Units: | GWh |
Mode: | Input/Output |
Multi-band: | False |
Default Value: | 0 |
Validation Rule: | ≥0 |
Key Property: | No |
Description: | Storage volume at the start of the period |
Storage Initial Volume as an input sets the volume in the storage at the start of the first period of the Horizon. The units of Initial Volume are controlled by the Storage Model.
Example:
Storage | Property | Value | Units |
---|---|---|---|
PUMP1 | Max Volume | 5 | GWh |
PUMP1 | Initial Volume | 0 | GWh |
PUMP1 TAIL | Max Volume | 5 | GWh |
PUMP1 TAIL | Initial Volume | 5 | GWh |
The example show a typical set up for a pump storage system.
When the following conditions are satisfied, initial volume may be freely optimized by PLEXOS (any value from 0 to Max Volume):
As an extreme case, consider sampling only 1 day per year with End Effects Method set to 'Recycle'. A user-defined initial volume essentially fixes the storage volume for one interval duration in each day of the year. If initial volume is 0 and simulations start from midnight, the storage cannot effectively be used in a solar soak pumped hydro application to meet nighttime demand, as it will be empty every midnight. The one-time costs of filling low-duration storages are contextually negligible when amortised over the entire Planning Horizon.
As an output, Initial Volume is the volume in storage at the start of the period.