The base variable cost in thousands of dollars for the resource during the given time period. This value, derived from the Variable O&M input, along with the Variable_OM_Cost_Aux1 and Variable_OM_Cost_Aux2 columns sum to the total Variable_OM_Cost.
Variable_OM_Cost_Base Column