Facility Ramp Down

Units: -
Mode: Output Only
Multi-band: False
Default Value:
Validation Rule:
Key Property: No
Description: Total ramping down
Detail:

Facility Ramp Down is the total ramping down in the period, and is defined as:

Ramp Down = MAX (0, Production(t-1) - Productiont )

where:
t indexes periods of the simulation.
The t=0 value of Production refers to the previous simulation step and for step one it is set with the Initial Production property.

This is distinct from Ramp which reports the ramping rate per minute.

Ramp Down can be used in combination with Minutes of Ramp Down to determine the intensity of ramping down over any period.

See also: