PLEXOS 6.208 Release Notes

  1. Upgrade Compatibility
  2. Changes
  3. Features
  4. User Interface
  5. New Inputs
  6. New Outputs
Released
November 20, 2012
Previous Version
6.207
Next Version
6.300

1. Upgrade Compatibility

This version will automatically upgrade any previous Version 5 or Version 6 database. You may need to check the upgrade notes of earlier releases for any compatibility issues.

Once converted to 6.208 format, databases in this version may require some manual work to be retro-graded to earlier versions. The following items will require manual retro-grading:

  • LT Plan Chronology was previously Chronological (Yes/No)
  • MT Schedule Chronology was previously Chronological (Yes/No)

2. Changes

A new algorithm is available for selecting the chronology of long and mid-term simulations:

  • LT Plan Chronological (Yes/No) switch is replaced with Chronology
  • MT Schedule Chronological (Yes/No) is replaced with Chronology
The new Chronology switch provides three options as described in the help articles. The new option is "Sampled" chronology.

The following improvements have been made related to simulation execution:

  • The code that writes solution data to disk during and at the completion of the simulation has been substantially revised to provide better performance especially for customers running multiple large simulations simultaneously.
  • Handling of temporary files used during a simulation has been improved to reduce the number of files left on disk when a run is interrupted by the user.

The properties for ramp constraints on Line and Interface classes are now split into "up" and "down" directions. See:

  • Line Max Ramp Up
  • Line Max Ramp Down

and

  • Interface Max Ramp Up
  • Interface Max Ramp Down

3. Features

The following are new features implemented in this release:

  • The Abatement class is introduced. This class is used to model emission abatement technologies such as FGD, ESP and PAC in detail
  • As mentioned above, LT Plan and MT Schedule provide a new chronology option "Sampled" which allows your simulations to run a full chronology but for only a reduced number of days/weeks/months with the results expanded out to the full horizon automatically. This is particularly relevant for capturing the value of flexibility in the generation system when performing long-term capacity expansion planning.
  • Generator Build Cost now supports a multi-band input scheme that allows you to enter the cost of a project on a 'cash-out' basis i.e. as a stream of payments leading up to the commissioning date.
  • Generator build set size forces expansion in sets of a certain number of units e.g. 10,20 etc.
  • Several new Diagnostic switches are available. For example, Objective Function prints a file with all non-zero objective function terms. This is especially useful for LT Plan when you need to reconcile all costs.
  • Finer control is now possible over when integers are used to model non-convex heat functions and hydro efficiency functions with the Generator Formulate Non-convex switch.
  • It is now possible to enforce a Max Up Time, which is useful for modelling demand-side participation where the option can be exercised only for a limited number of hours at a time e.g certain industrial loads such as refrigeration.
  • The full set of reliability statistics such as Region LOLP can now be computed in LT Plan rather than needing to run PASA.
  • The fuel contract class now includes a FO&M Charge property.
  • The Market class adds fixed costs to sell/buy blocks with the Buy Block Fixed Charge and Sell Block Fixed Charge properties.
  • Constraints can now be defined on the maximum of the left-hand side terms (rather than the sum) e.g. on the maximum annual generation of one or more generators. See the Constraint LHS Type for details.
  • The Constraint class adds the coefficients Generators Constraint Generators.Available Capacity Coefficient, Purchasers Reserve Provision Coefficient, Regions Constraint Regions.Generators Built Coefficient, Zones Constraint Zones.Generators Built Coefficient as well as coefficients on Abatement.
  • A new option is available for transmission modelling. The Transmission Network Reduction algorithm can automatically reduce the transmission network to an equivalent faster but mathematically equivalent representation. This is useful for speeding up simulations on large-scale networks.
  • The new property Reserve Duration adds further functionality to the ancillary services co-optimization by modelling the implied energy reservation on storage as a result of reserve provision.

4. User Interface

The following changes have been implemented in the user interface:

  • You can no open the input file associated with a solution file via the "Open Input" command on the ribbon.
  • File comparison differences can now be exported to Excel.
  • The user interface now fully inter-operates with the latest version of PLEXOS Connect.

5. New Inputs

The following table lists all the new input properties available in this release. Please refer to the help for detailed information.

Collection Property Relates To
LT Plan Chronology Replaces Chronological switch (see above)
LT Plan Sample Type "Sampled" chronology option
LT Plan Reduced Sample ...
LT Plan Reduction Relative Accuracy ...
LT Plan Compute Reliability Indices Turns on calculation of Region LOLP and other reliability statistics
MT Schedule Chronology Replaces Chronological switch (see above)
MT Schedule Sample Type "Sampled" chronology option
MT Schedule Reduced Sample Counts ...
MT Schedule Reduction Relative Accuracy ...
MT Schedule Outage Increment Effective Load Approach
Competition Demand Scaling If Nash-Cournot result scales input loads to reflect price elasticity of demand.
Diagnostic Step From Limiting the production of diagnostics
Step To Step To ...
Diagnostic Max Infeasibility Log Lines Diagnostic Infeasibility
Diagnostic Objective Function Objective function terms (see above)
Generator Formulate Non-convex Controls use of integers in heat rate/efficiency modelling
Generator Max Up Time Modelling demand-side options (see above)
Generator Build Set Size Expansion must occur in sets of this many units where zero indicates any set size.
Reserve Duration Time over which the required response must be maintained
Fuel Contract FO&M Charge Annual fixed charge for the fuel contract
Abatement Units Flag if emission abatement technology is installed
Abatement Abatement Cost Cost per unit of emission removed
Abatement Running Cost Fixed cost of running emission abatement when generators are on-line.
Abatement VO&M Charge Cost per unit of generation
Abatement Units Out Flag if emission abatement technology is out-of-service
Abatement x Value to pass-through to solution
Abatement y Value to pass-through to solution
Abatement z Value to pass-through to solution
Abatement z Value to pass-through to solution
Abatement Generators Generation Participation Factor Proportion of generator emissions that feed into the abatement technology
Abatement Emissions Abatement Cost Cost per unit of emission removed for this emission
Abatement Emissions Efficiency Efficiency of emission abatement at national zero generation
Abatement Emissions Max Abatement Maximum emission abatement rate for this emission
Abatement Fuels Efficiency Scalar Relative efficiency of emission abatement for generation on the fuel
Abatement Consumables Consumptions Base Consumption at notional zero generation level
Market Sell Block Fixed Charge Fixed cost of block sales
Market Buy Block Fixed Charge Fixed cost of block purchases
Region Include in Marginal Unit Flag if the region is included in the Region Marginal Unit Diagnostic
Company Min Maintenance Generation capacity that must be scheduled on maintenance
Company Max Maintenance Factor Maximum generation capacity allowed to be scheduled on maintenance as a proportion of installed capacity
Company Min Maintenance Factor Generation capacity that must be scheduled on maintenance as a proportion of installed capacity
Constraint LHS Type Action applied over left-hand side coefficients
Constraint Generators Available Capacity Coefficient Coefficient of available capacity
Constraint Generators Hours Down Coefficient Coefficient of the number of hours the generating has been off
Constraint Abatements Abatement Coefficient Coefficient of emissions abated
Constraint Abatements Abatement Coefficient Coefficient of emissions abated
Constraint Abatements Hours of Operation Coefficient Coefficient of number of hours the emission abatement technology is running
Constraint Purchasers Reserve Provision Coefficient Coefficient of interruptible load provision
Constraint Regions Generators Built Coefficient Coefficient on binary variable indicating if any generation capacity was built
Constraint Zones Generators Built Coefficient Coefficient on binary variable indicating if any generation capacity was built

6. New Outputs

The following new output properties are added:

Collection Property Note
Generator Abatement Cost Cost of emission abatement
Generator Companies Abatement Cost Cost of emission abatement
Fuel Contract Take-or-Pay Violation Violation of take-or-pay constraint
Fuel Contract Take-or-Pay Violation Cost Cost of take-or-pay constraint violation
Fuel Contract FO&M Cost Total fixed operations and maintenance costs
Fuel Contract Total Cost Total of fixed and variable costs
Emission Gross Production Emissions prior to removal or abatement
Emission Removal Emissions removed
Emission Removal Cost Cost of emission removal
Emission Abatement Emissions abated
Emission Abatement Cost Cost of emission abatement
Emission Fuels Gross Production Emissions prior to removal or abatement
Emission Fuels Removal Emissions removed
Emission Fuels Removal Cost Cost of emission removal
Emission Fuels Abatement Emissions abated
Emission Fuels Abatement Cost Cost of emission abatement
Abatement Units Flag if emission abatement technology is installed
Abatement Hours of Operation Number of hours of operation
Abatement Gross Emissions Emission input to the abatement technology
Abatement Abatement Emissions abated
Abatement Net Emissions Emissions net of abatement
Abatement Efficiency Efficiency of emission abatement
Abatement Abatement Cost Total of semi-fixed and variable abatement costs
Abatement Running Cost Total of semi-fixed and variable abatement costs
Abatement VO&M Cost Total variable operation and maintenance cost
Abatement Total Cost Total of fixed, semi-fixed and variable costs
Abatement Abatement Value Value of emissions abated
Abatement Abatement Net Cost Net of [Total Cost] and [Abatement Value]
Abatement Units Out Flag if emission abatement technology is out-of-service
Abatement x Pass-through value (summed in summary)
Abatement y Pass-through value (Summed in summary)
Abatement z Pass-through value (averaged in summary)
Abatement Emissions Gross Emissions Emission input to the abatement technology for this emission
Abatement Emissions Abatement Emissions abated for this emission
Abatement Emissions Net Emissions Emissions net of abatement for this emission
Abatement Emissions Efficiency Efficiency of emission abatement for this emission
Abatement Emissions Abatement Value Value of emissions abated for this emission
Abatement Consumables Consumption Consumable Used
Abatement Consumables Cost Cost of consumable used
Region Abatement Cost Cost of emission abatement
Region Net Market Profit Net profit from all market nodes
Region Annualized Build Cost Annualized cost of generating units built
Region Total Cost Total of fixed and variable generation costs
Region Levelized Cost Levelized cost of electricity
Region Emissions Gross Production Emissions prior to removal or abatement
Region Emissions Removal Remissions removed
Region Emissions Removal Cost Cost of emission removal
Region Emissions Abatement Emissions abated
Region Emissions Abatement Cost Cost or emissions abatement
Zone Abatement Cost Cost of emission
Zone Generator Net Revenue Generator net revenue (producer surplus)
Zone Generator Net Profit Net profit from generators in zone
Zone Net Market Profit Net profit from all market nodes
Zone Annualized Build Cost Annualized cost of generating units built
Zone Total Cost Total of fixed and variable generation costs
Zone Levelized Cost Levelized cost of electricity
Zone Emissions Production Net production of the emission
Zone Emissions Gross Production Emissions prior to removal or abatement
Zone Emissions Removal Emissions removed
Zone Emissions Removal Cost Cost of emission removal
Zone Emissions Abatement Emissions abated
Zone Emissions Abatement Cost Cost of emission removal
Zone Emissions Generation Generation associated with the emission
Zone Emissions Intensity Emission intensity of generation
Zone Emissions Cost Emission cost
Company Abatement Cost Cost of emission abatement
Company Annualized Build Cost Annualized cost of generating units built
Company Total Cost Total of fixed and variable generation costs
Company Levelized Cost Levelized cost of electricity
Company Emissions Gross Production Emissions prior to removal or abatement
Company Emissions Removal Emissions removed
Company Emissions Removal Cost Cost of emission removal
Company Emissions Abatement Emissions abated
Company Emissions Abatement Cost Cost or emissions abatement