Name | Units | Default Value | Validation Rule | Description |
---|---|---|---|---|
Energy Density | - | 0 | Energy per unit of the gas | |
Latitude | ° | 0 | Latitude | |
Longitude | ° | 0 | Longitude | |
Unit | - | 0 | Unit the gas is measured in |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Annual Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Annual Expansion max volume associated with the Gas Storage |
Balance Period | - | False | 0 | In (0,1,2,3,4,5,6) | False | Frequency of storage balance |
Build Cost | $000 | False | 0 | False | Cost of building the gas storage | |
Build Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Carrying Rate | % | False | 0 | ≥0 | False | Carrying rate for gas storage per year |
Decomposition Bound Penalty | $/~ | False | 1000000 | ≥0 | False | Penalty applied to violation of storage bounds when the decomposition implies possible violations. |
Decomposition Method | - | False | 1 | In (0,1,2) | False | Method used to pass the optimal storage trajectory from one simulation phase to the next. |
Decomposition Penalty a | - | False | 0.0489 | False | Decomposition storage target penalty function 'a' term. | |
Decomposition Penalty b | - | False | 0.6931 | False | Decomposition storage target penalty function 'b' term. | |
Decomposition Penalty c | - | False | 0 | False | Decomposition storage target penalty function 'c' term. | |
Decomposition Penalty x | - | False | 1.1 | False | Decomposition storage target penalty function 'x' term. | |
Dispatch Injection Charge | $/~ | True | 0 | False | Incremental dispatch cost of injecting gas into the storage | |
Dispatch Withdrawal Charge | $/~ | True | 0 | False | Incremental dispatch cost of withdrawing gas from the storage | |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the gas storage (period over which fixed costs are recovered). |
End Effects Method | - | False | 1 | In (1,2) | False | Method used to value or constrain end-of-period gas volumes. |
Enforce Bounds | Yes/No | False | -1 | In (0,-1) | False | If the storage bounds are enforced. |
Entitlement Type | - | False | 0 | In (0,1) | False | Indicates whether maximum injection or withdrawal entitlement does not include loss (gross) or includes loss (net). |
Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 1E+30 | ≥0 | False | Expansion max volume associated with the Gas Storage |
Expansion Optimality | - | False | 0 | In (0,2) | False | Expansion planning integerization scheme. |
Expansion Storage | Yes/No | False | 0 | In (0,1) | False | Indicates if the gas storage is eligible for expansion planning |
External Injection | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | External injection into the gas storage | |
FO&M Charge | $000 | False | 0 | False | Annual fixed operation and maintenance charge | |
Forced Outage Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to forced outage |
Initial Carbon Content | kg/~ (Metric), lb/~ (U.S. Imperial) | False | 0 | False | Initial carbon content of the gas stored in the gas storage | |
Initial Heat Value | - | False | 0 | False | Initial heat value of the gas stored in the gas storage | |
Initial Inventory Price | $/~ | False | 0 | ≥0 | False | Price linked to initial inventory |
Initial Value Inclusion | Yes/No | False | 0 | In (0,-1) | False | If initial value in the gas storage is included in optimization. |
Initial Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Initial volume of gas in the storage |
Injection Charge | $/~ | True | 0 | False | Incremental cost of injecting gas into the storage | |
Injection Energy Consumption | MWh/1000·~ | False | 0 | False | constant of proportionality for energy consumption of Gas Storage injection | |
Injection Fuel Rate | % | False | 0 | ≥0 | False | Fuel injection rate for gas storage |
Injection Ratchet | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in any interval when defining a gas storage ratchet. |
Injection Rate Scalar | % | True | 0 | False | Scalar to set the maximum amount of gas that can be injected into the storage | |
Injection Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | False | Storage volume for which injection is allowed | |
Injection Volume Factor | % | True | 0 | ≥0 | False | Fuel injection factor for gas storage |
Injection Withdrawal Charge Level | % | True | 100 | Between 0 And 100 | False | Percentage of volume that correspond to bands of Injection Withdrawal Charge or Dispatch Injection Withdrawal Charge |
Integerization Horizon | yr | False | -1 | ≥-1 | False | Number of years over which the expansion decisions are integerized |
Internal Volume Scalar | - | False | 1 | >0 | False | Storage volume scaling factor used internal to the mathematical program. |
Inventory Charge | $/~ | False | 0 | ≥0 | False | Charge per unit of inventory each day |
Is Available | Yes/No | False | 1 | In (0,1) | False | Indicates if Gas Storage is available |
Lead Time | yr | False | 0 | ≥0 | False | Number of years after which the expansion project can begin |
Loss Rate | % | False | 0 | ≥0 | False | Rate of loss due to leakage, etc |
Maintenance Frequency | - | True | 0 | ≥0 | False | Frequency of maintenance outages in an annual time frame |
Maintenance Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to maintenance |
Max Build Events | - | False | 1E+30 | ≥0 | False | Maximum number of distinct build events allowed over the planning horizon |
Max Injection | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage |
Max Injection Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in a day |
Max Injection Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in a hour |
Max Injection Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in a month |
Max Injection Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in a week |
Max Injection Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be injected into the storage in a year |
Max Ramp | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage per interval |
Max Ramp Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage in a day |
Max Ramp Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage in an hour |
Max Ramp Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage in a month |
Max Ramp Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage in a week |
Max Ramp Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum rate of change in storage in a year |
Max Storage Power Consumption | MW/1000·~ | False | 0 | False | constant of proportionality for power consumption of Gas Storage max volume | |
Max Storage Target Percent | % | False | 100 | Between 0 And 100 | False | Max Storage Target Percent for gas storage |
Max Temperature Injection | °C (Metric), °F (U.S. Imperial) | False | 1E+30 | False | Maximum temperature at which the gas storage is allowed to inject gas | |
Max Temperature Withdrawal | °C (Metric), °F (U.S. Imperial) | False | 1E+30 | False | Maximum temperature at which the gas storage is allowed to withdraw gas | |
Max Time To Repair | h | True | 0 | ≥0 | False | Maximum time to repair |
Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | False | Maximum volume of gas allowed in storage | |
Max Withdrawal | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage |
Max Withdrawal Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in day |
Max Withdrawal Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in a hour |
Max Withdrawal Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in a month |
Max Withdrawal Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in a week |
Max Withdrawal Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in a year |
Mean Time to Repair | h | True | 24 | ≥0 | False | Mean time to repair |
Min Injection | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage |
Min Injection Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage in a day |
Min Injection Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage each hour |
Min Injection Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage in a month |
Min Injection Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage in a week |
Min Injection Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be injected into the storage in a year |
Min Storage Target Percent | % | False | 0 | Between 0 And 100 | False | Minimum Storage Target Percent for gas storage |
Min Temperature Injection | °C (Metric), °F (U.S. Imperial) | False | -1E+30 | False | Minimum temperature at which the gas storage is allowed to inject gas | |
Min Temperature Withdrawal | °C (Metric), °F (U.S. Imperial) | False | -1E+30 | False | Minimum temperature at which the gas storage is allowed to withdraw gas | |
Min Time To Repair | h | True | 0 | ≥0 | False | Minimum time to repair |
Min Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Minimum volume of gas allowed in storage | |
Min Withdrawal | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage |
Min Withdrawal Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage in a day |
Min Withdrawal Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage each hour |
Min Withdrawal Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage in a month |
Min Withdrawal Percent | % | False | 0 | Between 0 And 100 | False | Minimum quantity of gas, expressed as a percentage of Gas Storage inventory, that must be withdrawn during a given interval |
Min Withdrawal Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage in a week |
Min Withdrawal Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | Amount of gas that must be withdrawn from storage in a year |
Model Capital Cost Recovery | Yes/No | False | 0 | In (0,1) | False | Indicates if capital cost recovery feature is modeled for expansion planning |
Monthly Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Monthly Expansion max volume associated with the Gas Storage |
Outage Max Injection | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | False | Storage Max Injection during the outage | |
Outage Max Withdrawal | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | False | Storage Max Withdrawal during the outage | |
Power Consumption | MW | False | 0 | False | power consumption of Gas Storage | |
Project Start Date | - | False | 36526 | ≥0 | False | Start date of gas storage project, for expansion planning. |
Random Number Seed | - | False | 0 | Between 0 And 2147483647 | False | Random number seed assigned to the Storage for the generation of outages |
Ratchet Type | - | False | 0 | In (0,1,2) | False | Indicates how the gas storage ratchets are represented |
Recycle Penalty | $/~ | False | -1 | False | Penalty for violating the recycling constraint. | |
Repair Time Distribution | - | True | -1 | In (-1,0,1,2,3,4,5,6,7) | False | Distribution used to generate repair times (Auto,Constant,Uniform,Triangular,Exponential,Weibull,Lognormal,SEV,LEV) |
Repair Time Scale | - | True | 0 | False | Repair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV) | |
Repair Time Shape | - | True | 0 | False | Repair time function shape parameter (for Weibull,lognormal) | |
Reservation Charge | $/~/month | True | 0 | ≥0 | False | Reservation charge for gas storage |
Reservation Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | ≥0 | False | Reservation volume for gas storage |
Retire Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Retirement Cost | $000 | False | 0 | False | Cost of retiring the gas storage | |
Retirement Storage | Yes/No | False | 0 | In (0,1) | False | Indicates if the gas storage is eligible for retirement planning |
Target | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | storage target |
Target Day | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | end of day storage target |
Target Hour | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | end of hour storage target |
Target Month | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | end of month storage target |
Target Penalty | $/~ | False | -1 | False | Penalty for violating the target. | |
Target Penalty Under | $/~ | False | -1 | False | Penalty for violating the Min Storage Target. | |
Target Week | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | end of week storage target |
Target Year | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | ≥0 | False | end of year storage target |
Technical Life | yr | False | 1E+30 | ≥0 | False | Technical lifetime of the gas storage |
Term Expansion Max Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | ≥0 | False | Expansion max volume associated with the term based Gas Storage |
Trajectory Non-anticipativity | $/~ | True | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Trajectory Non-anticipativity Time | h | False | 0 | ≥0 | False | Window of time over which to enforce non-anticipativity constraints in scenario-wise decomposition |
Trajectory Non-anticipativity Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 1E+30 | ≥0 | False | Volume of violation of non-anticipativity constraints in band |
Use Additive Ratchet | Yes/No | False | -1 | In (0,-1) | False | If additive ratchet use is enforced. |
Volume Power Consumption | MW/1000·~ | False | 0 | False | constant of proportionality for power consumption of Gas Storage current volume | |
WACC | % | False | 10 | ≥0 | False | Weighted average cost of capital |
Withdrawal Charge | $/~ | True | 0 | False | Incremental cost of withdrawing gas from the storage | |
Withdrawal Fuel Rate | % | False | 0 | ≥0 | False | Fuel withdrawal rate for gas storage |
Withdrawal Ratchet | 1000·~ (Metric), ~ (U.S. Imperial) | False | 1E+30 | ≥0 | False | Maximum amount of gas that can be withdrawn from the storage in any interval when defining a gas storage ratchet. |
Withdrawal Rate Scalar | % | True | 0 | False | Scalar to set the maximum amount of gas that can be withdrawn from the storage | |
Withdrawal Volume | 1000·~ (Metric), ~ (U.S. Imperial) | True | 0 | False | Storage volume for which withdrawal is allowed | |
Withdrawal Volume Factor | % | True | 0 | ≥0 | False | Fuel withdrawal factor for gas storage |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Node Type | - | False | 0 | In (0,1,2) | False | Using this input property, a Gas Node defined in the Gas Node collection of a Gas Storage can act as injection only, withdrawal only or both. |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Outage Max Injection | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Gas Storage Max Injection during the outage | |
Outage Max Withdrawal | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Gas Storage Max Withdrawal during the outage |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
End Volume Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of storage end volume. | |
Injection Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of gas storage injection in the constraint | |
Ramp Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of change in gas storage end volume in the constraint | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year constraint | |
Units Retired Coefficient | - | False | 0 | False | Coefficient of number of units retired | |
Units Retired in Year Coefficient | - | False | 0 | False | Coefficient of number of units retired in the year constraint | |
Withdrawal Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of gas storage withdrawal in the constraint |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
End Volume Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of storage end volume | |
Injection Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of gas storage injection | |
Ramp Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of change in gas storage end volume | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year | |
Units Retired Coefficient | - | False | 0 | False | Coefficient of number of units retired | |
Units Retired in Year Coefficient | - | False | 0 | False | Coefficient of number of units retired in the year | |
Withdrawal Coefficient | 1000·~ (Metric), ~ (U.S. Imperial) | False | 0 | False | Coefficient of gas storage withdrawal |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
End Volume Coefficient | GWh | False | 0 | False | Coefficient of the end volume in Gas Storage in the condition equation |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Annualized Build Cost - $000 | Annualized Build Cost - $000 | Expansion | LT Plan | False | Annualized cost of the amount built |
Average Heat Value | Average Heat Value | Production | LT Plan, MT Schedule, ST Schedule | False | Weighted average heat value of the gas blend injected into the gas storage |
Average Utilization - % | Average Utilization - % | Production | LT Plan, MT Schedule, ST Schedule | False | Average storage utilization based on end volume |
Average Working Utilization - % | Average Working Utilization - % | Production | LT Plan, MT Schedule, ST Schedule | False | Average storage utilization based on working volume |
Build Cost - $000 | Build Cost - $000 | Expansion | LT Plan | False | Cost of building the gas storage |
Build Events | Build Events | Expansion | LT Plan | False | Number of build events |
Carrying Cost - $ | Carrying Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total cost of gas carried in storage |
Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Dispatch Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Dispatch price |
End Volume - TJ (Metric), BBtu (U.S. Imperial) | End Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Storage volume at the end of the period |
Ending Carbon Quantity - tonne (Metric), ton (U.S. Imperial) | Ending Carbon Quantity - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Carbon Quantity of the gas storage at the end of period |
Ending Energy | Ending Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Value of heat energy in gas storage at the end of period |
Ending Inventory Value - $000 | Ending Inventory Value - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Value of inventory in gas storage at the end of period. |
Energy Consumption - MWh | Energy Consumption - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | total energy consumption of the Gas Storage |
Fixed Costs - $ | Fixed Costs - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total fixed costs including amortized build costs |
FO&M Cost - $ | FO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Fixed operation and maintenance cost |
Forced Outage - GJ (Metric), MMBtu (U.S. Imperial) | Forced Outage - TJ (Metric), BBtu (U.S. Imperial) | Reliability | LT Plan, MT Schedule, ST Schedule | False | Capacity of Withdrawal/Injection on Forced Outage |
Forced Outage Hours - h | Forced Outage Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours the gas storage is on forced outage of Withdrawal/Injection |
Initial Carbon Quantity - tonne (Metric), ton (U.S. Imperial) | Initial Carbon Quantity - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Carbon quantity of the gas storage at the start of period |
Initial Energy | Initial Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Value of heat energy in gas storage at the start of period |
Initial Inventory Value - $000 | Initial Inventory Value - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Value of inventory in gas storage at the start of a period. |
Initial Volume - TJ (Metric), BBtu (U.S. Imperial) | Initial Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Initial volume of gas in the storage |
Injection - GJ (Metric), MMBtu (U.S. Imperial) | Injection - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Quantity of gas injected into the gas storage |
Injection Cost - $ | Injection Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of injecting gas into the storage |
Injection Fuel - GJ (Metric), MMBtu (U.S. Imperial) | Injection Fuel - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Fuel amount lost in the gas storage injection |
Inventory Cost - $ | Inventory Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost from the Inventory Charge of holding gas in storage |
Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Levelized Cost - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Expansion | LT Plan | False | Levelized cost of gas injections and withdrawals |
Loss - GJ (Metric), MMBtu (U.S. Imperial) | Loss - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas storage flow loss amount |
Maintenance - GJ (Metric), MMBtu (U.S. Imperial) | Maintenance - TJ (Metric), BBtu (U.S. Imperial) | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Capacity of Withdrawal/Injection on maintenance |
Maintenance Hours - h | Maintenance Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours the gas storage is on maintenance |
Max Injection Available - GJ (Metric), MMBtu (U.S. Imperial) | Max Injection Available - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Quantity of gas available to inject based on the specified gas storage ratchets |
Max Volume - TJ (Metric), BBtu (U.S. Imperial) | Max Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Maximum volume of gas allowed in storage |
Max Volume Built - TJ (Metric), BBtu (U.S. Imperial) | Max Volume Built - TJ (Metric), BBtu (U.S. Imperial) | Expansion | LT Plan | False | Amount of increase in Gas Storage Max Volume |
Max Volume Retired - TJ (Metric), BBtu (U.S. Imperial) | Max Volume Retired - TJ (Metric), BBtu (U.S. Imperial) | Expansion | LT Plan | False | Amount of reduction in Gas Storage Max Volume |
Max Withdrawal Available - GJ (Metric), MMBtu (U.S. Imperial) | Max Withdrawal Available - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Quantity of gas available to withdraw based on the specified gas storage ratchets |
Min Volume - TJ (Metric), BBtu (U.S. Imperial) | Min Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Minimum volume of gas allowed in storage |
Net Injection - GJ (Metric), MMBtu (U.S. Imperial) | Net Injection - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Net injection after injection fuel loss |
Net Injection Cost - $ | Net Injection Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Net injection Cost for the gas storage |
Net Utilization - GJ (Metric), MMBtu (U.S. Imperial) | Net Utilization - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Net of withdrawal and injection |
Net Withdrawal - GJ (Metric), MMBtu (U.S. Imperial) | Net Withdrawal - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Net withdrawal after withdrawal fuel loss |
Net Withdrawal Cost - $ | Net Withdrawal Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Net withdrawal cost for the gas storage |
Production Cost - $ | Production Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total cost of injections and withdrawals |
Recovered Capital Cost - $ | Recovered Capital Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Capital cost recovered in the gas storage operation |
Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Recovery Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Capital cost recovery price of gas storage expansion |
Reservation Cost - $ | Reservation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Reservation cost for Gas Storage |
Retirement Cost - $000 | Retirement Cost - $000 | Expansion | LT Plan | False | Cost of retiring the gas storage |
Service Factor - % | Service Factor - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of Storage capacity available in withdrawal/injection |
Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Shadow Price - $/GJ (Metric), $/MMBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of gas in the storage |
Total Cost - $000 | Total Cost - $000 | Expansion | LT Plan | False | Total of fixed, withdrawal and injection costs |
Total Operation - GJ (Metric), MMBtu (U.S. Imperial) | Total Operation - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Total of net withdrawal and net injection |
Total Variable Costs - $ | Total Variable Costs - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total variable cost for the gas storage |
Units Out | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of units out of service | |
Utilization - % | Utilization - % | Production | LT Plan, MT Schedule, ST Schedule | False | Storage utilization based on end volume |
Withdraw Fuel - GJ (Metric), MMBtu (U.S. Imperial) | Withdraw Fuel - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Fuel amount lost in the gas storage withdrawal |
Withdrawal - GJ (Metric), MMBtu (U.S. Imperial) | Withdrawal - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Quantity of gas withdrawn from the storage |
Withdrawal Cost - $ | Withdrawal Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of withdrawing gas from the storage |
Working Utilization - % | Working Utilization - % | Production | LT Plan, MT Schedule, ST Schedule | False | Storage utilization based on working volume |
Working Volume - TJ (Metric), BBtu (U.S. Imperial) | Working Volume - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Working storage volume at the end of the period |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by Power2X to the gas storage |
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by Power2X to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by Power2X to the gas storage |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by gas field to the gas storage |
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas field to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas field to the gas storage |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by gas plant to the gas storage |
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas plant to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas plant to the gas storage |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by source gas storage to the gas storage |
Delivered Energy - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Energy - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by source gas storage to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by source gas storage to the gas storage |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by gas contract to the gas storage |
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by gas contract to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by gas contract to the gas storage |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Delivered Emission - kg (Metric), lb (U.S. Imperial) | Delivered Emission - tonne (Metric), ton (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Emission delivered by Gas Transport to the gas storage |
Delivered Energy | Delivered Energy | Production | LT Plan, MT Schedule, ST Schedule | False | Heat energy delivered by Gas Transport to the gas storage |
Delivered Quantity - GJ (Metric), MMBtu (U.S. Imperial) | Delivered Quantity - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas delivered by Gas Transport to the gas storage |