WaterNode Production Cost

Units: $
Mode: Output Only
Multi-band: False
Default Value:
Validation Rule:
Key Property: No
Description: Cost of flowing water through the node
Detail:

Water Node Production Cost is Cost of flowing water through the node and is calculated as:

Production Cost = Flow × Flow Charge

See also: