Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
AC Fixed Shift Angle | ° | False | 0 | False | The fixed phase shift angle between the two windings of a single-phase transformer | |
AC Line Charging Susceptance | pu | False | 0 | False | The line-charging susceptance of a transformer | |
AC Tap Ratio | - | False | 1 | >0 | False | The turns ratio of the primary winding of a transformer |
Contingency Limit Penalty | $/MWh | False | -1 | False | Penalty for exceeding contingency flow limits | |
Enforce Limits | - | False | 1 | In (0,1,2,3) | False | If flow limits are enforced regardless of Transmission [Constraint Voltage Threshold]. |
Fixed Loss | MW | False | 0 | False | Fixed loss on transformer | |
Forced Outage Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to forced outage |
Formulate NPL Upfront | Yes/No | False | 0 | In (0,-1) | False | If integer conditions that control non-physical losses should be formulated upfront rather than checked iteratively |
Formulate Upfront | Yes/No | False | 0 | In (0,-1) | False | If constraints should all be formulated upfront rather than checked iteratively. |
Limit Penalty | $/MWh | False | -1 | False | Penalty for exceeding the flow limits on the Transformer. | |
Loss Allocation | - | False | 0.5 | Between 0 And 1 | False | Proportion of transformer losses allocated to the receiving node |
Maintenance Frequency | - | True | 0 | ≥0 | False | Frequency of maintenance outages in an annual timeframe |
Maintenance Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to maintenance |
Max Loss Tranches | - | False | 2 | ≥2 | False | Maximum number of tranches in piecewise linear loss function. |
Max Time To Repair | h | True | 0 | ≥0 | False | Maximum time to repair (hr) |
Mean Time to Repair | h | True | 24 | ≥0 | False | Mean time to repair (hr) |
Min Time To Repair | h | True | 0 | ≥0 | False | Minimum time to repair (hr) |
Must Report | Yes/No | False | 0 | In (0,-1) | False | If the Transformer must be reported regardless of Transmission [Report Voltage Threshold]. |
Outage Max Rating | MW | True | 0 | False | Transformer rating in the reference direction during outage | |
Outage Min Rating | MW | True | 0 | False | Transformer rating in the counter-reference direction during outage | |
Overload Rating | MW | False | 0 | ≥0 | False | Emergency rating in the reference direction |
Random Number Seed | - | False | 0 | Between 0 And 2147483647 | False | Random number seed assigned to the Line for the generation of outages |
Rating | MW | False | 0 | ≥0 | False | Maximum MW rating |
Reactance | pu | False | 0 | False | Together with any resistance this makes up the lines impedance | |
Repair Time Distribution | - | True | -1 | In (-1,0,1,2,3,4,5,6,7) | False | Distribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV) |
Repair Time Scale | - | True | 0 | False | Repair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV) | |
Repair Time Shape | - | True | 0 | False | Repair time function shape parameter (for Weibull,lognormal) | |
Resistance | pu | False | 0 | False | A measure of the transformer's opposition to the flow of electric charge | |
Screening Mode | - | False | 1 | In (0,1,2) | False | The set of transformers that should be screened for post-contingency flow under screen contingencies |
Susceptance | pu | False | 0 | False | The reciprocal of the reactance of a circuit and thus the imaginary part of its admittance | |
Units | - | False | 1 | In (0,1) | True | Flag if transformer is in service |
Units Out | - | False | 0 | In (0,1) | False | Number of [Units] out of service |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Flow Coefficient | MW | False | 0 | False | Coefficient of transformer flow equation |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Flow Coefficient | MW | False | 0 | False | Coefficient of transformer flow equation |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Available Transfer Capability - MW | Available Transfer Capability - GWh | Capacity | LT Plan, MT Schedule, ST Schedule | False | Available transfer capability on the transformer. |
Available Transfer Capability Back - MW | Available Transfer Capability Back - GWh | Capacity | LT Plan, MT Schedule, ST Schedule | False | Available transfer capability on the transformer in the counter-reference direction. |
Discrete Maintenance - MW | Discrete Maintenance - GWh | Reliability | PASA | False | Planned reference direction capacity out of service |
Discrete Maintenance Back - MW | Discrete Maintenance Back - GWh | Reliability | PASA | False | Planned counter-reference direction capacity out of service |
Distributed Maintenance - MW | Distributed Maintenance - GWh | Reliability | PASA | False | Ideal reference direction capacity out on maintenance |
Distributed Maintenance Back - MW | Distributed Maintenance Back - GWh | Reliability | PASA | False | Ideal counter-reference direction capacity out on maintenance |
Export Cost - $ | Export Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of energy exported |
Export Limit - MW | Export Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum flow allowed on the transformer |
Export Revenue - $ | Export Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from energy exported |
Flow - MW | Flow - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Flow through the transformer (sent out) |
Flow Back - MW | Flow Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Flow through the transformer in the counter-reference direction |
Forced Outage - MW | Forced Outage - GWh | Reliability | LT Plan, MT Schedule, ST Schedule | False | Capacity forced out |
Forced Outage Rate - % | Forced Outage Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity on forced outage |
Hours Congested - h | Hours Congested - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the Transformer is flowing at its [Rating] in pre-contingency state |
Hours Congested Total - h | Hours Congested Total - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the Transformer is flowing at its [Rating] |
Import Cost - $ | Import Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of energy imported |
Import Limit - MW | Import Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum flow allowed on the line |
Import Revenue - $ | Import Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from energy imported |
Loading - % | Loading - % | Production | LT Plan, MT Schedule, ST Schedule | False | Loading relative to thermal limit. |
Loading Back - % | Loading Back - % | Production | LT Plan, MT Schedule, ST Schedule | False | Loading in the counter-reference direction relative to thermal limit. |
Loss - MW | Loss - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Losses (sent out) |
Loss Back - MW | Loss Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Losses on flows in the counter-reference direction |
Maintenance - MW | Maintenance - GWh | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Total capacity out of service in the reference direction (discrete + distributed) |
Maintenance Back - MW | Maintenance Back - GWh | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Total capacity out of service in the reverse reference direction (discrete + distributed) |
Maintenance Rate - % | Maintenance Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity on maintenance outage |
Max Flow - MW | Max Flow - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum flow |
Min Flow - MW | Min Flow - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum flow |
Non-physical Loss - MW | Non-physical Loss - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Non-physical losses in the reference direction |
Non-physical Loss Back - MW | Non-physical Loss Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Non-physical losses in the counter-reference direction |
Overload Export Limit - MW | Overload Export Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum post-contingency flow allowed on the transformer |
Overload Import Limit - MW | Overload Import Limit - MW | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum post-contingency flow allowed on the line |
Rental - $ | Rental - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Transmission rent in pre-contingency state |
Rental Back - $ | Rental Back - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Rental / settlement surplus in the counter-reference direction |
Rental Total - $ | Rental Total - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Transmission rent |
Service Factor - % | Service Factor - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity available for transfer |
Shadow Price - $/MW | Shadow Price - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow/expansion price in pre-contingency state |
Shadow Price Total - $/MW | Shadow Price Total - $/MW | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow/expansion price |
Violation - MW | Violation - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of flow limit |
Violation Back - MW | Violation Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of the flow limit in the counter-reference direction. |
Violation Back Hours - h | Violation Back Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the flow limit is violated in the counter-reference direction. |
Violation Cost - $ | Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of violating flow limits |
Violation Cost Back - $ | Violation Cost Back - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of violating the flow limit in the counter-reference direction. |
Violation Hours - h | Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the Transformer Flow exceeds the [Rating]. |
Voltage - kV | Voltage - kV | Production | LT Plan, MT Schedule, ST Schedule | False | Voltage of the transformer |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |