Enter the number of days referenced from the start of the study to which the input variable distribution is applied. For example, for a study-start date of 1/10/2004 a value of “Day of Study”=2 will define the record to apply only to 1/11/2004. The value can be used with either daily or standard time period studies. When this value is positive, any input in the Year or Month column will be ignored. Additionally, the values for this column are mutually exclusive with those for “Day of Month”. Columns Day of Study and Day of Month cannot both be positive for the same record. If two different records are input which point to the same actual day, only the one with the highest value for Order will be used.
NOTE: This column can be type text, but must be a numeric value.
NOTE: This column may be named "Day" or "Day of Study".
Day (of Study) Column
For further assistance, please contact Aurora Support.
Copyright© 1997-2024 Energy Exemplar LLC. All rights reserved.