Gas Pipeline Expansion Optimality
Units: | - |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | In (0,2) |
Key Property: | No |
Description: | Expansion planning integerization scheme. |
Detail: |
Gas Pipeline Expansion Optimality controls the integerization of build/retire decisions in LT Plan. If discrete build points are specified using the multi-band option for Expansion Max Flow Day, Expansion Optimality should be set to Linear. It can take the following values:
- Linear (value = 0)
- Build/retire decisions are allowed to be linear (faster but can result in partial build/retire outcomes).
- Integer (value = 2)
- Build/retire decisions are strictly integer (only 0 or 1 units will be built).
NOTE: The option Optimality controls the linear/integer decision at the global level. You can also choose to integerize only part of the horizon using the switch Integerization Horizon.