The Hour Resource table provides a quick view of the basic input assumptions and cost and value results for each resource in the current hour being dispatched. If the table is open during a study, memory results will be updated after every dispatch.
For units that have an upper bidding block segment, separate rows will display for the standard and UBB blocks. However, whenever this grid is opened immediately after a pause and the switch on the logic tab to Combine resource segments in reporting is set to true, the standard block will show the combined results for the entire unit in that hour. After the initial open, stepping the model with the grid open continuously will show the unit segment data and performance separately.
COLUMNS INCLUDE |
|||
Hour Resource Table
For further assistance, please contact Aurora Support.
Copyright© 1997-2022 Energy Exemplar LLC. All rights reserved.