LT Plan Index

LT Plan Attributes

NameUnitsDefault ValueValidation RuleDescription
Allow Capacity SharingYes/No0In (0,-1)If regions/zones can share capacity reserves to meet requirements
Always Annualize Build Cost-0In (0,-1)If [Build Cost] is always annualized even when an option retires inside the horizon
At a Time-0≥0Number of years solved in each step of LT Plan
Block Count-12≥1Number of load duration curve blocks in each day/week/month.
Bridge ConstraintsYes/No-1In (0,-1)If LT Plan should bridge (decompose) constraints for subsequent simulation phases
Bridge StorageYes/No-1In (0,-1)If LT Plan should bridge (decompose) storage for subsequent simulation phases
Capacity Payments EnabledYes/No0In (0,-1)If payments are made for generation capacity
Chronology-2In (2,3,4)Type of chronology used
Co-optimize Unit CommitmentYes/No0In (0,-1)If unit commitment is co-optimized rather than sequentially optimized with expansion
Compute Multi-area Reliability IndicesYes/No0In (0,-1)Master switch for computation of reliability indices LOLP, LOLE, etc across multiple areas.
Compute Reliability IndicesYes/No0In (0,-1)Master switch for computation of reliability indices LOLP, LOLE, etc.
Decomposition-1≥1Reduce the number of simulated periods by this factor in the first pass of a two-pass decomposition
Depreciation Method-0In (0,1,2)Depreciation method for computing annuities
Discount Period Type-4In (1,2,3,4,6,7)A unique discount factor and expansion decisions will be computed for each of these periods.
Discount Rate%0≥0Discount rate.
End Effects Method-1In (0,1)Method used to account for end of horizon effects
Inflation Rate%0Inflation rate used in depreciation calculations
Integerization Horizonyr-1≥-1Number of years over which the expansion decisions are integerized
Last Block Count-0≥0Number of load duration curve blocks in the last load duration curve of the horizon, or zero if the same as [Block Count].
LDC Pin Bottom--1≥-1Number of points at the bottom of the LDC that are pinned and cannot be aggregated into blocks.
LDC Pin Top--1≥-1Number of points at the top of the LDC that are pinned and cannot be aggregated into blocks.
LDC Slicing Method-0In (0,1)Method used to slice the LDC into blocks.
LDC Type-3In (1,2,3,4,7)One LDC is created for each period of this type in horizon.
LDC Weight a-0LDC weighting polynomial function 'a' parameter.
LDC Weight b-1LDC weighting polynomial function 'b' parameter.
LDC Weight c-0LDC weighting polynomial function 'c' parameter.
LDC Weight d-0LDC weighting polynomial function 'd' parameter.
Limit Capital Cost Perpetuity by Economic Life--1In (0,-1)With perpetuity end effect, if annuity calculation should extend beyond the end of the horizon up to the Economic Life
Maintenance SculptingYes/No0In (0,-1)If LT Plan should sculpt maintenance derating according to the inverse of load.
Optimality-2In (0,1,2)LT Plan integerization scheme.
Optimize ExpansionYes/No-1In (0,-1)If expansion is optimized by this simulation phase
Outage IncrementMW10≥1Generator outage bin size in convolution
Overlap-0≥-1Number of years overlap between steps where -1 invokes Rolling Horizon
Pricing Method-0In (0,1)Type of generator pricing used in LT Plan.
Reduced Sample Count-4≥1Statistically reduce the [Sample Type] periods to at most this number of samples each year.
Reduction Relative Accuracy-1Between 0 And 1Stop sample reduction when the accuracy of the reduced sample set reaches this level.
Sample Type-2In (1,2,3,4)For Chronology = "Sampled", take this type of sample.
Sample Year Count-0≥0For [Chronology] = "Sampled", first select this many years then sample within only those years.
Sampled Block Count-0≥0Number of blocks modeled in each sample period (day/week) where zero means the original number of intervals
Sampling Interval-4In (-1,2,3,4,7)For Chronology = "Sampled", take [Sample Type] samples in each of these intervals of time.
Solution Count-1≥1Maximum number of solutions produced in the solution hierarchy
Solution Quality%0Between 0 And 100Continue producing solutions up to Solution Count or when Solution Quality falls to this level
Start Cost Amortization Periodh0≥0Number of hours over which generator start costs are amortized
Stochastic Method-0In (0,1,2,3)Stochastic optimization method for LT Plan
Storage Formulate Head EffectsYes/No-1In (0,-1)If storage head effects should be formulated in LT Plan
Storage RestartYes/No0In (0,-1)If recycled storage should restart from their initial volume at the start of each capacity optimization period
Tax Rate%0Tax rate used to compute tax credits
Use Effective Load ApproachYes/No0In (0,-1)If LT Plan uses the effective load approach
Write Expansion Plan Text FilesYes/No0In (0,-1)If expansion plans should be written to text files