Name | Units | Default Value | Validation Rule | Description |
---|---|---|---|---|
Energy Density | - | 0 | Energy per unit of the gas | |
Unit | - | 0 | Unit the gas is measured in |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Annual Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Annual Expansion Max Volume for the Transports |
Boil off Rate | %/day | False | 0 | False | Rate of boil off of gas during the voyage | |
Build Cost | $000 | False | 0 | False | Cost of building the Gas Transport | |
Charter Rate | $ | False | 0 | False | The charter cost of gas transport per delivery | |
Charter Rate Day | $ | False | 0 | False | The charter cost of gas transport per day | |
Discharge Time | day | False | 0 | ≥0 | False | Time taken to unload gas from the transport |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the gas transport (period over which fixed costs are recovered). |
Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 1E+30 | ≥0 | False | Expansion Max Volume is the volume up to which the capacity of the transport can be expanded |
Expansion Optimality | - | False | 0 | In (0,2) | False | Expansion planning integerization scheme. |
Expansion Transport | - | False | 0 | In (0,1) | False | Indicates if the gas Transport is eligible for expansion planning |
Forced Outage Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the Gas Transport is unavailable due to forced outage |
Formulate Round Trip | Yes/No | False | -1 | In (0,-1) | False | If the Gas Transport should return to the Export node before setting out on the next voyage |
Heat Value | - | False | 0 | ≥0 | False | Heat value of gas shipped by the Gas Transport |
Idle Boil off Rate | %/day | False | 0 | False | Rate of boil off of gas during the harbouring at the export and import gas nodes | |
Integerization Horizon | yr | False | -1 | ≥-1 | False | Number of years over which the expansion decisions are integerized |
Is Available | Yes/No | False | 1 | In (0,1) | False | Indicates if Gas Transport is available for flow. |
Lead Time | yr | False | 0 | ≥0 | False | Number of years after which the expansion project can begin |
Loading Time | day | False | 0 | ≥0 | False | Time taken to load gas into the transport |
Maintenance Frequency | - | True | 0 | ≥0 | False | Frequency of maintenance outages in an annual time frame |
Maintenance Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the Gas Transport is unavailable due to maintenance |
Max Build Events | - | False | 1 | ≥0 | False | Maximum number of distinct build events allowed over the planning horizon |
Max Shipments | - | False | 1E+30 | ≥0 | False | Maximum number of voyages in each step in the simulation horizon |
Max Shipments Day | - | False | 1E+30 | ≥0 | False | Maximum daily number of voyages |
Max Shipments Hour | - | False | 1E+30 | ≥0 | False | Maximum hourly number of voyages |
Max Shipments Month | - | False | 1E+30 | ≥0 | False | Maximum monthly number of voyages |
Max Shipments Week | - | False | 1E+30 | ≥0 | False | Maximum weekly number of voyages |
Max Shipments Year | - | False | 1E+30 | ≥0 | False | Maximum annual number of voyages |
Max Time To Repair | h | True | 0 | ≥0 | False | Maximum time to repair |
Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | False | Maximum volume of gas the transport can carry | |
Mean Time to Repair | h | True | 24 | ≥0 | False | Mean time to repair |
Min Time To Repair | h | True | 0 | ≥0 | False | Minimum time to repair |
Min Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Minimum volume of gas the transport can carry | |
Project Start Date | - | False | 36526 | ≥0 | False | Start date of Gas Transport project, for expansion planning. |
Random Number Seed | - | False | 0 | Between 0 And 2147483647 | False | Random number seed assigned to the Gas transport for the generation of outages |
Repair Time Distribution | - | True | -1 | In (-1,0,1,2,3,4,5,6,7) | False | Distribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV) |
Repair Time Scale | - | True | 0 | False | Repair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV) | |
Repair Time Shape | - | True | 0 | False | Repair time function shape parameter (for Weibull,lognormal) | |
Retirement Cost | $000 | False | 0 | False | Cost of retiring the gas transport | |
Retirement Transport | - | False | 0 | In (0,1) | False | Indicates if the gas transport is eligible for retirement planning |
Shipping Charge | $/~ | False | 0 | False | The per unit cost of shipping the gas on the transport | |
Technical Life | yr | False | 1E+30 | ≥0 | False | Technical lifetime of the Gas Transport |
Voyage Time | day | False | 0 | ≥0 | False | Time taken for the voyage from Export Node to Import Node |
x | - | True | 0 | False | Pass-through value (summed in summary) | |
y | - | True | 0 | False | Pass-through value (summed in summary) | |
z | - | True | 0 | False | Pass-through value (averaged in summary) |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Port Fees | $ | False | 0 | False | Cost of using Gas Node by gas transport per day |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Initial Gas Delivered | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | The amount of gas to be delivered to a gas node on the initial gas path | |
Port Fees | $ | False | 0 | False | Cost of using gas node by gas transport per day |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Canal Fees | $ | False | 0 | False | Cost of using all canals in gas path by gas transport |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Initial Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | True | Initial volume of gas being carried by the gas transport | |
Voyage Progress | % | False | 0 | ≥0 | True | Percentage of voyage already completed |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Outage Factor | % | False | 0 | False | Proportion of capacity during outage |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Shipments Coefficient | - | False | 0 | False | Coefficient of gas transport voyage count |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Shipments Coefficient | - | False | 0 | False | Coefficient of gas transport voyage count |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Build Cost - $000 | Build Cost - $000 | Expansion | LT Plan | False | Cost of building the gas transport |
Build Events | Build Events | Expansion | LT Plan | False | Number of build events |
Canal Cost - $ | Canal Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of using canal by gas transport |
Charter Cost - $ | Charter Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Charter cost of gas transport |
Contract Imports - GJ (Metric), MMBtu (U.S. Imperial) | Contract Imports - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Delivered gas associated with gas contracts |
Discharge Time - day | Discharge Time - day | Production | LT Plan, MT Schedule, ST Schedule | False | Time taken to unload gas from the transport |
Emission Cost - $ | Emission Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost from production of emissions |
Exports - GJ (Metric), MMBtu (U.S. Imperial) | Exports - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas loaded at the export gas node |
Fixed Costs - $ | Fixed Costs - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total fixed costs including amortized build costs |
Forced Outage - GJ (Metric), MMBtu (U.S. Imperial) | Forced Outage - TJ (Metric), BBtu (U.S. Imperial) | Reliability | LT Plan, MT Schedule, ST Schedule | False | Volume on Forced Outage |
Forced Outage Hours - h | Forced Outage Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours the gas transport is on forced outage |
Harbour Time - day | Harbour Time - day | Production | LT Plan, MT Schedule, ST Schedule | False | Gas transport harbour time |
Idle Boil off - GJ (Metric), MMBtu (U.S. Imperial) | Idle Boil off - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas lost while waiting in the harbour |
Imports - GJ (Metric), MMBtu (U.S. Imperial) | Imports - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas discharged at the import gas node |
Loading Time - day | Loading Time - day | Production | LT Plan, MT Schedule, ST Schedule | False | Time taken to load gas into the transport |
Losses - GJ (Metric), MMBtu (U.S. Imperial) | Losses - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas lost during the voyage |
Maintenance - GJ (Metric), MMBtu (U.S. Imperial) | Maintenance - TJ (Metric), BBtu (U.S. Imperial) | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Capacity out on maintenance |
Maintenance Hours - h | Maintenance Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours the gas transport is on maintenance |
Max Volume Built - GJ (Metric), MMBtu (U.S. Imperial) | Max Volume Built - TJ (Metric), BBtu (U.S. Imperial) | Expansion | LT Plan | False | Amount of increase in Gas Transport Max Volume |
Max Volume Retired - GJ (Metric), MMBtu (U.S. Imperial) | Max Volume Retired - TJ (Metric), BBtu (U.S. Imperial) | Expansion | LT Plan | False | Amount of reduction in Gas Transport Max Volume |
Port Cost - $ | Port Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of using port by gas transport |
Retirement Cost - $000 | Retirement Cost - $000 | Expansion | LT Plan | False | Cost of retiring the Gas Transport |
Service Factor - % | Service Factor - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of Gas transport capacity available for delivery |
Shipping Cost - $ | Shipping Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of shipping |
Spot Imports - GJ (Metric), MMBtu (U.S. Imperial) | Spot Imports - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Delivered gas associated with spot market shipments |
Total Voyage Time - day | Total Voyage Time - day | Production | LT Plan, MT Schedule, ST Schedule | False | Gas transport total voyage time |
Travel Time - day | Travel Time - day | Production | LT Plan, MT Schedule, ST Schedule | False | Gas transport travel time |
Units Out | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of units out of service | |
Variable Cost - $ | Variable Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Variable operation and maintenance cost |
Voyage Progress - % | Voyage Progress - % | Production | LT Plan, MT Schedule, ST Schedule | False | Percentage of voyage completed |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Pass-through value (summed in summary) |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Pass-through value (summed in summary) |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Pass-through value (averaged in summary) |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by Power2X to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by Power2X to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas field to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas field to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas plant to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas plant to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Energy - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas storage to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas storage to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas contract to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas contract to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by Gas Transport to the gas transport |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by Gas Transport to the gas transport |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Canal Cost - $ | Canal Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of using canal by gas transport |