Units: | $ |
Mode: | Input Only |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | Any Value |
Key Property: | No |
Description: | Charge applied to ramping down |
Facility Ramp Down Charge is a charge applied to ramping down. This charge can be used to approximate the maintenance/wear-and-tear cost of ramping. The charge is applied to all Ramp between the Min Operating Factor × Max Operating Level and Max Operating Level. The cost incurred is reported in the property Ramp Down Cost.
See also: