These switches control the level of detail reported on the status of the simulation while it is running. There are five levels of debugging messages:
General
This level serves as a good default. It provides information on simulation parameters (e.g., numbers of zones, resources, fuels, etc.) relevant to the current study.
Level 1
This level produces information on routine entry. Run time information is also provided from the very beginning of a run until all runs are complete. Note that if Run Multiple Projects is selected from CDS Toolbar, each one of the project runs (which may have multiple Change Set runs within it) is timed individually.
Level 2
This level is not currently implemented.
Level 3
This level provides information on memory levels at significant points in the memory allocation process. For RMR runs it informs which hours in the current commitment window the operating rules are in effect. The order of output in the Status Window indicates the order that each rule will be processed.
Level 4
This level is not currently implemented.
Turn on debugging messages