Units: | ~ |
Mode: | Output Only |
Multi-band: | False |
Default Value: | |
Validation Rule: | |
Key Property: | No |
Description: | Total ramping up |
Facility Ramp Up is the total ramping up in the period, and is defined as:
Ramp Up = MAX (0, Productiont - Production(t-1) )
where:
t indexes periods of the
simulation.
The t=0 value of Production refers to the
previous simulation step and for step one it is set with the Initial
Production property.
This is distinct from Ramp which reports the ramping rate in minute. Ramp Up can be used in combination with Minutes of Ramp Up to determine the intensity of ramping up over any period.
See also: