Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Bid Base | MW | False | 0 | False | Base load for balancing bid | |
Bid Price | $/MWh | True | -10000 | False | Energy bid price | |
Bid Quantity | MW | True | 0 | False | Quantity bid in band | |
Build Cost | $/kW | True | 0 | False | Cost of building a unit | |
Build Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the unit (period over which fixed costs are recovered). |
Efficiency | % | True | 100 | False | Efficiency of energy conversion process | |
Expansion Optimality | - | False | 2 | In (0,2) | False | Expansion planning integerization scheme |
Firm Capacity | MW | True | 0 | False | Contribution of the Power2X to capacity reserves | |
FO&M Charge | $/kW/yr | False | 0 | False | Annual fixed operation and maintenance charge | |
Forced Outage | MW | False | 0 | ≥0 | False | Capacity lost to forced outage |
Forced Outage Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to forced outage |
Formulate Non-convex | - | False | 1 | In (0,1,2) | False | Controls when integers are used to enforce clearing of marginal efficiency tranches in order |
Heat Value | - | False | 0 | ≥0 | False | Heat value of gas produced by the Power2X object |
Inertia Constant | s | False | 0 | ≥0 | False | Stored energy per unit of power |
Initial Age | yr | False | 0 | False | Age of the Power2X in years at the start of the simulation horizon | |
Integerization Horizon | yr | False | -1 | ≥-1 | False | Number of years over which the expansion decisions are integerized |
LCCR Apply Discounting | Yes/No | False | 0 | In (0,-1) | False | If the discount rate should be applied to the LCCR |
Levelized Capital Carrying Rate | % | False | 0 | ≥0 | False | Levelized capital carrying rate |
Load Point | MW | True | 0 | ≥0 | False | Load point for use with multi-point efficiency |
Maintenance Frequency | - | True | 0 | ≥0 | False | Frequency of maintenance outages in an annual time frame |
Maintenance Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to maintenance |
Max Capacity Factor | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor (production constraint) |
Max Capacity Factor Day | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in day |
Max Capacity Factor Hour | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in hour |
Max Capacity Factor Month | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in month |
Max Capacity Factor Week | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in week |
Max Capacity Factor Year | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in year |
Max Efficiency Tranches | - | False | 0 | Between 1 And 100 | False | Maximum number of tranches in the efficiency piecewise linear approximation |
Max Load | MW | False | 0 | False | Maximum load of each unit | |
Max Production | GJ (Metric), MMBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production |
Max Production Day | TJ (Metric), BBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production in day |
Max Production Hour | GJ (Metric), MMBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production in hour |
Max Production Month | TJ (Metric), BBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production in month |
Max Production Penalty | $/GWh | False | -1 | False | Penalty applied to violations of [Max Production] and [Max Capacity Factor] constraints. | |
Max Production Week | TJ (Metric), BBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production in week |
Max Production Year | TJ (Metric), BBtu (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum production in year |
Max Ramp Down | MW/min | True | 1E+30 | ≥0 | False | Maximum ramp down rate that applies at the given load point |
Max Ramp Down Penalty | $/MW | True | -1 | False | Penalty for violating [Max Ramp Down] constraint. | |
Max Ramp Up | MW/min | True | 1E+30 | ≥0 | False | Maximum ramp up rate that applies at the given load point |
Max Ramp Up Penalty | $/MW | True | -1 | False | Penalty for violating [Max Ramp Up] constraint. | |
Max Starts | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed |
Max Starts Day | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a day |
Max Starts Hour | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a hour |
Max Starts Month | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a month |
Max Starts Penalty | $ | False | -1 | False | Penalty applied to violations of [Max Starts] constraints. | |
Max Starts Week | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a week |
Max Starts Year | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a year |
Max Time To Repair | h | True | 0 | ≥0 | False | Maximum time to repair |
Max Units Built | - | False | 0 | ≥0 | False | Maximum number of units automatically constructed in aggregate over the planning horizon |
Max Units Built in Year | - | False | 1E+30 | ≥0 | False | Maximum number of units automatically constructed in any single year of the planning horizon |
Mean Time to Repair | h | True | 24 | ≥0 | False | Mean time to repair |
Min Capacity Factor | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor |
Min Capacity Factor Day | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in day |
Min Capacity Factor Hour | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in hour |
Min Capacity Factor Month | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in month |
Min Capacity Factor Week | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in week |
Min Capacity Factor Year | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in year |
Min Down Time | h | False | 0 | ≥0 | False | Minimum number of hours a unit must be off after being shut down |
Min Production | GJ (Metric), MMBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production |
Min Production Day | TJ (Metric), BBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production in day |
Min Production Hour | GJ (Metric), MMBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production in hour |
Min Production Month | TJ (Metric), BBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production in month |
Min Production Penalty | $/GWh | False | 10000000 | False | Penalty applied to violations of [Min Production] and [Min Capacity Factor] constraints. | |
Min Production Week | TJ (Metric), BBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production in week |
Min Production Year | TJ (Metric), BBtu (U.S. Imperial) | False | 0 | ≥0 | False | Minimum production in year |
Min Stable Factor | % | False | 0 | ≥0 | False | Minimum stable operation level as a proportion of [Max Load] |
Min Stable Level | MW | False | 0 | ≥0 | False | Minimum allowed electric load when operating |
Min Time To Repair | h | True | 0 | ≥0 | False | Minimum time to repair |
Min Units Built | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in aggregate over the planning horizon |
Min Units Built in Year | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in any single year of the planning horizon |
Min Up Time | h | False | 0 | ≥0 | False | Minimum number of hours a unit must be run after being started |
Model Capital Cost Recovery | Yes/No | False | 0 | In (0,1) | False | Indicates if capital cost recovery feature is modeled |
Outage Factor | % | True | 100 | Between 0 And 100 | False | Unit outage rating based on the unit capacity |
Outage Rating | MW | True | 0 | False | Unit rating during outage | |
Power Degradation | % | False | 0 | False | Annual degradation of efficiency with age | |
Project Start Date | - | False | 36526 | ≥0 | False | Start date of generation project, for expansion planning. |
Ramp Down Charge | $/MW | True | 0 | False | Charge applied to ramping down | |
Ramp Down Point | MW | True | 1E+30 | ≥0 | False | Load point for use with multi-band Max Ramp Down constraints |
Ramp Up Charge | $/MW | True | 0 | False | Charge applied to ramping up | |
Ramp Up Point | MW | True | 1E+30 | ≥0 | False | Load point for use with multi-band Max Ramp Up constraints |
Repair Time Distribution | - | True | -1 | In (-1,0,1,2,3,4,5,6,7) | False | Distribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV) |
Repair Time Scale | - | True | 0 | False | Repair time function scale parameter (for exponential, Weibull, lognormal, SEV, LEV) | |
Repair Time Shape | - | True | 0 | False | Repair time function shape parameter (for Weibull, lognormal) | |
Retire Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Run Down Rate | MW/min | False | 1E+30 | ≥0 | False | Ramp rate that applies while running the unit down from [Min Stable Level] to zero |
Run Up Rate | MW/min | True | 1E+30 | ≥0 | False | Ramp rate that applies while increasing load from zero to [Min Stable Level]. |
Shutdown Cost | $ | False | 0 | ≥0 | False | Cost of shutting down a unit |
Shutdown Penalty | $ | False | 0 | False | Penalty applied to shutting down a unit | |
Shutdown Profile | MW | False | 0 | False | Detailed regime for running the unit down from [Min Stable Level] when [Run Down Rate] is non-constant. | |
Start Cost | $ | True | 0 | ≥0 | False | Cost of starting a unit |
Start Cost Time | h | True | 0 | ≥0 | False | Incremental cooling time over which the corresponding Start Cost applies |
Start Penalty | $ | False | 0 | False | Penalty applied to starting a unit | |
Start Profile | MW | True | 1E+30 | False | Detailed regime for increasing load from zero to [Min Stable Level] when [Run Up Rate] is non-constant. | |
Start Profile Penalty | $/MWh | False | -1 | False | Penalty for violation of [Start Profile]. | |
Technical Life | yr | False | 1E+30 | ≥0 | False | Technical lifetime of the unit |
Units | - | False | 0 | ≥0 | True | Number of installed units |
Units Out | - | True | 0 | ≥0 | False | Number of units out of service due to maintenance |
VO&M Charge | $/MWh | False | 0 | False | Variable operation and maintenance charge | |
WACC | % | False | 10 | ≥0 | False | Weighted average cost of capital |
Water Consumption | m³/MWh (Metric), gal./MWh (U.S. Imperial) | False | 0 | False | Water consumed by the Power2X facility | |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this fuel produced |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Load Participation Factor | - | False | 1 | Between -1 And 1 | False | Proportion of facility load at the node |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this facility's output that gets injected to this Heat Node |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this facility's output that gets injected to this Heat Storage |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Max Blend Percent | % | False | 0 | ≥0 | False | Maximum percentage of the gas produced by Power2X in the blend |
Min Blend Percent | % | False | 0 | ≥0 | False | Minimum percentage of the gas produced by Power2X in the blend |
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this facility's output that gets injected to this Gas Node |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this facility's output that gets injected to this Gas Storage |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | False | 1 | Between 0 And 1 | False | Proportion of this facility's water consumption that gets drawn from this Water Node |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Share | % | False | 100 | Between 0 And 100 | False | Percentage share of ownership |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Ratio | - | True | 1 | False | Amount of the Commodity produced per unit of input energy to the facility |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Coefficient | GJ (Metric), MMBtu (U.S. Imperial) | False | 0 | False | Amount of the Power2X production on the Flow Node injected(positive)/withdrawn(negative) per unit of production |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Acceptable Risk Coefficient | - | False | 0 | False | Coefficient of entity acceptable risk | |
Build Cost Coefficient | $ | False | 0 | False | Coefficient of total build cost | |
Built Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any generation capacity is built to date | |
Built in Year Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any generation capacity is built in the year | |
Capacity Built Coefficient | MW | False | 0 | False | Coefficient of capacity built | |
Fixed Costs Coefficient | $ | False | 0 | False | Coefficient of fixed costs | |
Inertia Provision Coefficient | MW·s | False | 0 | False | Coefficient of inertia provision | |
Installed Capacity Coefficient | MW | False | 0 | False | Coefficient of installed capacity | |
Load Coefficient | MW | False | 0 | False | Coefficient of load drawn by the facility | |
Lower Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of lower reserve provision | |
Net Profit Coefficient | $ | False | 0 | False | Coefficient of net profit | |
Net Revenue Coefficient | $ | False | 0 | False | Coefficient of net revenue | |
Pool Revenue Coefficient | $ | False | 0 | False | Coefficient of pool revenue | |
Raise Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of raise reserve provision | |
Regulation Lower Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of regulation lower reserve provision | |
Regulation Raise Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of regulation raise reserve provision | |
Replacement Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of replacement reserve provision | |
Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of total reserve provision (from all types) | |
Start & Shutdown Cost Coefficient | $ | False | 0 | False | Coefficient of start and shutdown cost | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built constraint | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year constraint | |
Units Operating Coefficient | - | False | 0 | False | Coefficient on the number of units operating | |
Units Shutdown Coefficient | - | False | 0 | False | Coefficient on the number of units shutdown | |
Units Started Coefficient | - | False | 0 | False | Coefficient on the number of unit start |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Acceptable Risk Coefficient | - | False | 0 | False | Coefficient of entity acceptable risk | |
Build Cost Coefficient | $ | False | 0 | False | Coefficient of total build cost | |
Built Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any generation capacity is built to date | |
Built in Year Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any generation capacity is built in the year | |
Capacity Built Coefficient | MW | False | 0 | False | Coefficient of capacity built | |
Fixed Costs Coefficient | $ | False | 0 | False | Coefficient of fixed costs | |
Inertia Provision Coefficient | MW·s | False | 0 | False | Coefficient of inertia provision | |
Installed Capacity Coefficient | MW | False | 0 | False | Coefficient of installed capacity | |
Load Coefficient | MW | False | 0 | False | Coefficient of load drawn by the facility | |
Lower Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of lower reserve provision | |
Net Profit Coefficient | $ | False | 0 | False | Coefficient of net profit | |
Net Revenue Coefficient | $ | False | 0 | False | Coefficient of net revenue | |
Pool Revenue Coefficient | $ | False | 0 | False | Coefficient of pool revenue | |
Raise Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of raise reserve provision | |
Regulation Lower Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of regulation lower reserve provision | |
Regulation Raise Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of regulation raise reserve provision | |
Replacement Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of replacement reserve provision | |
Reserve Provision Coefficient | MW | False | 0 | False | Coefficient of total reserve provision (from all types) | |
Start & Shutdown Cost Coefficient | $ | False | 0 | False | Coefficient of start and shutdown cost | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year | |
Units Operating Coefficient | - | False | 0 | False | Coefficient on the number of units operating | |
Units Shutdown Coefficient | - | False | 0 | False | Coefficient on the number of units shutdown | |
Units Started Coefficient | - | False | 0 | False | Coefficient on the number of unit start |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Annualized Build Cost - $000 | Annualized Build Cost - $000 | Expansion | LT Plan | False | Annualized cost of units built |
Bid Cleared - MW | Bid Cleared - GWh | Production | LT Plan, MT Schedule, ST Schedule | True | Quantity cleared in band |
Build Cost - $000 | Build Cost - $000 | Expansion | LT Plan | False | Cost of building a unit |
Capacity Built - MW | Capacity Built - MW | Expansion | LT Plan | False | Capacity built (Max Load x Units Built) |
Capacity Factor - % | Capacity Factor - % | Production | LT Plan, MT Schedule, ST Schedule | False | Proportion of maximum load being used |
Cleared Bid Cost - $ | Cleared Bid Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Area cleared under the Power2X bid curve |
Cleared Bid Price - $/MWh | Cleared Bid Price - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | False | Price of marginal bid band |
Cost to Load - $ | Cost to Load - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of electric load |
Efficiency - % | Efficiency - % | Production | LT Plan, MT Schedule, ST Schedule | False | Efficiency of energy conversion process |
FO&M Cost - $ | FO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Fixed operation and maintenance cost |
Forced Outage - MW | Forced Outage - GWh | Reliability | LT Plan, MT Schedule, ST Schedule | False | Capacity lost to forced outage |
Forced Outage Hours - h | Forced Outage Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours on forced outage |
Forced Outage Rate - % | Forced Outage Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity on forced outage |
Hours Down - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours since the last shutdown | |
Hours Up - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours since the last start | |
Inertia - MW·s | Inertia - GW·s | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of inertia |
Installed Capacity - MW | Installed Capacity - MW | Capacity | LT Plan, PASA, MT Schedule, ST Schedule | False | Installed capacity (Max Load x Units) |
Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Expansion | LT Plan | False | Levelized cost of the commodity produced |
Load - MW | Load - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Load drawn by the facility |
Lower Reserve - MW | Lower Reserve - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of lower (spin down) reserve |
Maintenance - MW | Maintenance - GWh | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Capacity out on maintenance |
Maintenance Hours - h | Maintenance Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours on maintenance |
Maintenance Rate - % | Maintenance Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity on maintenance outage |
Max Load - MW | Max Load - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum load of each unit |
Max Production Violation | Max Production Violation | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Production] or [Max Capacity Factor] constraints |
Max Production Violation Cost - $ | Max Production Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Production] or [Max Capacity Factor] constraint violations |
Max Ramp Down - MW/min | Max Ramp Down - MW/min | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum ramp down rate that applies at the given load point |
Max Ramp Up - MW/min | Max Ramp Up - MW/min | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum ramp up rate that applies at the given load point |
Max Starts Violation | Max Starts Violation | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Starts] constraints. |
Max Starts Violation Cost - $ | Max Starts Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Starts] constraint violations. |
Min Production Violation | Min Production Violation | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Min Production] or [Min Capacity Factor] constraints |
Min Production Violation Cost - $ | Min Production Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Min Production] or [Min Capacity Factor] constraint violations |
Minutes of Ramp Down - min | Minutes of Ramp Down - min | Production | LT Plan, MT Schedule, ST Schedule | False | Total minutes spent ramping down |
Minutes of Ramp Up - min | Minutes of Ramp Up - min | Production | LT Plan, MT Schedule, ST Schedule | False | Total minutes spent ramping up |
Net Revenue - $ | Net Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Net revenue |
Price Paid - $/MWh | Price Paid - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | False | Price paid by the electric load |
Production Cost - $ | Production Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total cost of production |
Production Rate - GJ (Metric), MMBtu (U.S. Imperial) | Production Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Rate of production/volume of production |
Raise Reserve - MW | Raise Reserve - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of raise (spin up) reserve |
Ramp - MW/min | Production | LT Plan, MT Schedule, ST Schedule | False | Rate at which units are ramping | |
Ramp Down - MW | Ramp Down - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Total ramping down |
Ramp Down Cost - $ | Ramp Down Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of ramp down charged at [Ramp Down Charge] |
Ramp Down Price - $/MW | Ramp Down Price - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of the maximum ramping down constraint. |
Ramp Down Violation - MW | Ramp Down Violation - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Ramp Down] constraint. |
Ramp Down Violation Cost - $ | Ramp Down Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Ramp Down] violations. |
Ramp Down Violation Hours - h | Ramp Down Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of [Max Ramp Down] violation. |
Ramp Up - MW | Ramp Up - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Total ramping up |
Ramp Up Cost - $ | Ramp Up Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of ramp up charged at [Ramp Up Charge] |
Ramp Up Price - $/MW | Ramp Up Price - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of the maximum ramping up constraint. |
Ramp Up Violation - MW | Ramp Up Violation - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Ramp Up] constraint. |
Ramp Up Violation Cost - $ | Ramp Up Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Ramp Up] violations. |
Ramp Up Violation Hours - h | Ramp Up Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of [Max Ramp Up] violation. |
Recovered Capital Cost - $ | Recovered Capital Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Capital cost recovered by operating the Power2X |
Recovery Price - $/MWh | Recovery Price - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | False | Capital cost recovery price |
Regulation Lower Reserve - MW | Regulation Lower Reserve - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of regulation lower reserve |
Regulation Raise Reserve - MW | Regulation Raise Reserve - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of regulation raise reserve |
Replacement Reserve - MW | Replacement Reserve - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Provision of replacement reserve |
Reserves Revenue - $ | Reserves Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from provision of reserves |
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of production |
Start & Shutdown Cost - $ | Start & Shutdown Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of unit starts and shutdowns |
Total Cost - $000 | Total Cost - $000 | Expansion | LT Plan | False | Total of fixed and variable costs |
Total Production Cost - $ | Total Production Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total production cost including VO&M, start and shutdown costs |
Total System Cost - $ | Total System Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total system cost including VO&M, start and shutdown costs, and ramp costs |
Units | Units | Production | LT Plan, MT Schedule, ST Schedule | False | Number of installed units |
Units Built | Units Built | Expansion | LT Plan | False | Number of units built |
Units Operating | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units operating | |
Units Out | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of units out of service due to maintenance | |
Units Shutdown | Units Shutdown | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units shutdown |
Units Started | Units Started | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units started |
VO&M Cost - $ | VO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total variable operation and maintenance cost |
Water Consumption - m³ (Metric), gal. (U.S. Imperial) | Water Consumption - m³ (Metric), gal. (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Water consumed by the Power2X facility |
x | x | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |