Dump Cost Column
Column Type = Text

Dump Cost is an optional column used to specify a $/MW cost of dumping energy. When this column is populated with a positive value, Aurora will consider over-generating and dumping energy as part of the optimization. If this input is left blank, or a negative value is input, Aurora will not allow dump energy. This value can be interpreted as a cost of relaxing a MW of demand by exceeding the demand target. If you prefer that Aurora attempt to over-generate to meet other constraints, such as must-run, this column should be used. 

 NOTE: Specify inputs for any time period (annually, monthly, weekly, hourly, or sub-hourly). For information on specifying a variable's time series, see Entering a Time Series.

 

 Input Tables

 Zone Definition Table

 Inertia Relaxation Cost Column


For further assistance, please contact Aurora Support.

Copyright© 1997-2024 Energy Exemplar LLC. All rights reserved.