Facility Index

Facility Attributes

NameUnitsDefault ValueValidation RuleDescription
Capacity Basis-1In (0,1)The basis for capacity-related properties where "Input" refers to the Primary Input and "Output" refers to the Primary Output
Latitude°0Latitude
Longitude°0Longitude

Facility Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk$False0FalseAcceptable risk around target net profit
Build Cost$True0FalseCost of building a unit
Build Cost Multiplier-False0In (0,1)FalseSets the unit for the input Build Cost
Build Non-anticipativity$False-1FalsePrice for violating build non-anticipativity constraints
Build Set Size-False0≥0FalseExpansion must occur in sets of this many units where zero indicates any set size
Commission Date-False1≥0FalseDate the facility was commissioned for use with [Technical Life]
Commit-False-1≥-1FalseFixed (exact) number of units operating
Economic LifeyrFalse30≥0FalseEconomic life of the unit (period over which fixed costs are recovered)
Efficiency Base~False0FalsePrimary Process consumption at notional zero production
Efficiency Incr%True100FalsePrimary Process Efficiency at the given [Efficiency Point]
Efficiency Point%True100Between 0 And 100FalseOperating level associated with [Efficiency Incr]
Expansion Optimality-False2In (0,2)FalseExpansion planning integerization scheme
Fixed Production-False0FalseFixed (exact) production
Fixed Production Global-False-1In (0,-1)FalseIf [Fixed Production] applies across all units at the Facility or unit-by-unit
Fixed Production Method-False1In (0,1)FalseMethod of interpreting zero values of the [Fixed Production] property.
Fixed Production Penalty$False-1FalsePenalty for violation of [Fixed Production]
FO&M Charge$False0FalseAnnual fixed operation and maintenance charge
Forced Outage-False0≥0FalseCapacity lost to forced outage
Forced Outage Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to forced outage
Formulate Non-convex-False2In (0,1,2)FalseControls when integers are used to enforce clearing of marginal efficiency tranches in order
Formulate RiskYes/NoFalse0In (0,-1)FalseIf constraint should be formulated to bound net profit risk
Initial Hours DownhFalse1E+30≥0FalseHours the unit has been down for at time zero
Initial Hours UphFalse0≥0FalseHours the unit has been up for at time zero
Initial Production-False0≥0FalseProduction at time zero
Initial Units Operating-False0≥0FalseNumber of units operating at time zero
Lead TimeyrFalse0≥0FalseNumber of years after which the expansion project can begin
Maintenance Frequency-True0≥0FalseFrequency of maintenance outages in an annual time frame
Maintenance Rate%True0Between 0 And 100FalseExpected proportion of time the facility is unavailable due to maintenance
Max Capacity Factor%False100Between 0 And 100FalseMaximum capacity factor in the interval
Max Capacity Factor Day%False100Between 0 And 100FalseMaximum capacity factor in day
Max Capacity Factor Hour%False100Between 0 And 100FalseMaximum capacity factor in hour
Max Capacity Factor Month%False100Between 0 And 100FalseMaximum capacity factor in month
Max Capacity Factor Week%False100Between 0 And 100FalseMaximum capacity factor in week
Max Capacity Factor Year%False100Between 0 And 100FalseMaximum capacity factor in year
Max Down TimehFalse0≥0FalseMaximum number of hours a unit can be off after being shut down
Max Efficiency Tranches-False0Between 1 And 100FalseMaximum number of tranches in the efficiency piecewise linear approximation
Max Operating Level~False0FalseMaximum unit operating capacity
Max Production~False1E+30≥0FalseMaximum production
Max Production Day~False1E+30≥0FalseMaximum production in day
Max Production Hour~False1E+30≥0FalseMaximum production in hour
Max Production Month~False1E+30≥0FalseMaximum production in month
Max Production Penalty$False-1FalsePenalty applied to violations of [Max Production] and [Max Capacity Factor] constraints
Max Production Week~False1E+30≥0FalseMaximum production in week
Max Production Year~False1E+30≥0FalseMaximum production in year
Max Ramp Down-False1E+30≥0FalseMaximum ramp down rate
Max Ramp Down Factor%False1E+30≥0FalseMaximum ramp down rate expressed as a proportion of the maximum operating level
Max Ramp Down Penalty$False-1FalsePenalty for violating [Max Ramp Down] constraint
Max Ramp Up-False1E+30≥0FalseMaximum ramp up rate
Max Ramp Up Factor%False1E+30≥0FalseMaximum ramp up rate expressed as a proportion of the maximum operating level
Max Ramp Up Penalty$False-1FalsePenalty for violating [Max Ramp Up] constraint
Max Starts-False1E+30≥0FalseMaximum number of starts allowed
Max Starts Day-False1E+30≥0FalseMaximum number of starts allowed in a day
Max Starts Hour-False1E+30≥0FalseMaximum number of starts allowed in a hour
Max Starts Month-False1E+30≥0FalseMaximum number of starts allowed in a month
Max Starts Penalty$False-1FalsePenalty applied to violations of [Max Starts] constraints
Max Starts Week-False1E+30≥0FalseMaximum number of starts allowed in a week
Max Starts Year-False1E+30≥0FalseMaximum number of starts allowed in a year
Max Time To RepairhTrue0≥0FalseMaximum time to repair
Max Units Built-False0≥0FalseMaximum number of units automatically constructed in aggregate over the planning horizon
Max Units Built in Year-False1E+30≥0FalseMaximum number of units automatically constructed in any single year of the planning horizon
Max Units Retired-False0≥0FalseMaximum number of units automatically retired in aggregate over the planning horizon
Max Units Retired in Year-False1E+30≥0FalseMaximum number of units automatically retired in any single year of the planning horizon
Max Up TimehFalse0≥0FalseMaximum number of hours a unit can be run after being started
Mean Time to RepairhTrue24≥0FalseMean time to repair
Min Capacity Factor%False0Between 0 And 100FalseMinimum capacity factor in the interval
Min Capacity Factor Day%False0Between 0 And 100FalseMinimum capacity factor in day
Min Capacity Factor Hour%False0Between 0 And 100FalseMinimum capacity factor in hour
Min Capacity Factor Month%False0Between 0 And 100FalseMinimum capacity factor in month
Min Capacity Factor Week%False0Between 0 And 100FalseMinimum capacity factor in week
Min Capacity Factor Year%False0Between 0 And 100FalseMinimum capacity factor in year
Min Down TimehFalse0≥0FalseMinimum number of hours a unit must be off after being shut down
Min Operating Factor%False0≥0FalseMinimum unit level required when operating as a proportion of the maximum
Min Operating Level~False0≥0FalseMinimum unit production level required when operating
Min Operating Level Global-False0In (0,-1)FalseIf [Min Operating Level/Factor] applies across all units at the Facility or unit-by-unit
Min Production~False0≥0FalseMinimum production
Min Production Day~False0≥0FalseMinimum production in day
Min Production Hour~False0≥0FalseMinimum production in hour
Min Production Month~False0≥0FalseMinimum production in month
Min Production Penalty$False10000FalsePenalty applied to violations of [Min Production] and [Min Capacity Factor] constraints
Min Production Week~False0≥0FalseMinimum production in week
Min Production Year~False0≥0FalseMinimum production in year
Min Time To RepairhTrue0≥0FalseMinimum time to repair
Min Units Built-False0≥0FalseMinimum number of units automatically constructed in aggregate over the planning horizon
Min Units Built in Year-False0≥0FalseMinimum number of units automatically constructed in any single year of the planning horizon
Min Units Retired-False0≥0FalseMinimum number of units automatically retired in aggregate over the planning horizon
Min Units Retired in Year-False0≥0FalseMinimum number of units automatically retired in any single year of the planning horizon
Min Up TimehFalse0≥0FalseMinimum number of hours a unit must be run after being started
Must-Run Units-False0≥0FalseNumber of must-run units
One-time Cost$000False0FalseOne-time cost associated with the project
Outage Factor%True100Between 0 And 100FalseUnit outage rating based on the unit capacity
Outage Operating Level-True0FalseUnit rating during outage
Production Non-anticipativity$False0FalsePrice for violating production non-anticipativity constraints
Production Non-anticipativity TimehFalse0≥0FalseWindow of time over which to enforce production non-anticipativity constraints
Project Start Date-False36526≥0FalseStart date of project, for expansion planning
Ramp Down Charge$False0FalseCharge applied to ramping down
Ramp Up Charge$False0FalseCharge applied to ramping up
Random Number Seed-False0Between 0 And 2147483647FalseRandom number seed assigned to the facility for the generation of outages
Repair Time Scale-True0FalseRepair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV)
Repair Time Shape-True0FalseRepair time function shape parameter (for Weibull,lognormal)
Retire Non-anticipativity$False-1FalsePrice for violating retire non-anticipativity constraints
Retirement Cost$False0FalseCost of retiring a unit
Risk Level-False0.1Between 0 and 1FalseRisk level for risk-constrained optimization
Running Cost$/h (Metric), $/hr (U.S. Imperial)False0FalseFixed cost of running a unit when operating
Shutdown Cost$False0≥0FalseCost of shutting down a unit
Shutdown Penalty$False0FalsePenalty applied to shutting down a unit
Start Cost$False0≥0FalseCost of starting a unit
Start Penalty$False0FalsePenalty applied to starting a unit
Start WindowYes/NoFalse-1In (0,-1)FalseFlag if start is allowed in the given time period
Technical LifeyrFalse1E+30≥0FalseTechnical lifetime of the unit
Unit Commitment Non-anticipativity$False0FalsePrice for violating non-anticipativity constraints in scenario-wise decomposition mode
Unit Commitment Non-anticipativity TimehFalse0≥0FalseWindow of time over which to enforce unit commitment non-anticipativity constraints
Units-False0≥0TrueNumber of existing units
Units Out-True0≥0FalseNumber of units out of service due to maintenance
VO&M Charge$False0FalseVariable operation and maintenance charge
WACC%False10≥0FalseWeighted average cost of capital
Warm Up Operating Level~False0≥0FalseUnit operating level when in the warm up period
Warm Up TimehFalse0≥0FalseNumber of hours required to warm up the Facility
x-True0FalseValue to pass-through to solution
y-True0FalseValue to pass-through to solution
z-True0FalseValue to pass-through to solution

Facility Entities Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Share%False100Between 0 And 100FalsePercentage share of interest in the Facility

Facility Constraints Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Available Capacity Coefficient-False0FalseCoefficient of available capacity
Build Cost Coefficient$False0FalseCoefficient of total build cost
Built Coefficient-False0FalseCoefficient on binary variable indicating if any capacity is built to date
Built in Year Coefficient-False0FalseCoefficient on binary variable indicating if any capacity is built in the year
Capacity Built Coefficient-False0FalseCoefficient of capacity built
Capacity Factor Coefficient-False0FalseCoefficient of capacity factor
Capacity Retired Coefficient-False0FalseCoefficient of capacity retired
Consumption Coefficient-False0FalseCoefficient of Facility consumption in the Constraint
Hours Down CoefficienthFalse0FalseCoefficient of number of hours the unit has been off
Installed Capacity Coefficient-False0FalseCoefficient of installed capacity
Maintenance Coefficient-False0FalseCoefficient of capacity on maintenance
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Operating Capacity Coefficient-False0FalseCoefficient of capacity of operating units
Operating Hours CoefficienthFalse0FalseCoefficient of number of hours of operation
Production Coefficient-False0FalseCoefficient of Facility production in the Constraint
Ramp Coefficient-False0FalseCoefficient of ramp
Ramp Down Coefficient-False0FalseCoefficient of ramp down
Ramp Down Violation Coefficient-False0FalseCoefficient of max ramp down violation
Ramp Up Coefficient-False0FalseCoefficient of ramp up
Ramp Up Violation Coefficient-False0FalseCoefficient of max ramp up violation
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year
Units Operating Coefficient-False0FalseCoefficient on the number of units operating
Units Out Coefficient-False0FalseCoefficient on the number of units out of service
Units Retired Coefficient-False0FalseCoefficient of number of units retired
Units Retired in Year Coefficient-False0FalseCoefficient of number of units retired in the year
Units Shutdown Coefficient-False0FalseCoefficient on the number of units shutdown
Units Started Coefficient-False0FalseCoefficient on the number of units started

Facility Objectives Input Properties

NameUnitsMulti-bandDefault ValueValidation RuleKey PropertyDescription
Acceptable Risk Coefficient-False0FalseCoefficient of entity acceptable risk
Available Capacity Coefficient-False0FalseCoefficient of available capacity
Build Cost Coefficient$False0FalseCoefficient of total build cost
Built Coefficient-False0FalseCoefficient on binary variable indicating if any capacity is built to date
Built in Year Coefficient-False0FalseCoefficient on binary variable indicating if any capacity is built in the year
Capacity Built Coefficient-False0FalseCoefficient of capacity built
Capacity Factor Coefficient-False0FalseCoefficient of capacity factor
Capacity Retired Coefficient-False0FalseCoefficient of capacity retired
Consumption Coefficient-False0FalseCoefficient of Facility consumption in the Objective
Hours Down CoefficienthFalse0FalseCoefficient of number of hours the unit has been off
Installed Capacity Coefficient-False0FalseCoefficient of installed capacity
Maintenance Coefficient-False0FalseCoefficient of capacity on maintenance
Net Profit Coefficient$False0FalseCoefficient of net profit
Net Revenue Coefficient$False0FalseCoefficient of net revenue
Operating Capacity Coefficient-False0FalseCoefficient of capacity of operating units
Operating Hours CoefficienthFalse0FalseCoefficient of number of hours of operation
Production Coefficient-False0FalseCoefficient of Facility production
Ramp Coefficient-False0FalseCoefficient of ramp
Ramp Down Coefficient-False0FalseCoefficient of ramp down
Ramp Down Violation Coefficient-False0FalseCoefficient of max ramp down violation
Ramp Up Coefficient-False0FalseCoefficient of ramp up
Ramp Up Violation Coefficient-False0FalseCoefficient of max ramp up violation
Units Built Coefficient-False0FalseCoefficient of number of units built
Units Built in Year Coefficient-False0FalseCoefficient of number of units built in the year
Units Operating Coefficient-False0FalseCoefficient on the number of units operating
Units Out Coefficient-False0FalseCoefficient on the number of units out of service
Units Retired Coefficient-False0FalseCoefficient of number of units retired
Units Retired in Year Coefficient-False0FalseCoefficient of number of units retired in the year
Units Shutdown Coefficient-False0FalseCoefficient on the number of units shutdown
Units Started Coefficient-False0FalseCoefficient on the number of units started

Facility Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Annualized Build Cost - $000Annualized Build Cost - $000ExpansionLT PlanFalseAnnualized cost of units built
Available Capacity - ~Available Capacity - ~CapacityLT Plan, MT Schedule, ST ScheduleFalseAvailable capacity
Average Cost - $/~Average Cost - $/~ProductionLT Plan, MT Schedule, ST ScheduleFalseAverage cost of production
Build Cost - $000Build Cost - $000ExpansionLT PlanFalseCost of units built
Capacity Built - ~Capacity Built - ~ExpansionLT PlanFalseCapacity built
Capacity Factor - %Capacity Factor - %ProductionLT Plan, MT Schedule, ST ScheduleFalseProportion of capacity in production
Capacity Price - $Capacity Price - $ExpansionLT Plan, MT Schedule, ST ScheduleFalsePrice of new capacity
Capacity Retired - ~Capacity Retired - ~ExpansionLT PlanFalseCapacity retired
Capacity Revenue - $Capacity Revenue - $000ExpansionLT Plan, MT Schedule, ST ScheduleFalseRevenue from capacity payments
Consumption - ~Consumption - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseConsumption of the Primary Input Commodity by the Facility
Discrete Maintenance - ~Discrete Maintenance - ~ReliabilityPASAFalsePlanned capacity out of service
Distributed Maintenance - ~Distributed Maintenance - ~ReliabilityPASAFalseIdeal capacity out of service
Efficiency - %Efficiency - %ProductionLT Plan, MT Schedule, ST ScheduleFalseEfficiency of production
Fixed Costs - $Fixed Costs - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal fixed costs including amortized build costs
Fixed Production - ~Fixed Production - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseProduction attributable to [Fixed Operating Level] constraint
Fixed Production Violation - ~Fixed Production Violation - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Fixed Operating Level] constraint
Fixed Production Violation Cost - $Fixed Production Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Fixed Operating Level] violations
Fixed Production Violation Hours - hFixed Production Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours that [Fixed Operating Level] is violated
FO&M Cost - $FO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseFixed operation and maintenance cost
Forced Outage - ~Forced Outage - ~ReliabilityLT Plan, MT Schedule, ST ScheduleFalseCapacity lost to forced outage
Forced Outage Hours - hForced Outage Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours on forced outage
Forced Outage Rate - %Forced Outage Rate - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of capacity on forced outage
Hours Down - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours since the last shutdown
Hours Up - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours since the last start
Installed Capacity - ~Installed Capacity - ~CapacityLT Plan, PASA, MT Schedule, ST ScheduleFalseInstalled capacity (Max Operating Level x Units)
Levelized Cost - $Levelized Cost - $ExpansionLT PlanFalseLevelized cost of production
Maintenance - ~Maintenance - ~ReliabilityLT Plan, PASA, MT Schedule, ST ScheduleFalseCapacity out on maintenance
Maintenance Hours - hMaintenance Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours on maintenance
Maintenance Rate - %Maintenance Rate - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of capacity on maintenance outage
Marginal Cost - $/~Marginal Cost - $/~ProductionLT Plan, MT Schedule, ST ScheduleFalseMarginal cost of production
Max Production Violation - ~Max Production Violation - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Production] or [Max Capacity Factor] constraints
Max Production Violation Cost - $Max Production Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Production] or [Max Capacity Factor] constraint violations
Max Starts Violation Max Starts ViolationProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Starts] constraints
Max Starts Violation Cost - $Max Starts Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Starts] constraint violations
Min Production Violation - ~Min Production Violation - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Min Operating Level] constraint
Min Production Violation Cost - $Min Production Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Min Operating Level] violations
Min Production Violation Hours - hMin Production Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours that [Min Operating Level] is violated
Minutes of Ramp Down - minMinutes of Ramp Down - minProductionLT Plan, MT Schedule, ST ScheduleFalseTotal minutes spent ramping down
Minutes of Ramp Up - minMinutes of Ramp Up - minProductionLT Plan, MT Schedule, ST ScheduleFalseTotal minutes spent ramping up
Net New Capacity - ~Net New Capacity - ~ExpansionLT PlanFalseCapacity net of build and retire
Net Profit - $Net Profit - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseNet profit = net revenue - fixed costs
Operating Hours - hOperating Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of operation
Outage - MWOutage - GWhReliabilityLT Plan, MT Schedule, ST ScheduleFalseCapacity lost to outage
Outage Hours - hOutage Hours - hReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of hours on outage
Outage Rate - %Outage Rate - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of installed capacity on outage
Price Received - $Price Received - $ProductionLT Plan, MT Schedule, ST ScheduleFalsePrice received for production
Production - ~Production - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseProduction of the Primary Output Commodity by the Facility
Production Cost - $Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of production
Ramp - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseRate at which units are ramping
Ramp Down Ramp DownProductionLT Plan, MT Schedule, ST ScheduleFalseTotal ramping down
Ramp Down Cost - $Ramp Down Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of ramp down charged at [Ramp Down Charge]
Ramp Down Price - $Ramp Down Price - $ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of the maximum ramping down constraint
Ramp Down Violation Ramp Down ViolationProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Ramp Down] constraint
Ramp Down Violation Cost - $Ramp Down Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Ramp Down] violations
Ramp Down Violation Hours - hRamp Down Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of [Max Ramp Down] violation
Ramp Up - ~Ramp Up - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal ramping up
Ramp Up Cost - $Ramp Up Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of ramp up charged at [Ramp Up Charge]
Ramp Up Price - $Ramp Up Price - $ProductionLT Plan, MT Schedule, ST ScheduleFalseShadow price of the maximum ramping up constraint
Ramp Up Violation - ~Ramp Up Violation - ~ProductionLT Plan, MT Schedule, ST ScheduleFalseViolation of [Max Ramp Up] constraint
Ramp Up Violation Cost - $Ramp Up Violation Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of [Max Ramp Up] violations
Ramp Up Violation Hours - hRamp Up Violation Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours of [Max Ramp Up] violation
Retirement Cost - $000Retirement Cost - $000ExpansionLT PlanFalseCost of retiring a unit
Revenue - $Revenue - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseRevenue for production
Service Factor - %Service Factor - %ReliabilityLT Plan, MT Schedule, ST ScheduleFalseProportion of capacity available for production
Start & Shutdown Cost - $Start & Shutdown Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseCost of unit start up and shutdown
Start & Shutdown Penalty Cost - $Start & Shutdown Penalty Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalsePenalty cost of unit start up and shutdown
Total Cost - $000Total Cost - $000ExpansionLT PlanFalseTotal of fixed and variable costs
Total Production Cost - $Total Production Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal production cost including production, VO&M, start and shutdown costs
Units UnitsProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of existing units
Units Built Units BuiltExpansionLT PlanFalseNumber of units built
Units Operating ProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units operating
Units Out ReliabilityLT Plan, MT Schedule, ST ScheduleFalseNumber of units out of service due to maintenance
Units Retired Units RetiredExpansionLT PlanFalseNumber of units retired
Units Shutdown Units ShutdownProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units shutdown
Units Started Units StartedProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units started
Units Warming Up ProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of units in the warm up process
VO&M Charge - $VO&M Charge - $ProductionLT Plan, MT Schedule, ST ScheduleFalseVariable operation and maintenance charge
VO&M Cost - $VO&M Cost - $000ProductionLT Plan, MT Schedule, ST ScheduleFalseTotal variable operation and maintenance cost
Warm Up Hours - hWarm Up Hours - hProductionLT Plan, MT Schedule, ST ScheduleFalseNumber of hours warming up
x xPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
y yPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution
z zPass-throughLT Plan, MT Schedule, ST ScheduleTrueValue to pass-through to solution

Facility.Primary Inputs Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Consumption ConsumptionProductionLT Plan, MT Schedule, ST ScheduleTrueAmount of Process Primary Input Commodity consumed by the Facility

Facility.Primary Outputs Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Production ProductionProductionLT Plan, MT Schedule, ST ScheduleTrueAmount of Process Primary Output Commodity produced by the Facility

Facility.Secondary Inputs Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Consumption ConsumptionProductionLT Plan, MT Schedule, ST ScheduleTrueAmount of Process Secondary Input Commodity consumed by the Facility

Facility.Secondary Outputs Output Properties

NameSummary NameProperty GroupPhasesMulti-bandDescription
Production ProductionProductionLT Plan, MT Schedule, ST ScheduleTrueAmount of Process Secondary Output Commodity produced by the Facility