Units: | 1000·~ (Metric), ~ (U.S. Imperial) |
Mode: | Input Only |
Multi-band: | True |
Default Value: | 1E+30 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Gas production point for use with multi-band Max Ramp Up constraints |
Gas Plant Ramp Up Point is Gas production point for use with multi-band Max Ramp Up constraints.