Flow Control Index

Flow Control Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Angle°False0FalseAngle (initial angle when used as input)
Angle Points°True0≥0FalseFlow control angle points
Build Cost$000True0FalseCost of building the flow control
Build Non-anticipativity$/MWFalse-1FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Commission Date-False1≥0FalseDate the flow control was commissioned for use with [Technical Life]
Economic LifeyrFalse30≥0FalseEconomic life of the flow control (period over which fixed costs are recovered).
Expansion Optimality-False2In (0,2)FalseExpansion planning integerization scheme.
Flow Loading Points%True100Between 0 And 100FalseFlow control line flow points
FO&M Charge$000False0FalseAnnual fixed operation and maintenance charge
Integerization HorizonyrFalse-1≥-1FalseNumber of years over which the expansion decisions are integerized
Lead TimeyrFalse0≥0FalseNumber of years after which the expansion project can begin
Max Angle°False0FalseMax angle set on the flow control
Max ImpedancepuFalse0FalseMax Impedance
Max Units Built-False0≥0FalseMaximum number of units automatically constructed in aggregate over the planning horizon
Max Units Built in Year-False1≥0FalseMaximum number of units automatically constructed in any single year of the planning horizon
Max VoltagekVFalse0FalseMax Voltage
Min Angle°False0FalseMin angle set on the flow control
Min ImpedancepuFalse0FalseMin Impedance
Min Units Built-False0≥0FalseMinimum number of units automatically constructed in aggregate over the planning horizon
Min Units Built in Year-False0≥0FalseMinimum number of units automatically constructed in any single year of the planning horizon
Min VoltagekVFalse0FalseMin Voltage
Penalty$/° (Metric), $/degree (U.S. Imperial)False0FalsePenalty incurred for shifting the angle
Price SettingYes/NoFalse-1In (0,-1)FalseFlag if the flow control can transfer price across the network
Project Start Date-False36526≥0FalseStart date of the project, for expansion planning.
Ramp Penalty$/MWFalse0FalsePenalty price per MW change in flow on the device
Technical LifeyrFalse1E+30≥0FalseTechnical lifetime of the flow control
Type-False0In (0,1,2,3,4,5)FalseFlow control type
Units-False1≥0TrueNumber of installed units
WACC%False10≥0FalseWeighted average cost of capital
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Flow Control Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Angle Coefficient°False0FalseCoefficient of flow control angle
Negative Angle Coefficient-False0FalseBoolean value (1 if the flow control angle is negative, 0 otherwise)
Positive Angle Coefficient-False0FalseBoolean value (1 if the flow control angle is positive, 0 otherwise)
Units Built Coefficient-False0FalseCoefficient of number of units built

Flow Control Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Angle Coefficient°False0FalseCoefficient of flow control angle
Negative Angle Coefficient-False0FalseBoolean value (1 if the flow control angle is negative, 0 otherwise)
Positive Angle Coefficient-False0FalseBoolean value (1 if the flow control angle is positive, 0 otherwise)
Units Built Coefficient-False0FalseCoefficient of number of units built

Flow Control Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Angle - °Angle - °ProductionLT Plan, MT Schedule, ST ScheduleFalseAngle (initial angle when used as input)
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of building the flow control
Flow - MWFlow - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseEquivalent flow in reference direction due to phase shift
Flow Back - MWFlow Back - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseEquivalent flow against reference direction due to phase shift
Hours Binding - hHours Binding - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the flow control is operating at maximum angle.
Impedance - puImpedance - puProductionLT Plan, MT Schedule, ST ScheduleFalseEquivalent impedance
Max Angle - °Max Angle - °ProductionLT Plan, MT Schedule, ST ScheduleFalseMax angle set on the flow control
Min Angle - °Min Angle - °ProductionLT Plan, MT Schedule, ST ScheduleFalseMin angle set on the flow control
Penalty - $Penalty - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePenalty incurred for shifting the angle
Rental - $Rental - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRental
Shadow Price - $/° (Metric), $/degree (U.S. Imperial)Shadow Price - $/° (Metric), $/degree (U.S. Imperial)ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow (expansion) price
Units Built Units BuiltExpansionLT PlanFalseBinary indicating if the unit was built
x xPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution