Gas Pipeline Index

Gas Pipeline Attributes

NameUnitsDefault ValueValidation RuleDescription
Energy Density-0Energy per unit of the gas
Unit-0Unit the gas is measured in

Gas Pipeline Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Annual Expansion Max Flow Day1000·~ (Metric), ~ (U.S. Imperial)True1E+30≥0FalseAnnual Expansion Max Flow Daily total gas release for the pipeline
Balance Period-False0In (0,1,2,3,4,5,6)FalseFrequency of storage balance
Build Cost$000False0FalseCost of building the gas pipeline
Decomposition Bound Penalty$/~False1000000≥0FalsePenalty applied to violation of storage bounds when the decomposition implies possible violations.
Decomposition Method-False0In (0,1,2)FalseMethod used to pass the optimal storage trajectory from one simulation phase to the next.
Decomposition Penalty a-False0.0489FalseDecomposition storage target penalty function 'a' term.
Decomposition Penalty b-False0.6931FalseDecomposition storage target penalty function 'b' term.
Decomposition Penalty c-False0FalseDecomposition storage target penalty function 'c' term.
Decomposition Penalty x-False1.1FalseDecomposition storage target penalty function 'x' term.
Dispatch Flow Charge$/~True0FalseDispatch cost of extracting gas at the pipeline receiving node
Dispatch Flow Charge Back$/~True0FalseDispatch cost of extracting gas at the pipeline sending node
Economic LifeyrFalse30≥0FalseEconomic life of the gas pipeline (period over which fixed costs are recovered).
End Effects Method-False1In (1,2)FalseMethod used to value or constrain end-of-period gas volumes.
Enforce BoundsYes/NoFalse-1In (0,-1)FalseIf the storage bounds are enforced.
Entitlement Type-False0In (0,1)FalseIndicates whether maximum flow entitlement is at the input node (gross) or at the output node (net).
Expansion Max Flow Day1000·~ (Metric), ~ (U.S. Imperial)True1E+30≥0FalseExpansion Max Flow Daily total gas release for the pipeline
Expansion Optimality-False0In (0,2)FalseExpansion planning integerization scheme.
Expansion Pipeline-False0In (0,1)FalseIndicates if the gas pipeline is eligible for expansion planning
Flow Charge$/~True0FalseIncremental cost of extracting gas from the pipeline
Flow Charge Back$/~True0FalseIncremental cost of extracting gas at the pipeline sending node
Flow Charge Back Level1000·~ (Metric), ~ (U.S. Imperial)True0FalseLevel corresponding to Flow Charge Back
Flow Charge Back Level Factor%True0≥0FalseLevel factor corresponding to Flow Charge Back
Flow Charge Level1000·~ (Metric), ~ (U.S. Imperial)True0FalseLevel corresponding to Flow Charge
Flow Charge Level Factor%True0≥0FalseLevel factor corresponding to Flow Charge
FO&M Charge$000False0FalseAnnual fixed operation and maintenance charge
Forced Outage Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to forced outage
Imbalance Charge$/~False0FalseThe charge applicable to the volume imbalance
Initial Pressurepa (Metric), psi (U.S. Imperial)False0≥0FalsePressure of gas stored in the pipeline at the beginning of the horizon
Initial Volume1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseVolume of gas stored in the pipeline at the beginning of the horizon
Integerization HorizonyrFalse-1≥-1FalseNumber of years over which the expansion decisions are integerized
Internal Volume Scalar-False1>0FalseStorage volume scaling factor used internal to the mathematical program.
Is AvailableYes/NoFalse1In (0,1)FalseIndicates if Gas Pipeline is available for flow.
Is Bidirectional-False0In (0,1)FalseIndicates if the pipeline allows flow in both directions
Lead TimeyrFalse0≥0FalseNumber of years after which the expansion project can begin
Loss Rate%False0≥0FalseLoss rate for gas pipeline flow
Maintenance Frequency-True0≥0FalseFrequency of maintenance outages in an annual time frame
Maintenance Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to maintenance
Max Build Events-False1E+30≥0FalseMaximum number of distinct build events allowed over the planning horizon
Max Flow1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline
Max Flow Back1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMaximum quantity of gas that can be extracted from the pipeline sending node
Max Flow Back Day1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMaximum quantity of gas that can be extracted at the pipeline sending node each day
Max Flow Back Hour1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMaximum quantity of gas that can be extracted at the pipeline sending node each hour
Max Flow Back Month1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMaximum quantity of gas that can be extracted at the pipeline sending node each month
Max Flow Back Penalty$/~False-1≥-1FalsePenalty for violating the [Max Flow Back] constraints.
Max Flow Back Week1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMaximum quantity of gas that can be extracted at the pipeline sending node each week
Max Flow Back Year1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each year
Max Flow Day1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline each day
Max Flow Hour1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline each hour
Max Flow Month1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline each month
Max Flow Penalty$/~False-1≥-1FalsePenalty for violating the [Max Flow] constraints.
Max Flow Week1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline each week
Max Flow Year1000·~ (Metric), ~ (U.S. Imperial)False1E+30≥0FalseMaximum quantity of gas that can be extracted from the pipeline each year
Max Pressurepa (Metric), psi (U.S. Imperial)False0FalseMaximum pressure of gas stored in the pipeline
Max Time To RepairhTrue0≥0FalseMaximum time to repair
Max Volume1000·~ (Metric), ~ (U.S. Imperial)False0FalseMaximum volume of gas stored in the pipeline
Mean Time to RepairhTrue24≥0FalseMean time to repair
Min Flow1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node
Min Flow Back1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted from the pipeline sending node
Min Flow Back Day1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each day
Min Flow Back Hour1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each hour
Min Flow Back Month1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each month
Min Flow Back Penalty$/~False-1≥-1FalsePenalty for violating the [Min Flow Back] constraints.
Min Flow Back Week1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each week
Min Flow Back Year1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline sending node each year
Min Flow Day1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node each day
Min Flow Hour1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node each hour
Min Flow Month1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node each month
Min Flow Penalty$/~False-1≥-1FalsePenalty for violating the [Min Flow] constraints.
Min Flow Week1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node each week
Min Flow Year1000·~ (Metric), ~ (U.S. Imperial)False0≥0FalseMinimum quantity of gas that can be extracted at the pipeline receiving node each year
Min Pressure Percent%False0≥0FalseMinimum percentage of max pressure that must be stored in the Gas Pipeline to maintain pressure
Min Time To RepairhTrue0≥0FalseMinimum time to repair
Min Volume1000·~ (Metric), ~ (U.S. Imperial)False0FalseMinimum volume of gas stored in the pipeline
Min Volume Percent%False0≥0FalseMinimum percentage of max volume that must be stored in the Gas Pipeline to maintain pressure
Model Capital Cost RecoveryYes/NoFalse0In (0,1)FalseIndicates if capital cost recovery feature is modeled for expansion planning
Outage Max Flow1000·~ (Metric), ~ (U.S. Imperial)True0FalsePipeline Max Flow during the outage
Outage Max Flow Back1000·~ (Metric), ~ (U.S. Imperial)True0FalsePipeline Max Flow Back during the outage
Project Start Date-False36526≥0FalseStart date of gas pipeline project, for expansion planning.
Random Number Seed-False0Between 0 And 2147483647FalseRandom number seed assigned to the pipeline for the generation of outages
Recycle Penalty$/~False-1FalsePenalty for violating the recycling constraint.
Repair Time Distribution-True-1In (-1,0,1,2,3,4,5,6,7)FalseDistribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV)
Repair Time Scale-True0FalseRepair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV)
Repair Time Shape-True0FalseRepair time function shape parameter (for Weibull,lognormal)
Reservation Charge$/~/monthTrue0≥0FalseReservation charge for gas pipeline
Reservation Volume1000·~ (Metric), ~ (U.S. Imperial)True0≥0FalseReservation volume for gas pipeline
Retirement Cost$000False0FalseCost of retiring the gas pipeline
Retirement Pipeline-False0In (0,1)FalseIndicates if the gas pipeline is eligible for retirement planning
Technical LifeyrFalse1E+30≥0FalseTechnical lifetime of the gas pipeline
WACC%False10≥0FalseWeighted average cost of capital
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Gas Pipeline Maintenances Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Outage Max Flow1000·~ (Metric), ~ (U.S. Imperial)False0FalsePipeline Max Flow during the outage
Outage Max Flow Back1000·~ (Metric), ~ (U.S. Imperial)False0FalsePipeline Max Flow Back during the outage

Gas Pipeline Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
End Volume Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas in storage.
Flow Back Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow at the sending node
Flow Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow in the constraint
Flow Forward Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow at the receiving node
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year constraint
Units Retired Coefficient-False0FalseCoefficient of number of units retired
Units Retired in Year Coefficient-False0FalseCoefficient of number of units retired in the year constraint

Gas Pipeline Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
End Volume Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas in storage
Flow Back Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow at the sending node
Flow Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow
Flow Forward Coefficient1000·~ (Metric), ~ (U.S. Imperial)False0FalseCoefficient of gas pipeline flow at the receiving node
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year
Units Retired Coefficient-False0FalseCoefficient of number of units retired
Units Retired in Year Coefficient-False0FalseCoefficient of number of units retired in the year

Gas Pipeline Conditions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Flow Coefficient-False0FalseCoefficient on gas pipeline flow

Gas Pipeline Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of building the gas pipeline
Build Events Build EventsExpansionLT PlanFalseNumber of build events
End Volume - TJ (Metric), BBtu (U.S. Imperial)End Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseVolume of gas in the pipeline at the end of the period
Fixed Costs - $Fixed Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fixed costs including amortized build costs
Flow Capacity Outage - GJ (Metric), MMBtu (U.S. Imperial)Flow Capacity Outage - TJ (Metric), BBtu (U.S. Imperial)ReliabilityLT Plan, MT Schedule, ST ScheduleFalseFlow capacity on outage due to maintenance or forced outage
Flow In - GJ (Metric), MMBtu (U.S. Imperial)Flow In - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseQuantity of gas pumped into the pipeline
Flow Out - GJ (Metric), MMBtu (U.S. Imperial)Flow Out - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseQuantity of gas extracted from the pipeline
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance cost
Forced Outage - GJ (Metric), MMBtu (U.S. Imperial)Forced Outage - TJ (Metric), BBtu (U.S. Imperial)ReliabilityLT Plan, MT Schedule, ST ScheduleFalseCapacity forced out
Forced Outage Hours - hForced Outage Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the pipeline is on forced outage
Hours Congested - hHours Congested - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the pipeline is congested in the reference direction
Hours Congested Back - hHours Congested Back - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the pipeline is congested in the counter-reference direction
Imbalance Cost - $Imbalance Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of imbalances
Initial Volume - TJ (Metric), BBtu (U.S. Imperial)Initial Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseVolume of gas stored in the pipeline at the beginning of the horizon
Loss - GJ (Metric), MMBtu (U.S. Imperial)Loss - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseGas pipeline flow loss amount
Maintenance - GJ (Metric), MMBtu (U.S. Imperial)Maintenance - TJ (Metric), BBtu (U.S. Imperial)ReliabilityLT Plan, PASA, MT Schedule, ST ScheduleFalseCapacity on maintenance
Maintenance Hours - hMaintenance Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the pipeline is on maintenance
Max Daily Flow - GJ (Metric), MMBtu (U.S. Imperial)Max Daily Flow - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum daily flow limit of the pipeline
Max Daily Flow Built - GJ (Metric), MMBtu (U.S. Imperial)Max Daily Flow Built - TJ (Metric), BBtu (U.S. Imperial)ExpansionLT PlanFalseAmount of increase in Gas Pipeline Max Daily Flow
Max Daily Flow Retired - GJ (Metric), MMBtu (U.S. Imperial)Max Daily Flow Retired - TJ (Metric), BBtu (U.S. Imperial)ExpansionLT PlanFalseAmount of reduction in Gas Pipeline Max Daily Flow
Max Observed Flow - GJ (Metric), MMBtu (U.S. Imperial)Max Observed Flow - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseQuantity of max observed flow in a pipeline.
Max Volume - TJ (Metric), BBtu (U.S. Imperial)Max Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum volume of gas stored in the pipeline
Min Volume - TJ (Metric), BBtu (U.S. Imperial)Min Volume - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseMinimum volume of gas stored in the pipeline
Pressure - pa (Metric), psi (U.S. Imperial)Pressure - pa (Metric), psi (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalsePressure of gas stored in the pipeline at the start of the period
Production Cost - $Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of extracting gas from the pipeline
Recovered Capital Cost - $Recovered Capital Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovered by flowing gas through the pipeline
Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseCapital cost recovery price of gas pipeline expansion
Reservation Cost - $Reservation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseGas pipeline reservation cost
Retirement Cost - $000Retirement Cost - $000ExpansionLT PlanFalseCost of retiring the gas pipeline
Service Factor - %Service Factor - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of pipeline capacity available
Total Cost - $Total Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseGas pipeline total cost
Total Variable Costs - $Total Variable Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal Variable Costs of gas from the pipeline
Units Out ReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of units out of service
Utilization Back - %Utilization Back - %ProductionLT Plan, MT Schedule, ST ScheduleFalseFlow back capacity utilization
Utilization Forward - %Utilization Forward - %ProductionLT Plan, MT Schedule, ST ScheduleFalseFlow forward capacity utilization
Volume Imbalance - TJ (Metric), BBtu (U.S. Imperial)Volume Imbalance - TJ (Metric), BBtu (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseAbsolute value of the difference between delivery volume into the pipeline and the redelivered volume off the pipeline.
x xPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution

Gas Pipeline.Gas Node From Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Participation Factor - %Participation Factor - %ProductionLT Plan, MT Schedule, ST ScheduleTruePercentage of total Gas Node inflow from a given exporting Gas Pipeline

Gas Pipeline.Gas Node To Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Participation Factor - %Participation Factor - %ProductionLT Plan, MT Schedule, ST ScheduleTruePercentage of total Gas Node inflow from a given importing Gas Pipeline