,3,4,5,6)FalseFrequency of storage balance
Build Cost$000False0FalseCost of developing the gas field
Decomposition Bound Penalty$/~False1000000≥0FalsePenalty applied to violation of storage bounds when the decomposition implies possible violations.
Decomposition Method-False1In (0,1,2)FalseMethod used to pass the optimal storage trajectory from one simulation phase to the next.
Decomposition Penalty a-False0.0489FalseDecomposition storage target penalty function 'a' term.
Decomposition Penalty b-False0.6931FalseDecomposition storage target penalty function 'b' term.
Decomposition Penalty c-False0FalseDecomposition storage target penalty function 'c' term.
Decomposition Penalty x-False1.1FalseDecomposition storage target penalty function 'x' term.
Dispatch Production Cost$/~True0FalseIncremental dispatch cost of extracting gas from the field
Economic LifeyrFalse30≥0FalseEconomic life of the gas field (period over which fixed costs are recovered).
End Effects Method-False1In (1,2)FalseMethod used to value or constrain end-of-period gas volumes.
Enforce BoundsYes/NoFalse-1In (0,-1)FalseIf the storage bounds are enforced.
Expansion Optimality-False2In (0,2)FalseExpansion planning integerization scheme.
External Injection1000·~ (Metric), ~ (U.S. Imperial)False0FalseExternal injection into the gas field
FO&M Charge$000False0FalseAnnual fixed operation and maintenance charge
Forced Outage Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to forced outage
Heat Value-False0≥0FalseHeat value of gas produced by the Gas Field
Initial Volume1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseInitial volume of gas in the field
Internal Volume Scalar-False1>0FalseStorage volume scaling factor used internal to the mathematical program.
Lead TimeyrFalse0≥0FalseNumber of years after which the expansion project can begin
Maintenance Frequency-True0≥0FalseFrequency of maintenance outages in an annual time frame
Maintenance Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to maintenance
Max Production1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum production of gas from the field
Max Production Day1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum production of gas from the field in any day
Max Production Hour1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum hourly production of gas from the field
Max Production Month1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum production of gas from the field in any month
Max Production Target Percent%False100Between 0 And 100FalseMax Production Target Percent for gas fields
Max Production Week1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum production of gas from the field in any week
Max Production Year1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum production of gas from the field in any year
Max Ramp1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field
Max Ramp Day1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field in a day
Max Ramp Hour1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field in a hour
Max Ramp Month1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field in a month
Max Ramp Week1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field in a week
Max Ramp Year1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum rate of change in gas field in a year
Max Time To RepairhTrue0≥0FalseMaximum time to repair
Max Units Built-False0In (0,1)FalseBinary indicating if this is a build candidate
Max Units Built in Year-False1In (0,1)FalseBinary indicating if build is allowed in this year
Mean Time to RepairhTrue24≥0FalseMean time to repair
Min Production1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum production of gas from the field
Min Production Day1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum daily production of gas from the field
Min Production Hour1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum hourly production of gas from the field
Min Production Month1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum monthly production of gas from the field
Min Production Target Percent%False0Between 0 And 100FalseMin Production Target Percent for gas fields
Min Production Week1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum weekly production of gas from the field
Min Production Year1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum annual production of gas from the field
Min Time To RepairhTrue0≥0FalseMinimum time to repair
Model Capital Cost RecoveryYes/NoFalse0In (0,1)FalseIndicates if capital cost recovery feature is modeled for expansion planning
Outage Max Production1000·~ (Metric), ~ (U.S. Imperial)True0FalseField Max Production during the outage
Production Cost$/~True0FalseIncremental cost of extracting gas from the field
Production Tranches-False1≥0FalseNumber of production tranches to generate (must be > 1 to auto-generate)
Production Volume1000·~ (Metric), ~ (U.S. Imperial)True1E+30≥0FalseVolume of gas in Production Cost band
Project Start Date-False36526≥0FalseStart date of gas field project, for expansion planning.
Random Number Seed-False0Between 0 And 2147483647FalseRandom number seed assigned to the pipeline for the generation of outages
Ratchet Type-False0In (0,1,2)FalseIndicates how the gas field ratchets are represented
Recycle Penalty$/~False-1FalsePenalty for violating the recycling constraint.
Repair Time Distribution-True-1In (-1,0,1,2,3,4,5,6,7)FalseDistribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV)
Repair Time Scale-True0FalseRepair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV)
Repair Time Shape-True0FalseRepair time function shape parameter (for Weibull,lognormal)
Reset Production VolumesYes/NoFalse0In (0,-1)FalseIf the production volumes should be reset in the current period.
Target1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseGas Field Target
Target Day1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseEnd of day gas field target
Target Hour1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseEnd of hour gas field target
Target Month1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseEnd of month gas field target
Target Penalty$/~False-1FalsePenalty for violating the target
Target Week1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseEnd of week gas field target
Target Year1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseEnd of year gas field target
Technical LifeyrFalse1E+30≥0FalseTechnical lifetime of the gas field
Units-False1In (0,1)TrueFlag if the Gas Field is in service
Use Additive RatchetYes/NoFalse-1In (0,-1)FalseIf additive ratchet use is enforced.
WACC%False10≥0FalseWeighted average cost of capital
Withdrawal Ratchet1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum amount of gas that can be withdrawn from the field in any interval when defining a gas field ratchet.
Withdrawal Rate Scalar%True0FalseMaximum amount of gas that can be withdrawn from the field.
Withdrawal Volume Factor%True0≥0FalseGas withdrawal factor for gas field.
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Gas Field Gas Node Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Max Blend Percent%False0≥0FalseMaximum percentage of the gas produced by the Gas Field in the blend
Min Blend Percent%False0≥0FalseMinimum percentage of the gas produced by the Gas Field in the blend
Participation Factor-False1Between -1 And 1FalseProportion of gas field contributing to a gas node

Gas Field Gas Basin Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Participation Factor-False1Between -1 And 1FalseProportion of gas field contributing to a gas basin

Gas Field Companies Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Share%False100Between 0 And 100FalseCompany's share of gas field

Gas Field Maintenances Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Outage Max Production1000·~ (Metric), ~ (U.S. Imperial)False0FalseMax Production during the outage

Gas Field Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
End Volume Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas field end volume
Production Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas field production in the constraint
Ramp Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of change in gas field end volume in the constraint
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year constraint

Gas Field Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
End Volume Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas field end volume
Production Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas field production
Ramp Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of change in gas field end volume
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year

Gas Field Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of developing the gas field
Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseDispatch Price
End Volume - TJ (Metric), BBtu (U.S. Imperial)End Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseStorage volume at the end of the period
Fixed Costs - $Fixed Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fixed costs including amortized build costs
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance cost
Forced Outage - GJ (Metric), MMBtu (U.S. Imperial)Forced Outage - TJ (Metric), BBtu (U.S. Imperial)ReliabilityLT Plan, MT Schedule, ST ScheduleFalseCapacity of Production on Forced Outage
Forced Outage Hours - hForced Outage Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the gas field is on forced outage of production
Initial Volume - TJ (Metric), BBtu (U.S. Imperial)Initial Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseInitial volume of gas in the field
Maintenance - GJ (Metric), MMBtu (U.S. Imperial)Maintenance - TJ (Metric), BBtu (U.S. Imperial)ReliabilityLT Plan, PASA, MT Schedule, ST ScheduleFalseCapacity of Production on maintenance
Maintenance Hours - hMaintenance Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the gas field is on maintenance
Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseAverage price of producing gas
Production - GJ (Metric), MMBtu (U.S. Imperial)Production - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseQuantity of gas produced by the gas field
Production Cost - $Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseIncremental cost of extracting gas from the field
Recovered Capital Cost - $Recovered Capital Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovered by extracting gas from the field
Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovery price of gas field expansion
Service Factor - %Service Factor - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of Field capacity available in production
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of gas in the field
Units UnitsProductionLT PlanFalseFlag if the Gas Field is in service
Units Built Units BuiltExpansionLT PlanFalseFlag if the gas field is built in this year
Units Out ReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of units out of service
x xPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution

Gas Field.Companies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Fixed Costs - $Fixed Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fixed costs including amortized build costs
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance costs
Net Profit - $Net Profit - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet Profit = Net Revenue - Fixed Costs
Net Revenue - $Net Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet Revenue
Production - TJ (Metric), MMBtu (U.S. Imperial)Production - TJ (Metric), MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal production from gas field
Production Cost - $Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseProduction costs associated with company gas field production
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price associated with gas scarcity