Units: | % |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Initial State of Charge |
Battery Initial SoC is the initial State of Charge of a BESS unit, at the start of the first period of the Horizon.
Example:
Storage | Property | Value | Units |
---|---|---|---|
Battery1 | Max Power | 25 | MW |
Battery1 | Capacity | 2 | MWh |
Battery1 | Max SoC | 90 | % |
Battery1 | Min SoC | 10 | % |
Battery1 | Initial SoC | 10 | % |
The example shows a typical set up for a BESS unit.
When the following conditions are satisfied, Initial SoC may be freely optimized by PLEXOS (any value from 0 to 100%):
As an extreme case, consider sampling only 1 day per year with End Effects Method set to 'Recycle'. A user-defined initial SoC essentially fixes the SoC for one interval duration in each day of the year. If initial SoC is say 0% and simulations start from midnight, the battery cannot effectively be used in a solar soak application to meet nighttime demand, as it will be empty every midnight. The one-time costs of filling low-duration batteries are contextually negligible when amortised over the entire Planning Horizon.