Flow Control Index
Flow Control Input Properties
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Angle | ° | False | 0 | False | Angle (initial angle when used as input) | |
Angle Points | ° | True | 0 | ≥0 | False | Flow control angle points |
Build Cost | $000 | True | 0 | False | Cost of building the flow control | |
Build Non-anticipativity | $/MW | False | -1 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Commission Date | - | False | 1 | ≥0 | False | Date the flow control was commissioned for use with [Technical Life] |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the flow control (period over which fixed costs are recovered). |
Expansion Optimality | - | False | 2 | In (0,2) | False | Expansion planning integerization scheme. |
Flow Loading Points | % | True | 100 | Between 0 And 100 | False | Flow control line flow points |
FO&M Charge | $000 | False | 0 | False | Annual fixed operation and maintenance charge | |
Lead Time | yr | False | 0 | ≥0 | False | Number of years after which the expansion project can begin |
Max Angle | ° | False | 0 | False | Max angle set on the flow control | |
Max Impedance | pu | False | 0 | False | Max Impedance | |
Max Units Built | - | False | 0 | ≥0 | False | Maximum number of units automatically constructed in aggregate over the planning horizon |
Max Units Built in Year | - | False | 1 | ≥0 | False | Maximum number of units automatically constructed in any single year of the planning horizon |
Max Voltage | kV | False | 0 | False | Max Voltage | |
Min Angle | ° | False | 0 | False | Min angle set on the flow control | |
Min Impedance | pu | False | 0 | False | Min Impedance | |
Min Units Built | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in aggregate over the planning horizon |
Min Units Built in Year | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in any single year of the planning horizon |
Min Voltage | kV | False | 0 | False | Min Voltage | |
Penalty | $/° (Metric), $/degree (U.S. Imperial) | False | 0 | False | Penalty incurred for shifting the angle | |
Price Setting | Yes/No | False | -1 | In (0,-1) | False | Flag if the flow control can transfer price across the network |
Project Start Date | - | False | 36526 | ≥0 | False | Start date of the project, for expansion planning. |
Ramp Penalty | $/MW | False | 0 | False | Penalty price per MW change in flow on the device | |
Technical Life | yr | False | 1E+30 | ≥0 | False | Technical lifetime of the flow control |
Type | - | False | 0 | In (0,1,2,3,4,5) | False | Flow control type |
Units | - | False | 1 | ≥0 | True | Number of installed units |
WACC | % | False | 10 | ≥0 | False | Weighted average cost of capital |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Flow Control Constraints Input Properties
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Angle Coefficient | ° | False | 0 | False | Coefficient of flow control angle | |
Negative Angle Coefficient | - | False | 0 | False | Boolean value (1 if the flow control angle is negative, 0 otherwise) | |
Positive Angle Coefficient | - | False | 0 | False | Boolean value (1 if the flow control angle is positive, 0 otherwise) | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built |
Flow Control Objectives Input Properties
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Angle Coefficient | ° | False | 0 | False | Coefficient of flow control angle | |
Negative Angle Coefficient | - | False | 0 | False | Boolean value (1 if the flow control angle is negative, 0 otherwise) | |
Positive Angle Coefficient | - | False | 0 | False | Boolean value (1 if the flow control angle is positive, 0 otherwise) | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built |
Flow Control Output Properties
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Angle - ° | Angle - ° | Production | LT Plan, MT Schedule, ST Schedule | False | Angle (initial angle when used as input) |
Build Cost - $000 | Build Cost - $000 | Expansion | LT Plan | False | Cost of building the flow control |
Flow - MW | Flow - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Equivalent flow in reference direction due to phase shift |
Flow Back - MW | Flow Back - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Equivalent flow against reference direction due to phase shift |
Hours Binding - h | Hours Binding - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours the flow control is operating at maximum angle. |
Impedance - pu | Impedance - pu | Production | LT Plan, MT Schedule, ST Schedule | False | Equivalent impedance |
Max Angle - ° | Max Angle - ° | Production | LT Plan, MT Schedule, ST Schedule | False | Max angle set on the flow control |
Min Angle - ° | Min Angle - ° | Production | LT Plan, MT Schedule, ST Schedule | False | Min angle set on the flow control |
Penalty - $ | Penalty - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Penalty incurred for shifting the angle |
Rental - $ | Rental - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Rental |
Shadow Price - $/° (Metric), $/degree (U.S. Imperial) | Shadow Price - $/° (Metric), $/degree (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow (expansion) price |
Units Built | Units Built | Expansion | LT Plan | False | Binary indicating if the unit was built |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |