NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Bid Price$/MWhTrue-10000FalseEnergy bid price
Bid QuantityMWTrue0≥0FalseQuantity bid in band
Build Cost$/kWTrue0FalseCost of building a unit
Build Non-anticipativity$/MWFalse-1FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Economic LifeyrFalse30≥0FalseEconomic life of the unit (period over which fixed costs are recovered).
Efficiency%True100FalseEfficiency of energy conversion process
Expansion Optimality-False2In (0,2)FalseExpansion planning integerization scheme
FO&M Charge$/kW/yrFalse0FalseAnnual fixed operation and maintenance charge
Forced OutageMWFalse0≥0FalseCapacity lost to forced outage
Forced Outage Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to forced outage
Formulate Non-convex-False1In (0,1,2)FalseControls when integers are used to enforce clearing of marginal efficiency tranches in order
Heat Value-False0≥0FalseHeat value of gas produced by the Power2X object
Inertia ConstantsFalse0≥0FalseStored energy per unit of power
Load PointMWTrue0≥0FalseLoad point for use with multi-point efficiency
Maintenance Frequency-True0≥0FalseFrequency of maintenance outages in an annual time frame
Maintenance Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to maintenance
Max Capacity Factor%False100Between 0 And 100FalseMaximum capacity factor (production constraint)
Max Capacity Factor Day%False100Between 0 And 100FalseMaximum capacity factor in day
Max Capacity Factor Hour%False100Between 0 And 100FalseMaximum capacity factor in hour
Max Capacity Factor Month%False100Between 0 And 100FalseMaximum capacity factor in month
Max Capacity Factor Week%False100Between 0 And 100FalseMaximum capacity factor in week
Max Capacity Factor Year%False100Between 0 And 100FalseMaximum capacity factor in year
Max Efficiency Tranches-False0Between 1 And 100FalseMaximum number of tranches in the efficiency piecewise linear approximation
Max LoadMWFalse0FalseMaximum load of each unit
Max ProductionGJ (Metric), MMBtu (U.S. Imperial)False1E+30≥0FalseMaximum production
Max Production DayTJ (Metric), BBtu (U.S. Imperial)False1E+30≥0FalseMaximum production in day
Max Production HourGJ (Metric), MMBtu (U.S. Imperial)False1E+30≥0FalseMaximum production in hour
Max Production MonthTJ (Metric), BBtu (U.S. Imperial)False1E+30≥0FalseMaximum production in month
Max Production Penalty$/GWhFalse-1FalsePenalty applied to violations of [Max Production] and [Max Capacity Factor] constraints.
Max Production WeekTJ (Metric), BBtu (U.S. Imperial)False1E+30≥0FalseMaximum production in week
Max Production YearTJ (Metric), BBtu (U.S. Imperial)False1E+30≥0FalseMaximum production in year
Max Ramp DownMW/minTrue1E+30≥0FalseMaximum ramp down rate that applies at the given load point
Max Ramp Down Penalty$/MWTrue-1FalsePenalty for violating [Max Ramp Down] constraint.
Max Ramp UpMW/minTrue1E+30≥0FalseMaximum ramp up rate that applies at the given load point
Max Ramp Up Penalty$/MWTrue-1FalsePenalty for violating [Max Ramp Up] constraint.
Max Starts-False1E+30≥0FalseMaximum number of starts allowed
Max Starts Day-False1E+30≥0FalseMaximum number of starts allowed in a day
Max Starts Hour-False1E+30≥0FalseMaximum number of starts allowed in a hour
Max Starts Month-False1E+30≥0FalseMaximum number of starts allowed in a month
Max Starts Penalty$False-1FalsePenalty applied to violations of [Max Starts] constraints.
Max Starts Week-False1E+30≥0FalseMaximum number of starts allowed in a week
Max Starts Year-False1E+30≥0FalseMaximum number of starts allowed in a year
Max Time To RepairhTrue0≥0FalseMaximum time to repair
Max Units Built-False0≥0FalseMaximum number of units automatically constructed in aggregate over the planning horizon
Max Units Built in Year-False1E+30≥0FalseMaximum number of units automatically constructed in any single year of the planning horizon
Mean Time to RepairhTrue24≥0FalseMean time to repair
Min Capacity Factor%False0Between 0 And 100FalseMinimum capacity factor
Min Capacity Factor Day%False0Between 0 And 100FalseMinimum capacity factor in day
Min Capacity Factor Hour%False0Between 0 And 100FalseMinimum capacity factor in hour
Min Capacity Factor Month%False0Between 0 And 100FalseMinimum capacity factor in month
Min Capacity Factor Week%False0Between 0 And 100FalseMinimum capacity factor in week
Min Capacity Factor Year%False0Between 0 And 100FalseMinimum capacity factor in year
Min Down TimehFalse0≥0FalseMinimum number of hours a unit must be off after being shut down
Min ProductionGJ (Metric), MMBtu (U.S. Imperial)False0≥0FalseMinimum production
Min Production DayTJ (Metric), BBtu (U.S. Imperial)False0≥0FalseMinimum production in day
Min Production HourGJ (Metric), MMBtu (U.S. Imperial)False0≥0FalseMinimum production in hour
Min Production MonthTJ (Metric), BBtu (U.S. Imperial)False0≥0FalseMinimum production in month
Min Production Penalty$/GWhFalse10000000FalsePenalty applied to violations of [Min Production] and [Min Capacity Factor] constraints.
Min Production WeekTJ (Metric), BBtu (U.S. Imperial)False0≥0FalseMinimum production in week
Min Production YearTJ (Metric), BBtu (U.S. Imperial)False0≥0FalseMinimum production in year
Min Stable Factor%False0≥0FalseMinimum stable operation level as a proportion of [Max Load]
Min Time To RepairhTrue0≥0FalseMinimum time to repair
Min Units Built-False0≥0FalseMinimum number of units automatically constructed in aggregate over the planning horizon
Min Units Built in Year-False0≥0FalseMinimum number of units automatically constructed in any single year of the planning horizon
Min Up TimehFalse0≥0FalseMinimum number of hours a unit must be run after being started
Outage Factor%True100Between 0 And 100FalseUnit outage rating based on the unit capacity
Outage RatingMWTrue0FalseUnit rating during outage
Project Start Date-False36526≥0FalseStart date of generation project, for expansion planning.
Ramp Down Charge$/MWTrue0FalseCharge applied to ramping down
Ramp Down PointMWTrue1E+30≥0FalseLoad point for use with multi-band Max Ramp Down constraints
Ramp Up Charge$/MWTrue0FalseCharge applied to ramping up
Ramp Up PointMWTrue1E+30≥0FalseLoad point for use with multi-band Max Ramp Up constraints
Repair Time Scale-True0FalseRepair time function scale parameter (for exponential, Weibull, lognormal, SEV, LEV)
Repair Time Shape-True0FalseRepair time function shape parameter (for Weibull, lognormal)
Retire Non-anticipativity$/MWFalse-1FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Shutdown Cost$False0≥0FalseCost of shutting down a unit
Start Cost$True0≥0FalseCost of starting a unit
Technical LifeyrFalse1E+30≥0FalseTechnical lifetime of the unit
Units-False0≥0TrueNumber of installed units
Units Out-True0≥0FalseNumber of units out of service due to maintenance
VO&M Charge$/MWhFalse0FalseVariable operation and maintenance charge
WACC%False10≥0FalseWeighted average cost of capital
Water Consumptionm³/MWh (Metric), gal./MWh (U.S. Imperial)False0FalseWater consumed by the Power2X facility
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Power2X Fuels Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-False1Between 0 And 1FalseProportion of this fuel produced

Power2X Nodes Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Load Participation Factor-False1Between -1 And 1FalseProportion of facility load at the node

Power2X Heat Nodes Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-False1Between 0 And 1FalseProportion of this facility's output that gets injected to this Heat Node

Power2X Heat Storages Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-False1Between 0 And 1FalseProportion of this facility's output that gets injected to this Heat Storage

Power2X Gas Nodes Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Max Blend Percent%False0≥0FalseMaximum percentage of the gas produced by Power2X in the blend
Min Blend Percent%False0≥0FalseMinimum percentage of the gas produced by Power2X in the blend
Ratio-False1Between 0 And 1FalseProportion of this facility's output that gets injected to this Gas Node

Power2X Gas Storages Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-False1Between 0 And 1FalseProportion of this facility's output that gets injected to this Gas Storage

Power2X Water Nodes Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-False1Between 0 And 1FalseProportion of this facility's water consumption that gets drawn from this Water Node

Power2X Commodities Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Ratio-True1FalseAmount of the Commodity produced per unit of input energy to the facility

Power2X Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Build Cost Coefficient$False0FalseCoefficient of total build cost
Built Coefficient-False0FalseCoefficient on binary variable indicating if any generation capacity is built to date
Built in Year Coefficient-False0FalseCoefficient on binary variable indicating if any generation capacity is built in the year
Capacity Built CoefficientMWFalse0FalseCoefficient of capacity built
Fixed Costs Coefficient$False0FalseCoefficient of fixed costs
Inertia Provision CoefficientMW·sFalse0FalseCoefficient of inertia provision
Installed Capacity CoefficientMWFalse0FalseCoefficient of installed capacity
Load CoefficientMWFalse0FalseCoefficient of load drawn by the facility
Lower Reserve Provision CoefficientMWFalse0FalseCoefficient of lower reserve provision
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Pool Revenue Coefficient$False0FalseCoefficient of pool revenue
Raise Reserve Provision CoefficientMWFalse0FalseCoefficient of raise reserve provision
Regulation Lower Reserve Provision CoefficientMWFalse0FalseCoefficient of regulation lower reserve provision
Regulation Raise Reserve Provision CoefficientMWFalse0FalseCoefficient of regulation raise reserve provision
Replacement Reserve Provision CoefficientMWFalse0FalseCoefficient of replacement reserve provision
Reserve Provision CoefficientMWFalse0FalseCoefficient of total reserve provision (from all types)
Start & Shutdown Cost Coefficient$False0FalseCoefficient of start and shutdown cost
Units Built Coefficient-False0FalseCoefficient of number of units built constraint
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year constraint
Units Operating Coefficient-False0FalseCoefficient on the number of units operating
Units Shutdown Coefficient-False0FalseCoefficient on the number of units shutdown
Units Started Coefficient-False0FalseCoefficient on the number of unit start

Power2X Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Build Cost Coefficient$False0FalseCoefficient of total build cost
Built Coefficient-False0FalseCoefficient on binary variable indicating if any generation capacity is built to date
Built in Year Coefficient-False0FalseCoefficient on binary variable indicating if any generation capacity is built in the year
Capacity Built CoefficientMWFalse0FalseCoefficient of capacity built
Fixed Costs Coefficient$False0FalseCoefficient of fixed costs
Inertia Provision CoefficientMW·sFalse0FalseCoefficient of inertia provision
Installed Capacity CoefficientMWFalse0FalseCoefficient of installed capacity
Load CoefficientMWFalse0FalseCoefficient of load drawn by the facility
Lower Reserve Provision CoefficientMWFalse0FalseCoefficient of lower reserve provision
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Pool Revenue Coefficient$False0FalseCoefficient of pool revenue
Raise Reserve Provision CoefficientMWFalse0FalseCoefficient of raise reserve provision
Regulation Lower Reserve Provision CoefficientMWFalse0FalseCoefficient of regulation lower reserve provision
Regulation Raise Reserve Provision CoefficientMWFalse0FalseCoefficient of regulation raise reserve provision
Replacement Reserve Provision CoefficientMWFalse0FalseCoefficient of replacement reserve provision
Reserve Provision CoefficientMWFalse0FalseCoefficient of total reserve provision (from all types)
Start & Shutdown Cost Coefficient$False0FalseCoefficient of start and shutdown cost
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year
Units Operating Coefficient-False0FalseCoefficient on the number of units operating
Units Shutdown Coefficient-False0FalseCoefficient on the number of units shutdown
Units Started Coefficient-False0FalseCoefficient on the number of unit start

Power2X Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Annualized Build Cost - $000Annualized Build Cost - $000ExpansionLT PlanFalseAnnualized cost of units built
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of building a unit
Capacity Built - MWCapacity Built - MWExpansionLT PlanFalseCapacity built (Max Load x Units Built)
Capacity Factor - %Capacity Factor - %ProductionLT Plan, MT Schedule, ST ScheduleFalseProportion of maximum load being used
Cost to Load - $Cost to Load - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of electric load
Efficiency - %Efficiency - %ProductionLT Plan, MT Schedule, ST ScheduleFalseEfficiency of energy conversion process
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance cost
Forced Outage - MWForced Outage - GWhReliabilityLT Plan, MT Schedule, ST ScheduleFalseCapacity lost to forced outage
Forced Outage Hours - hForced Outage Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours on forced outage
Forced Outage Rate - %Forced Outage Rate - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of installed capacity on forced outage
Hours Down - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours since the last shutdown
Hours Up - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours since the last start
Inertia - MW·sInertia - GW·sProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of inertia
Installed Capacity - MWInstalled Capacity - MWCapacityLT Plan, PASA, MT Schedule, ST ScheduleFalseInstalled capacity (Max Load x Units)
Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial)Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial)ExpansionLT PlanFalseLevelized cost of electricity
Load - MWLoad - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseLoad drawn by the facility
Lower Reserve - MWLower Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of lower (spin down) reserve
Maintenance - MWMaintenance - GWhReliabilityLT Plan, PASA, MT Schedule, ST ScheduleFalseCapacity out on maintenance
Maintenance Hours - hMaintenance Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours on maintenance
Maintenance Rate - %Maintenance Rate - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of installed capacity on maintenance outage
Max Load - MWMax Load - MWProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum load of each unit
Max Production Violation Max Production ViolationProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Production] or [Max Capacity Factor] constraints
Max Production Violation Cost - $Max Production Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Production] or [Max Capacity Factor] constraint violations
Max Ramp Down - MW/minMax Ramp Down - MW/minProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum ramp down rate that applies at the given load point
Max Ramp Up - MW/minMax Ramp Up - MW/minProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum ramp up rate that applies at the given load point
Max Starts Violation Max Starts ViolationProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Starts] constraints.
Max Starts Violation Cost - $Max Starts Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Starts] constraint violations.
Min Production Violation Min Production ViolationProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Min Production] or [Min Capacity Factor] constraints
Min Production Violation Cost - $Min Production Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Min Production] or [Min Capacity Factor] constraint violations
Minutes of Ramp Down - minMinutes of Ramp Down - minProductionLT Plan, MT Schedule, ST ScheduleFalseTotal minutes spent ramping down
Minutes of Ramp Up - minMinutes of Ramp Up - minProductionLT Plan, MT Schedule, ST ScheduleFalseTotal minutes spent ramping up
Net Revenue - $Net Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet revenue
Price Paid - $/MWhPrice Paid - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalsePrice paid by the electric load
Production Cost - $Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal cost of production
Production Rate - GJ (Metric), MMBtu (U.S. Imperial)Production Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseRate of production/volume of production
Raise Reserve - MWRaise Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of raise (spin up) reserve
Ramp - MW/minProductionLT Plan, MT Schedule, ST ScheduleFalseRate at which units are ramping
Ramp Down - MWRamp Down - MWProductionLT Plan, MT Schedule, ST ScheduleFalseTotal ramping down
Ramp Down Cost - $Ramp Down Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of ramp down charged at [Ramp Down Charge]
Ramp Down Price - $/MWRamp Down Price - $/MWProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of the maximum ramping down constraint.
Ramp Down Violation - MWRamp Down Violation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Ramp Down] constraint.
Ramp Down Violation Cost - $Ramp Down Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Ramp Down] violations.
Ramp Down Violation Hours - hRamp Down Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of [Max Ramp Down] violation.
Ramp Up - MWRamp Up - MWProductionLT Plan, MT Schedule, ST ScheduleFalseTotal ramping up
Ramp Up Cost - $Ramp Up Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of ramp up charged at [Ramp Up Charge]
Ramp Up Price - $/MWRamp Up Price - $/MWProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of the maximum ramping up constraint.
Ramp Up Violation - MWRamp Up Violation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Ramp Up] constraint.
Ramp Up Violation Cost - $Ramp Up Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Ramp Up] violations.
Ramp Up Violation Hours - hRamp Up Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of [Max Ramp Up] violation.
Regulation Lower Reserve - MWRegulation Lower Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of regulation lower reserve
Regulation Raise Reserve - MWRegulation Raise Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of regulation raise reserve
Replacement Reserve - MWReplacement Reserve - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseProvision of replacement reserve
Reserves Revenue - $Reserves Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue from provision of reserves
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of production
Start & Shutdown Cost - $Start & Shutdown Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of unit starts and shutdowns
Total Cost - $000Total Cost - $000ExpansionLT PlanFalseTotal of fixed and variable costs
Total Production Cost - $Total Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal production cost including VO&M, start and shutdown costs
Total System Cost - $Total System Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal system cost including VO&M, start and shutdown costs, and ramp costs
Units UnitsProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of installed units
Units Built Units BuiltExpansionLT PlanFalseNumber of units built
Units Operating ProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units operating
Units Out ReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of units out of service due to maintenance
Units Shutdown Units ShutdownProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units shutdown
Units Started Units StartedProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units started
VO&M Cost - $VO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal variable operation and maintenance cost
Water Consumption - m³ (Metric), gal. (U.S. Imperial)Water Consumption - m³ (Metric), gal. (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseWater consumed by the Power2X facility
x xPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution