Units: | - |
Default Value: | 3 |
Validation Rule: | In (1,2,3,4,7) |
Description: | One LDC is created for each period of this type in horizon. |
LT Plan LDC Type controls the type of load duration curve (LDC) used in LT Plan when the Chronology setting is disabled.
It can take the following values:
The number of blocks per LDC is controlled by the Block Count option. The method of slicing the duration curves into blocks is controlled by the LDC Slicing Method setting.
When Chronology = "Fitted" this setting works with Block Count to set the number of periods modelled in each day/week/month/quarter/year.
See also: