Hidden Parameters for PLEXOS 6.208

For setup and usage information, please refer to the Hidden Parameters technical reference.

Hidden parameters PLEXOS 6.208
Class ParameterName Type Default Validation Description
LTPlan UnitCommitmentOptimality Integer -1 In (-1,0,1,2) Overrides Production Unit Commitment Optimality
LTPlan AverageSamples Boolean false true/false Controls averaging of loads when LT Plan Chronology = "Sampled"
MTSchedule UnitCommitmentOptimality Integer -1 In (-1,0,1,2) Overrides Production Unit Commitment Optimality
MTSchedule AverageSamples Boolean false true/false Controls averaging of loads when MT Schedule Chronology = "Sampled"
STSchedule UnitCommitmentOptimality Integer -1 In (-1,0,1,2) Overrides Production Unit Commitment Optimality
STSchedule BreakStepLinks Boolean false true/false Allows links such as unit commitment that are passed between ST Schedule steps to be broken, making each step independent.
Production FormulateAllGeneratorRamp Boolean false true/false When set to true, forces generator ramp constraints to be included even if the ramp rate is large enough that it would normally never bind.
Production RunUpDowninLTPlan Boolean true true/false Flag if run up/down or start/shutdown profile is allowed in LT Plan.
Production RunUpDowninMTSchedule Boolean true true/false Flag if run up/down or start/shutdown profile is allowed in MT Schedule.
Production RunUpDowninSTSchedule Boolean true true/false Flag if run up/down or start/shutdown profile is allowed in ST Schedule.
Stochastic SampleWeightingMethod Integer 0 Value = 0 ("Uniform"), Value = 1 ("Custom"). Custom uses sample weights defined by the SampleWeight argument.
Stochastic SampleWeight Double[] null Overrides Global Sample Weight
Stochastic StepList Integer[] null In Guided Monte Carlo, this is the list of ST Schedule steps for which Monte Carlo simulation is performed. Steps not listed run only the first sample.
Competition ApplyStrategicAfterPricingStrategy Boolean false true/false Controls if Company Strategic constraints are applied before or after Competition Pricing Strategy

See 6.300