Build_Cost Column
Units = $000

The build cost that the unit will incur each year, calculated as LCCR * Build Cost * Nameplate Capacity (in kW).  The build cost is accrued on an hourly basis and can be used in short term or long term studies.

 Output Tables

 Resource Output Table

 Build_Cost Column