Units: | - |
Default Value: | 0 |
Validation Rule: | In (0,1) |
Description: | Criterion used to select periods for Monte Carlo reliability analysis |
This PASA option relates to the MT Schedule Reliability Chronology feature. Periods are selected for Monte Carlo simulation in MT Schedule based on this setting. Specifically, the statistic is computed for each period (where the period is controlled by PASA Step Type) and the periods ranked. The top Reliability Max Samples periods are then selected for Monte Carlo simulation. The statistic used to rank periods is controlled by this option and can take one the following values:
Note that only objects selected for reporting are included in the statistic used to select periods i.e. you can limit the scope of the analysis by adding a filter to the Lists collection of the Report object associated with the running Model. For example. you might want the reliability analysis to apply only to a single Region, Zone or Node.