Must Run Column
Column Type = Text

The Must Run column allows the user to set resources to a Must Run condition.  Users can select from the following input flags:

To learn more about the different between Must Run and Non Cycling designation, click here.

 NOTE: Hydro and pumped storage resources cannot be set as Must Run.

 NOTE: If generating resources are over specified as Must Run such that zonal output (sum of Hydro_Output and Thermal_Output) would be greater than zonal net load in any given hour, then the model will automatically report a zonal price of $-1/MWh.  Furthermore, resource Output will be adjusted down such that zonal output will equal zonal net load.

 NOTE: Inputs can be specified for any time period (annual, monthly, weekly, hourly or sub-hourly). For information on how to specify a time series for a variable, see Entering a Time Series.

 

 Input Tables

 New Resources Table

 Must Run Column