Reliability Skip Steps
Units: | Yes/No |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | In (0,1) |
Key Property: | No |
Description: | Indicates steps that should be skipped. |
Detail: |
Reliabilities Skip Steps indicates steps that should be skipped during ST Schedule. List of steps to be skipped is specified as time-series values indicating the steps to be skipped. A step is skipped if it is not the first step of the simulation, and all intervals within the step are marked as such.
Example:
In the following example, all intervals in January 2017 are to be skipped, except those in January 16th. Since the ST Schedule daily steps, only 2 steps will be evaluated,January 1st and January 16th.
Skip Step Input:
ST Schedule Horizon: