Use Date for Study Info Column
Column Type = Boolean

This optional column is used with the Study Info Override column and instructs the model to read the Study Info Override input value as a DateTime type column, as opposed to a String.

 NOTE: Problems may occur by doing Write Multiple Simulations to the Database with this as a type = Date in one run and a type = String in the other.  The Study Info Override option overrides the standard date stamp reporting and should be used judiciously.  Typically, the Run ID in the Study Cases form is recommended for implementing an output identifier.  

 Input Tables

 General Information Table

 Use Date for Study Info Column


For further assistance, please contact Aurora Support.

Copyright© 1997-2024 Energy Exemplar LLC. All rights reserved.