Interface Index

Interface Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Build Non-anticipativity$/MWFalse-1FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Contingency Limit Penalty$/MWhFalse-1FalsePenalty for exceeding contingency flow limits
Economic LifeyrFalse30≥0FalseEconomic life of the interface (period over which expansion costs are recovered).
Expansion Cost$000False0FalseCost of expanding the interface by one megawatt
Firm CapacityMWFalse0FalseContribution of the interface to region capacity reserves
Fixed FlowMWFalse0FalseFixed flow on interface
Fixed Flow Penalty$/MWhFalse-1FalsePenalty for violation of [Fixed Flow].
Flow Non-anticipativity$False0FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Flow Non-anticipativity TimehFalse0≥0FalseWindow of time over which to enforce non-anticipativity constraints in scenario-wise decomposition
Formulate UpfrontYes/NoFalse0In (0,-1)FalseIf constraints should all be formulated upfront rather than checked iteratively.
Limit Penalty$/MWhFalse-1FalsePenalty for violation of limits
Max ExpansionMWFalse0≥0FalseMaximum interface expansion
Max Expansion In YearMWFalse1E+30≥0FalseMaximum interface expansion allowed in the year
Max FlowMWFalse1E+30FalseMaximum flow on interface
Max Ramp DownMW/minFalse1E+30≥0FalseMaximum ramp down rate
Max Ramp UpMW/minFalse1E+30≥0FalseMaximum ramp up rate
Min ExpansionMWFalse0≥0FalseMinimum interface expansion
Min Expansion In YearMWFalse0≥0FalseMinimum interface expansion allowed in the year
Min FlowMWFalse-1E+30FalseMinimum flow on interface
Offer BaseMWFalse0FalseBase dispatch point for balancing offer
Offer Price$/MWhTrue10000FalsePrice offered in band for reference direction flows
Offer Price Back$/MWhTrue10000FalsePrice offered in band for counter-reference direction flows
Offer QuantityMWTrue0FalseQuantity offered in band for reference direction flows
Offer Quantity BackMWTrue0FalseQuantity offered in band for counter-reference direction flows
Offer Quantity Format-False0In (0,1)FalseFormat for [Offer Quantity] and [Offer Price]
Overload Max RatingMWFalse0FalseEmergency rating in the reference direction
Overload Min RatingMWFalse0FalseEmergency rating in the counter-reference direction
Ramp Penalty$/MWFalse0FalsePenalty for changes in flow on the line
Units-False1In (0,1)TrueFlag if interface is in service
WACC%False10≥0FalseWeighted average cost of capital
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Interface Lines Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Flow Back Coefficient-False0FalseCoefficient of counter-reference direction flow in interface
Flow Coefficient-False1FalseCoefficient of flow in interface
Flow Forward Coefficient-False0FalseCoefficient of reference direction flow in interface

Interface Transformers Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Flow Coefficient-False1FalseCoefficient of transformer flow in interface

Interface Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Expansion Cost Coefficient$False0FalseCoefficient of total build cost
Flow Back CoefficientMWFalse0FalseCoefficient of counter-reference direction flow
Flow CoefficientMWFalse0FalseCoefficient of flow
Flow Forward CoefficientMWFalse0FalseCoefficient of reference direction flow

Interface Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Expansion Cost Coefficient$False0FalseCoefficient of total expansion cost
Flow Back CoefficientMWFalse0FalseCoefficient of counter-reference direction flow
Flow CoefficientMWFalse0FalseCoefficient of flow
Flow Forward CoefficientMWFalse0FalseCoefficient of reference direction flow

Interface Conditions Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Flow CoefficientMWFalse0FalseCoefficient of flow in condition

Interface Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Available Transfer Capability - MWAvailable Transfer Capability - GWhCapacityLT Plan, MT Schedule, ST ScheduleFalseAvailable transfer capability on the interface.
Available Transfer Capability Back - MWAvailable Transfer Capability Back - GWhCapacityLT Plan, MT Schedule, ST ScheduleFalseAvailable transfer capability on the interface in the counter-reference direction.
Capacity Built - MWCapacity Built - MWExpansionLT PlanFalseCapacity built (expansion of interface in both directions)
Capacity Reserves - MWCapacity Reserves - MWCapacityLT Plan, PASA, MT Schedule, ST ScheduleFalseReserve provided by lines in the interface
Cleared Offer Cost - $Cleared Offer Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseArea cleared under offer curve
Cleared Offer Price - $/MWhCleared Offer Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleFalsePrice of marginal offer band
Expansion Cost - $000Expansion Cost - $000ExpansionLT PlanFalseCost of expanding the interface by one megawatt
Export Limit - MWExport Limit - MWProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum flow allowed on the interface
Firm Capacity - MWFirm Capacity - MWCapacityLT Plan, PASA, MT Schedule, ST ScheduleFalseContribution of the interface to region capacity reserves
Fixed Flow - MWFixed Flow - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseFixed flow on interface
Fixed Flow Violation - MWFixed Flow Violation - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Fixed Flow] constraint.
Fixed Flow Violation Cost - $Fixed Flow Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Fixed Flow] violations.
Fixed Flow Violation Hours - hFixed Flow Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours that [Fixed Flow] is violated.
Flow - MWFlow - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseFlow on the interface
Flow Back - MWFlow Back - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseFlow on the interface in the counter-reference direction
Hours Congested - hHours Congested - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the interface is congested.
Hours Congested Back - hHours Congested Back - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours the interface flow is congested in the counter-reference direction
Import Limit - MWImport Limit - MWProductionLT Plan, MT Schedule, ST ScheduleFalseMinimum flow allowed on the interface
Loading - %Loading - %ProductionLT Plan, MT Schedule, ST ScheduleFalseLoading relative to thermal limit.
Loading Back - %Loading Back - %ProductionLT Plan, MT Schedule, ST ScheduleFalseLoading in the counter-reference direction relative to thermal limit.
Max Flow - MWMax Flow - MWProductionLT Plan, MT Schedule, ST ScheduleFalseMaximum flow on interface
Min Flow - MWMin Flow - MWProductionLT Plan, MT Schedule, ST ScheduleFalseMinimum flow on interface
Net Flow - MWNet Flow - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseNet Flow on the interface
Offer Base - MWOffer Base - MWProductionLT Plan, MT Schedule, ST ScheduleFalseBase dispatch point for balancing offer
Offer Cleared - MWOffer Cleared - GWhProductionLT Plan, MT Schedule, ST ScheduleTrueQuantity cleared in band
Offer Cleared Back - MWOffer Cleared Back - GWhProductionLT Plan, MT Schedule, ST ScheduleTrueQuantity cleared in band
Offer Price - $/MWhOffer Price - $/MWhProductionLT Plan, MT Schedule, ST ScheduleTruePrice offered in band for reference direction flows
Offer Price Back - $/MWhOffer Price Back - $/MWhProductionLT Plan, MT Schedule, ST ScheduleTruePrice offered in band for counter-reference direction flows
Offer Quantity - MWOffer Quantity - GWhProductionLT Plan, MT Schedule, ST ScheduleTrueQuantity offered in band for reference direction flows
Offer Quantity Back - MWOffer Quantity Back - GWhProductionLT Plan, MT Schedule, ST ScheduleTrueQuantity offered in band for counter-reference direction flows
Ramp - MWProductionLT Plan, MT Schedule, ST ScheduleFalseChange in flow
Ramp Cost - $Ramp Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of ramping
Rental - $Rental - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFlowgate rental
Shadow Price - $/MWShadow Price - $/MWProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of interface limit in the reference direction
Shadow Price Back - $/MWShadow Price Back - $/MWProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of interface limit in the counter-reference direction
Violation - MWViolation - MWProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of the interface limit.
Violation Back - MWViolation Back - GWhProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of the interface limit in the counter-reference direction.
x xPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, PASA, MT Schedule, ST ScheduleTrueValue to pass-through to solution