Gas Contract Index

Gas Contract Attributes

NameUnitsDefault ValueValidation RuleDescription
Energy Density-0Energy per unit of the gas
Unit-0Unit the gas is measured in

Gas Contract Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Annual Expansion Quantity Day1000·~ (Metric), ~ (U.S. Imperial)True1E+30≥0FalseLT Annual Max daily gas offtake associated with the contract
Build Cost$000False0≥0FalseCost of Gas Contract expansion
Contract Eligibility Date-False36526≥0FalseStart date of Gas Contract expansion planning.
Contract LengthyrFalse1E+30≥0FalseTechnical Life of Gas Contract
Contract Type-False0In (0,1,2)FalseType of gas contract
Dispatch Price$/~True0FalseDispatch Price of Gas Contract
Economic LifeyrFalse30≥0FalseEconomic life of the gas contract (period over which fixed costs are recovered).
Expansion ContractYes/NoFalse0In (0,1)FalseIndicates if Gas Contract is eligible for expansion planning
Expansion Optimality-False0In (0,2)FalseExpansion planning integerization scheme.
Expansion Quantity Day1000·~ (Metric), ~ (U.S. Imperial)True1E+30≥0FalseLT Max daily gas offtake associated with the contract
Heat Value-False0≥0FalseHeat value of gas produced by the Gas Contract
Integerization HorizonyrFalse-1≥-1FalseNumber of years over which the expansion decisions are integerized
Is AvailableYes/NoFalse1In (0,1)FalseIndicates if Gas Contract is available for production
Max Build Events-False1E+30≥0FalseMaximum number of distinct build events allowed over the planning horizon
Max Renomination-False0FalseMaximum number of renominations allowed per renomination window for Base Gas Contracts
Max Temperature°C (Metric), °F (U.S. Imperial)False1E+30FalseMaximum temperature at which the gas contract is allowed to produce
Min Days Between Renomination-False1FalseMinimum number of days between renominations of Base Gas Contracts
Min Quantity1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in interval
Min Quantity Day1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in day
Min Quantity Hour1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in hour
Min Quantity Month1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in month
Min Quantity Week1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in week
Min Quantity Year1000·~ (Metric), ~ (U.S. Imperial)False0TrueMinimum total gas contract quantity in year
Min Temperature°C (Metric), °F (U.S. Imperial)False-1E+30FalseMinimum temperature at which the gas contract is allowed to produce
Model Capital Cost RecoveryYes/NoFalse0In (0,1)FalseIndicates if capital cost recovery feature is modeled for expansion planning
Percentage of Demand%False0Between 0 And 100FalsePercentage that maximum daily take value (supply) will be adjusted according to
Price$/~True0FalsePrice of gas contract
Price Collar Max$/~False1E+30FalseMaximum price allowed for the gas contract
Price Collar Min$/~False0FalseMinimum price allowed for the gas contract
Price SettingYes/NoFalse0In (0,-1)FalseFlag if the gas contract can set price at the Gas Node
Quantity1000·~ (Metric), ~ (U.S. Imperial)False0TrueGas contract quantity
Quantity Day1000·~ (Metric), ~ (U.S. Imperial)False0TrueTotal gas contract quantity in day
Quantity Hour1000·~ (Metric), ~ (U.S. Imperial)False0TrueTotal gas contract quantity in hour
Quantity Month1000·~ (Metric), ~ (U.S. Imperial)False0TrueTotal gas contract quantity in month
Quantity Week1000·~ (Metric), ~ (U.S. Imperial)False0TrueTotal gas contract quantity in week
Quantity Year1000·~ (Metric), ~ (U.S. Imperial)False0TrueTotal gas contract quantity in year
Renomination Start Period-False0In (0,1)FalseUser defined renomination windows for Base Gas Contracts
Reservation Charge$/~/monthTrue0≥0FalseReservation charge for gas contract
Reservation Volume1000·~ (Metric), ~ (U.S. Imperial)True0≥0FalseReservation volume for gas contract
Retirement ContractYes/NoFalse0In (0,1)FalseIndicates if Gas Contract is eligible for retirement planning
Take-or-Pay Swing Price$/~False0FalsePrice to charge for the excess take of a Take or Pay contract after the obligation is met
WACC%False10≥0FalseWeighted average cost of capital
x-True0FalsePass-through value (summed in summary)
y-True0FalsePass-through value (summed in summary)
z-True0FalsePass-through value (summed in summary)

Gas Contract Gas Nodes Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Max Blend Percent%False0≥0FalseMaximum percentage of the gas produced by the Gas Contract in the blend
Min Blend Percent%False0≥0FalseMinimum percentage of the gas produced by the Gas Contract in the blend
Price Adder$/~True0FalsePrice adder to gas nodes in contract

Gas Contract Companies Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Averaging Start Period-False0In (0,1)FalseIndicates if the period is a start period for Demand Share
Demand Share%False100Between 0 And 100FalseSupply provided to the company based on the company gas demand
Direct Supply1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseSupply provided to the company

Gas Contract Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Production Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas contract production
Units Built Coefficient-False0FalseCoefficient of units built in Custom Constraint
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year
Units Retired Coefficient-False0FalseCoefficient of number of units retired
Units Retired in Year Coefficient-False0FalseCoefficient of the number of units retired in the year

Gas Contract Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Production Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas contract production
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Retired Coefficient-False0FalseCoefficient of number of units retired

Gas Contract Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of building an expansion gas contract
Build Events Build EventsExpansionLT PlanFalseNumber of build events
Commodity Cost - $Commodity Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal of node commodity costs for Gas Contract
Cost - $Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of gas used under contract
Differential Cost - $Differential Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal of basis differential costs for Gas Contract
Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseDispatch Price of Gas Contract
Max Daily Take - GJ (Metric), MMBtu (U.S. Imperial)Max Daily Take - GJ (Metric), MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseMax daily gas offtake associated with the contract
Min Daily Take - GJ (Metric), MMBtu (U.S. Imperial)Min Daily Take - GJ (Metric), MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseMin daily gas offtake associated with the contract
Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalsePrice of gas contract
Quantity Day Built - TJ (Metric), BBtu (U.S. Imperial)Quantity Day Built - TJ (Metric), BBtu (U.S. Imperial)ExpansionLT PlanFalseExpansion quantity daily gas offtake associated with the contract
Quantity Day Retired - TJ (Metric), BBtu (U.S. Imperial)Quantity Day Retired - TJ (Metric), BBtu (U.S. Imperial)ExpansionLT PlanFalseAmount of reduction in quantity daily gas offtake associated with the contract
Recovered Capital Cost - $Recovered Capital Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovered by the gas contract production
Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovery price of gas contract expansion
Reservation Cost - $Reservation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseReservation cost for gas contract
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price associated with gas scarcity
Supply Excess - GJ (Metric), MMBtu (U.S. Imperial)Supply Excess - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseGas supply excess
Take Quantity - GJ (Metric), MMBtu (U.S. Imperial)Take Quantity - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseGas offtake associated with the contract
Take-or-Pay Excess - GJ (Metric), MMBtu (U.S. Imperial)Take-or-Pay Excess - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseExcess take of take-or-pay constraint
Take-or-Pay Violation - GJ (Metric), MMBtu (U.S. Imperial)Take-or-Pay Violation - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of take-or-pay constraint
Take-or-Pay Violation Cost - $Take-or-Pay Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of take-or-pay constraint violation
Total Cost - $Total Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal of fixed and variable costs
x xPass-throughLT Plan, MT Schedule, ST ScheduleTruePass-through value (summed in summary)
y yPass-throughLT Plan, MT Schedule, ST ScheduleTruePass-through value (summed in summary)
z zPass-throughLT Plan, MT Schedule, ST ScheduleTruePass-through value (summed in summary)

Gas Contract.Gas Nodes Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Commodity Cost - $Commodity Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCommodity costs for the Gas contract-Gas Node.
Cost - $Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseSum of commodity cost and basis differential cost under contract-gas node
Differential Cost - $Differential Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseBasis differential costs for the Gas contract-Gas Node.
Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseGas contract-gas node price
Take Quantity - GJ (Metric), MMBtu (U.S. Imperial)Take Quantity - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseGas offtake associated with the contract at a specific node

Gas Contract.Companies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Gas Supply - GJ (Metric), MMBtu (U.S. Imperial)Gas Supply - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal supply provided by the company