Facility Forced Outage
Units: | - |
Mode: | Input/Output |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Capacity lost to forced outage |
Detail: |
- Input
-
Facility Forced Outage is the production capacity lost to random outages. It can be used as an input to define a known pattern of outages and can be defined with a Variable object or passed as an input from an Interleaved simulation to coordinate outage between models.
- Output
-
The definition of Forced Outage as an output varies by simulation phase:
- LT Plan
- Forced Outage reports the derating applied to capacity to
account for Forced
Outage Rate:
Forced Outage = ∑ ( b ) ( Forced Outage Rateb × (Max Operating Level - Outage Ratingb)
where:
b indexes the bands of Forced Outage Rate - MT Schedule and ST Schedule
-
Forced Outage reports the capacity on outage from the realized outage events. Thus for any given event:
Forced Outage =∑ ( b ) (Max Operating Level - Outage Ratingb) × Units Outb
Note that if MT Schedule Chronology = "Partial" then multiple discrete events may combine together in any given period as a function of the slicing of the duration curves and thus this profile may then resemble a sculpted derating rather than discrete events.