Units: | ~ |
Mode: | Output Only |
Multi-band: | False |
Default Value: | |
Validation Rule: | |
Key Property: | No |
Description: | Rate at which units are ramping |
Facility Ramp is the change in output in the period and is defined as:
Rampt = Productiont - Production(t - 1)
where:
t indexes periods of the
simulation.
The t=0 value of Production refers to the
previous simulation step and for step one it is set with the Initial
Production property.
Limits on ramping are defined with the Max Ramp Up and Max Ramp Down properties.