Units: | - |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 1 |
Validation Rule: | In (1,2) |
Key Property: | No |
Description: | Method used to value or constrain end-of-period inventory |
Commodity End Effects Method
controls the treatment of the Closing
Inventory of each simulation step. The switch can take these
values:
- Automatic (value = 0)
- The simulator chooses the "Free" option for inventory that define
targets on the end inventory, e.g. Target
Year, otherwise it chooses the "Recycle" option.
- Free (value = 1)
- Closing Inventory is
has no additional constraints or values are applied.
- Recycle (value = 2)
- The Closing Inventory is
set
equal to the Opening
Inventory. This option adds a constraint to the simulation.
The penalty for violating this constraint is by default -1
(indicating a 'hard' constraint). This can be changed with the
setting Recycle Penalty.
Note that when
LT Plan and/or
MT
Schedule are run before
ST
Schedule End Effects Method = "Recycle" applies only to the first
simulation phase unless
Decomposition
Method is set to "None". For example
MT
Schedule would recycle inventory over each year and pass targets
to
ST Schedule that follow this
recycling profile.