Reserve Index

Reserve Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Cost Allocation Model-False0In (0,1,2,3)FalseReserve cost allocation method.
Cut-off SizeMWFalse0FalseThe size below which a generator will not be considered for a share in reserve costs
DurationsFalse0≥0FalseTime over which the required response must be maintained
Dynamic RiskYes/NoFalse-1In (0,-1)FalseIf elements in the Generator Contingencies and Line Contingencies collections are considered for dynamic risk calculations
Energy Usage%False0Between 0 And 100FalsePercentage of reserve dispatched in energy market
Energy Usage For ReplacementYes/NoFalse0In (0,-1)FalseIf Reserve energy usage is used for replacement reserve.
Include in LT PlanYes/NoFalse-1In (0,-1)FalseIf the reserve is modelled in the LT Plan phase.
Include in MT ScheduleYes/NoFalse-1In (0,-1)FalseIf the reserve is modelled in the MT Schedule phase.
Include in ST ScheduleYes/NoFalse-1In (0,-1)FalseIf the reserve is modelled in the ST Schedule phase.
Is EnabledYes/NoFalse-1In (0,-1)TrueFlag if the reserve is enabled
Max ProvisionMWFalse1E+30≥0FalseMaximum provision allowed for reserve class
Min ProvisionMWFalse0≥0FalseMinimum required reserve
Mutually Exclusive-False0In (0,1,2)FalseIf generation capacity providing this reserve is mutually exclusive to other reserves
Price$/MWFalse0FalsePrice
Price Cap$/MWhFalse1E+30FalseCap on Reserve Price for settlement
Price Floor$/MWhFalse-1E+30FalseFloor on Reserve Price for settlement
Risk Adjustment Factor-False1FalseProportion of contingency size (MW reserve/MW contingency)
Sharing EnabledYes/NoFalse0In (0,-1)FalseIf sharing of reserve across the transmission network is enabled.
Sharing Losses EnabledYes/NoFalse0In (0,-1)FalseIf sharing of reserve accounts for transmission losses.
Static RiskMWFalse0FalseAdditional static risk over and above dynamic risk
TimeframesFalse1E+30≥0FalseTimeframe in which the reserve is required
Type-False1In (1,2,3,4,5,6,7,8)FalseReserve type
Unit CommitmentYes/NoFalse0In (0,-1)FalseIf the set of Generators providing the Reserve is optimized or always includes all members of the Reserve Generators collection.
VoRS$/MWFalse-1FalseValue of reserve shortage (-1 sets hard constraint)
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Reserve Generators Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Effectiveness-False1≥0FalseEstimated reserve effectiveness (MW/MW)
Initial Pump Load Raise ProvisionMWFalse0≥0FalsePump load raise reserve provision at time zero
Initial Raise ProvisionMWFalse0≥0FalseGenerator raise reserve provision at time zero
Max Pump ResponseMWFalse1E+30≥0FalseMaximum dispatchable pump load reserve response
Max Pump Response Factor%False100≥0FalseMaximum dispatchable pump load reserve response as a proportion of pump load
Max ReplacementMWFalse1E+30≥0FalseMaximum replacement (non-spinning) reserve capability
Max Replacement Factor%False100≥0FalseMaximum replacement (non-spinning) reserve capability as a proportion of generation capacity
Max ResponseMWFalse1E+30≥0FalseMaximum spinning reserve response
Max Response Factor%False100≥0FalseMaximum spinning reserve response as a proportion of generation capacity
Max Sync Cond ResponseMWFalse1E+30≥0FalseMaximum synchronous condenser reserve response
Max Sync Cond Response Factor%False100≥0FalseMaximum synchronous condenser reserve response as a proportion of generation capacity
Min ProvisionMWFalse0≥0FalseMinimum reserve provision when generator is available
Min Regulation ProvisionMWFalse0≥0FalseMinimum regulation reserve provision when units are in the regulation range
Min Replacement ProvisionMWFalse0≥0FalseMinimum replacement reserve provision when units are off-line
Min Spinning ProvisionMWFalse0≥0FalseMinimum spinning reserve provision when units are generating
Offer Price$/MWTrue10000FalseReserve offer price in offer band
Offer QuantityMWTrue0≥0FalseReserve offer quantity in offer band
Pump Offer Price$/MWFalse0FalseDispatchable pump load reserve offer price
Replacement Offer Price$/MWTrue10000FalseReplacement reserve offer price in offer band
Replacement Offer QuantityMWTrue0≥0FalseReplacement reserve offer quantity in offer band
Response Ratio-False1≥0FalseRatio that converts energy ramping to units comparable to reserve ramping units
Sync Cond Offer Price$/MWFalse0FalseSynchronous condenser reserve offer price

Reserve Purchasers Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Offer Price$/MWTrue10000FalseInterruptible load offer quantity
Offer QuantityMWTrue0FalseInterruptible load offer price

Reserve Nested Reserves Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
CascadingYes/NoFalse0In (0,-1)FalseIf the relationship between the reserves is cascading or not

Reserve Batteries Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Charge Offer Price$/MWFalse0FalseCharging reserve offer price
Effectiveness-False1≥0FalseEstimated reserve effectiveness (MW/MW)
Max Charge ResponseMWFalse1E+30≥0FalseMaximum dispatchable charging load reserve response
Max Charge Response Factor%False100≥0FalseMaximum dispatchable charging load reserve response as a proportion of charge load
Max ReplacementMWFalse1E+30≥0FalseMaximum replacement (non-spinning) reserve capability
Max Replacement Factor%False100≥0FalseMaximum replacement (non-spinning) reserve capability as a proportion of generation capacity
Max ResponseMWFalse1E+30≥0FalseMaximum reserve response
Max Response Factor%False100≥0FalseMaximum reserve response as a proportion of generation capacity
Min ProvisionMWFalse0≥0FalseMinimum reserve provision when generator is available
Min Regulation ProvisionMWFalse0≥0FalseMinimum regulation reserve provision when units are in the regulation range
Min Replacement ProvisionMWFalse0≥0FalseMinimum replacement reserve provision when units are off-line
Min Spinning ProvisionMWFalse0≥0FalseMinimum spinning reserve provision when units are generating
Offer Price$/MWTrue10000FalseReserve offer price in offer band
Offer QuantityMWTrue0≥0FalseReserve offer quantity in offer band
Response Ratio-False1≥0FalseRatio that converts energy ramping to units comparable to reserve ramping units

Reserve Power2X Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Max ResponseMWFalse1E+30≥0FalseMaximum reserve response

Reserve Regions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Load Risk%False0FalsePercentage of region's load at risk
LOLP Target%False0Between 0 And 100FalseLoss of Load Probability target for this region

Reserve Line Contingencies Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Flow Back Coefficient-False0FalseMultiplier on line flow in the counter reference direction in setting the contingency size (Risk ≥ Coefficient * Flow Back)
Flow Forward Coefficient-False0FalseMultiplier on line flow in the reference direction in setting the contingency size (Risk ≥ Coefficient * Flow Forward)

Reserve Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Provision CoefficientMWFalse0FalseCoefficient of reserve provision
Risk CoefficientMWFalse0FalseCoefficient of reserve requirement
Shortage CoefficientMWFalse0FalseCoefficient of reserve shortage

Reserve Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Provision CoefficientMWFalse0FalseCoefficient of reserve provision
Risk CoefficientMWFalse0FalseCoefficient of reserve requirement
Shortage CoefficientMWFalse0FalseCoefficient of reserve shortage

Reserve Conditions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Provision CoefficientMWFalse0FalseCoefficient of reserve provision
Risk CoefficientMWFalse0FalseCoefficient of reserve requirement
Shortage CoefficientMWFalse0FalseCoefficient of reserve shortage

Reserve Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Response - MWAvailable Response - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseTotal available reserve response
Cleared Offer Cost - $Cleared Offer Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of cleared offer bands.
Cleared Offer Price - $/MWhCleared Offer Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalsePrice of marginal offer band
Cost - $Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseReserve cost paid to reserve providers
Price - $/MWPrice - $/MWProductionLT Plan, MT Schedule, ST ScheduleFalsePrice
Provision - MWProvision - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseReserve provision
Risk - MWRisk - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseRisk
Shortage - MWShortage - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseReserve shortfall
Shortage Cost - $Shortage Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of Reserve Shortage.
Shortage Hours - hShortage Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of shortage.
Time-weighted Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Time-weighted Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseTime weighted average price of reserve.
x xPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution

Reserve.Generators Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Response - MWAvailable Response - GWh-LT Plan, MT Schedule, ST ScheduleFalseAvailable reserve response
Cleared Offer Cost - $Cleared Offer Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of cleared offer bands.
Cleared Offer Price - $/MWhCleared Offer Price - $/MWh-LT Plan, MT Schedule, ST ScheduleFalsePrice of marginal offer band
Non-spinning Reserve Provision - MWNon-spinning Reserve Provision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision by off-line units
Provision - MWProvision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision
Pump Dispatchable Load Provision - MWPump Dispatchable Load Provision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision by pump dispatchable load
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve revenue
Spinning Reserve Provision - MWSpinning Reserve Provision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision by spinning reserve
Sync Cond Reserve Provision - MWSync Cond Reserve Provision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision by units in synchronous condenser mode

Reserve.Generator Contingencies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Risk - MWRisk - GWh-LT Plan, MT Schedule, ST ScheduleFalseContribution of Generator contingency to Risk.
Shadow Price - $/MWShadow Price - $/MW-LT Plan, MT Schedule, ST ScheduleFalseShadow price of Generator contingency constraint.

Reserve.Generator Cost Allocation Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Cost - $Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve cost allocated

Reserve.Purchasers Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Response - MWAvailable Response - GWh-LT Plan, MT Schedule, ST ScheduleFalseAvailable reserve response
Cleared Offer Cost - $Cleared Offer Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of cleared offer bands.
Cleared Offer Price - $/MWhCleared Offer Price - $/MWh-LT Plan, MT Schedule, ST ScheduleFalsePrice of marginal offer band
Cost - $Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve cost
Provision - MWProvision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve revenue

Reserve.Batteries Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Response - MWAvailable Response - GWh-LT Plan, MT Schedule, ST ScheduleFalseAvailable reserve response
Cleared Offer Cost - $Cleared Offer Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of cleared offer bands.
Cleared Offer Price - $/MWhCleared Offer Price - $/MWh-LT Plan, MT Schedule, ST ScheduleFalsePrice of marginal offer band
Provision - MWProvision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve revenue

Reserve.Battery Contingencies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Risk - MWRisk - GWh-LT Plan, MT Schedule, ST ScheduleFalseContribution of Battery contingency to Risk.
Shadow Price - $/MWShadow Price - $/MW-LT Plan, MT Schedule, ST ScheduleFalseShadow price of Battery contingency constraint.

Reserve.Power2X Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Response - MWAvailable Response - GWh-LT Plan, MT Schedule, ST ScheduleFalseAvailable reserve response
Provision - MWProvision - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve provision
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseReserve revenue

Reserve.Regions Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Risk - MWRisk - GWh-LT Plan, MT Schedule, ST ScheduleFalseContribution of Region [Load] to the Risk.

Reserve.Line Contingencies Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Risk - MWRisk - GWh-LT Plan, MT Schedule, ST ScheduleFalseContribution of Line contingency to Risk.
Shadow Price - $/MWShadow Price - $/MW-LT Plan, MT Schedule, ST ScheduleFalseShadow price of Line contingency constraint.

Reserve.Markets Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Cost - $Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseCost of reserve purchases from the market
Net Cost - $Net Cost - $000-LT Plan, MT Schedule, ST ScheduleFalseNet cost of reserve purchases from the market
Net Purchases - MWNet Purchases - GWh-LT Plan, MT Schedule, ST ScheduleFalseNet reserve purchases from the market
Net Revenue - $Net Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseNet revenue from reserve sales in the market
Net Sales - MWNet Sales - GWh-LT Plan, MT Schedule, ST ScheduleFalseNet reserve sold into the market
Purchases - MWPurchases - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve bought from the market
Revenue - $Revenue - $000-LT Plan, MT Schedule, ST ScheduleFalseRevenue from reserve sales in the market
Sales - MWSales - GWh-LT Plan, MT Schedule, ST ScheduleFalseReserve sold into the market