Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Build Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Contingency Limit Penalty | $/MWh | False | -1 | False | Penalty for exceeding contingency flow limits | |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the interface (period over which expansion costs are recovered). |
Expansion Cost | $000 | False | 0 | False | Cost of expanding the interface by one megawatt | |
Firm Capacity | MW | False | 0 | False | Contribution of the interface to region capacity reserves | |
Fixed Flow | MW | False | 0 | False | Fixed flow on interface | |
Fixed Flow Penalty | $/MWh | False | -1 | False | Penalty for violation of [Fixed Flow]. | |
Flow Non-anticipativity | $ | False | 0 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Flow Non-anticipativity Time | h | False | 0 | ≥0 | False | Window of time over which to enforce non-anticipativity constraints in scenario-wise decomposition |
Formulate Upfront | Yes/No | False | 0 | In (0,-1) | False | If constraints should all be formulated upfront rather than checked iteratively. |
Limit Penalty | $/MWh | False | -1 | False | Penalty for violation of limits | |
Max Expansion | MW | False | 0 | ≥0 | False | Maximum interface expansion |
Max Expansion In Year | MW | False | 1E+30 | ≥0 | False | Maximum interface expansion allowed in the year |
Max Flow | MW | False | 1E+30 | False | Maximum flow on interface | |
Max Ramp Down | MW/min | False | 1E+30 | ≥0 | False | Maximum ramp down rate |
Max Ramp Up | MW/min | False | 1E+30 | ≥0 | False | Maximum ramp up rate |
Min Expansion | MW | False | 0 | ≥0 | False | Minimum interface expansion |
Min Expansion In Year | MW | False | 0 | ≥0 | False | Minimum interface expansion allowed in the year |
Min Flow | MW | False | -1E+30 | False | Minimum flow on interface | |
Offer Base | MW | False | 0 | False | Base dispatch point for balancing offer | |
Offer Price | $/MWh | True | 10000 | False | Price offered in band for reference direction flows | |
Offer Price Back | $/MWh | True | 10000 | False | Price offered in band for counter-reference direction flows | |
Offer Quantity | MW | True | 0 | False | Quantity offered in band for reference direction flows | |
Offer Quantity Back | MW | True | 0 | False | Quantity offered in band for counter-reference direction flows | |
Offer Quantity Format | - | False | 0 | In (0,1) | False | Format for [Offer Quantity] and [Offer Price] |
Overload Max Rating | MW | False | 0 | False | Emergency rating in the reference direction | |
Overload Min Rating | MW | False | 0 | False | Emergency rating in the counter-reference direction | |
Ramp Penalty | $/MW | False | 0 | False | Penalty for changes in flow on the line | |
Units | - | False | 1 | In (0,1) | True | Flag if interface is in service |
WACC | % | False | 10 | ≥0 | False | Weighted average cost of capital |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Flow Back Coefficient | - | False | 0 | False | Coefficient of counter-reference direction flow in interface | |
Flow Coefficient | - | False | 1 | False | Coefficient of flow in interface | |
Flow Forward Coefficient | - | False | 0 | False | Coefficient of reference direction flow in interface |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Flow Coefficient | - | False | 1 | False | Coefficient of transformer flow in interface |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Expansion Cost Coefficient | $ | False | 0 | False | Coefficient of total build cost | |
Flow Back Coefficient | MW | False | 0 | False | Coefficient of counter-reference direction flow | |
Flow Coefficient | MW | False | 0 | False | Coefficient of flow | |
Flow Forward Coefficient | MW | False | 0 | False | Coefficient of reference direction flow |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Expansion Cost Coefficient | $ | False | 0 | False | Coefficient of total expansion cost | |
Flow Back Coefficient | MW | False | 0 | False | Coefficient of counter-reference direction flow | |
Flow Coefficient | MW | False | 0 | False | Coefficient of flow | |
Flow Forward Coefficient | MW | False | 0 | False | Coefficient of reference direction flow |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Flow Coefficient | MW | False | 0 | False | Coefficient of flow in condition |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Available Transfer Capability - MW | Available Transfer Capability - GWh | Capacity | LT Plan, MT Schedule, ST Schedule | False | Available transfer capability on the interface. |
Available Transfer Capability Back - MW | Available Transfer Capability Back - GWh | Capacity | LT Plan, MT Schedule, ST Schedule | False | Available transfer capability on the interface in the counter-reference direction. |
Capacity Built - MW | Capacity Built - MW | Expansion | LT Plan | False | Capacity built (expansion of interface in both directions) |
Capacity Reserves - MW | Capacity Reserves - MW | Capacity | LT Plan, PASA, MT Schedule, ST Schedule | False | Reserve provided by lines in the interface |
Cleared Offer Cost - $ | Cleared Offer Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Area cleared under offer curve |
Cleared Offer Price - $/MWh | Cleared Offer Price - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | False | Price of marginal offer band |
Expansion Cost - $000 | Expansion Cost - $000 | Expansion | LT Plan | False | Cost of expanding the interface by one megawatt |
Export Limit - MW | Export Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum flow allowed on the interface |
Firm Capacity - MW | Firm Capacity - MW | Capacity | LT Plan, PASA, MT Schedule, ST Schedule | False | Contribution of the interface to region capacity reserves |
Fixed Flow - MW | Fixed Flow - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Fixed flow on interface |
Fixed Flow Violation - MW | Fixed Flow Violation - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Fixed Flow] constraint. |
Fixed Flow Violation Cost - $ | Fixed Flow Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Fixed Flow] violations. |
Fixed Flow Violation Hours - h | Fixed Flow Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours that [Fixed Flow] is violated. |
Flow - MW | Flow - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Flow on the interface |
Flow Back - MW | Flow Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Flow on the interface in the counter-reference direction |
Hours Congested - h | Hours Congested - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the interface is congested in pre-contingency state |
Hours Congested Back - h | Hours Congested Back - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the interface flow is congested in the counter-reference direction |
Hours Congested Total - h | Hours Congested Total - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours interface is congested in the reference direction |
Import Limit - MW | Import Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum flow allowed on the interface |
Loading - % | Loading - % | Production | LT Plan, MT Schedule, ST Schedule | False | Loading relative to thermal limit. |
Loading Back - % | Loading Back - % | Production | LT Plan, MT Schedule, ST Schedule | False | Loading in the counter-reference direction relative to thermal limit. |
Max Flow - MW | Max Flow - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum flow on interface |
Min Flow - MW | Min Flow - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum flow on interface |
Net Flow - MW | Net Flow - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Net Flow on the interface |
Offer Base - MW | Offer Base - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Base dispatch point for balancing offer |
Offer Cleared - MW | Offer Cleared - GWh | Production | LT Plan, MT Schedule, ST Schedule | True | Quantity cleared in band |
Offer Cleared Back - MW | Offer Cleared Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | True | Quantity cleared in band |
Offer Price - $/MWh | Offer Price - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | True | Price offered in band for reference direction flows |
Offer Price Back - $/MWh | Offer Price Back - $/MWh | Production | LT Plan, MT Schedule, ST Schedule | True | Price offered in band for counter-reference direction flows |
Offer Quantity - MW | Offer Quantity - GWh | Production | LT Plan, MT Schedule, ST Schedule | True | Quantity offered in band for reference direction flows |
Offer Quantity Back - MW | Offer Quantity Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | True | Quantity offered in band for counter-reference direction flows |
Overload Export Limit - MW | Overload Export Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum post-contingency flow allowed on the interface |
Overload Import Limit - MW | Overload Import Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum post-contingency flow allowed on the interface |
Ramp - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Change in flow | |
Ramp Cost - $ | Ramp Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of ramping |
Rental - $ | Rental - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Flowgate rental in pre-contingency state |
Rental Total - $ | Rental Total - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Flowgate rental |
Shadow Price - $/MW | Shadow Price - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of interface limit in the reference direction in pre-contingency state |
Shadow Price Back - $/MW | Shadow Price Back - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of interface limit in the counter-reference direction |
Shadow Price Total - $/MW | Shadow Price Total - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow/expansion price |
Violation - MW | Violation - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of the interface limit. |
Violation Back - MW | Violation Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of the interface limit in the counter-reference direction. |
x | x | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, PASA, MT Schedule, ST Schedule | True | Value to pass-through to solution |