Reserve Generators Initial Pump Load Raise Provision
Units: | MW |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Pump load raise reserve provision at time zero |
Detail: |
Reserve Generators Initial Pump Load Raise Provision is Pump load raise reserve provision at time zero, which is the Lower Reserve part of Pump Dispatchable Load Provision. It should be set when Duration is defined.