Units: | h |
Default Value: | 24 |
Validation Rule: | Any Value |
Description: | Number of hours over which a start cost should be recovered using mark-up on production |
Competition Start Cost Mark-up Window is a parameter of the Start Cost Mark-up feature. It is the number of hours over which a generator's start cost can be recovered. The window should be no longer than the simulation step size as controlled by the Horizon settings.
See also: