Name | Units | Default Value | Validation Rule | Description |
---|---|---|---|---|
Capacity Basis | - | 1 | In (0,1) | The basis for capacity-related properties where "Input" refers to the Primary Input and "Output" refers to the Primary Output |
Latitude | ° | 0 | Latitude | |
Longitude | ° | 0 | Longitude |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Acceptable Risk | $ | False | 0 | False | Acceptable risk around target net profit | |
Build Cost | $ | True | 0 | False | Cost of building a unit | |
Build Cost Multiplier | - | False | 0 | In (0,1) | False | Sets the unit for the input Build Cost |
Build Non-anticipativity | $ | False | -1 | False | Price for violating build non-anticipativity constraints | |
Build Set Size | - | False | 0 | ≥0 | False | Expansion must occur in sets of this many units where zero indicates any set size |
Commission Date | - | False | 1 | ≥0 | False | Date the facility was commissioned for use with [Technical Life] |
Commit | - | False | -1 | ≥-1 | False | Fixed (exact) number of units operating |
Consumption Base | ~ | False | 0 | False | Primary Process consumption at notional zero production | |
Consumption Incr | ~/~ | False | 1 | False | Primary Process consumption function first-order term | |
Consumption Incr2 | ~/~² | False | 0 | False | Primary Process consumption function second-order term | |
Consumption Incr3 | ~/~³ | False | 0 | False | Primary Process consumption function third-order term | |
Economic Life | yr | False | 30 | ≥0 | False | Economic life of the unit (period over which fixed costs are recovered) |
Efficiency | % | True | 100 | False | Primary Process average efficiency at the given [Efficiency Point] | |
Efficiency Incr | % | True | 100 | False | Primary Process marginal efficiency at the given [Efficiency Point] | |
Efficiency Point | % | True | 100 | Between 0 And 100 | False | Operating level associated with [Efficiency Incr] |
Expansion Optimality | - | False | 2 | In (0,2) | False | Expansion planning integerization scheme |
Fixed Production | - | False | 0 | False | Fixed (exact) production | |
Fixed Production Global | - | False | -1 | In (0,-1) | False | If [Fixed Production] applies across all units at the Facility or unit-by-unit |
Fixed Production Method | - | False | 1 | In (0,1) | False | Method of interpreting zero values of the [Fixed Production] property. |
Fixed Production Penalty | $ | False | -1 | False | Penalty for violation of [Fixed Production] | |
FO&M Charge | $/~/yr | False | 0 | False | Annual fixed operation and maintenance charge | |
Forced Outage | - | False | 0 | ≥0 | False | Capacity lost to forced outage |
Forced Outage Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to forced outage |
Formulate Non-convex | - | False | 2 | In (0,1,2) | False | Controls when integers are used to enforce clearing of marginal efficiency tranches in order |
Formulate Risk | Yes/No | False | 0 | In (0,-1) | False | If constraint should be formulated to bound net profit risk |
Hint Units Built | - | False | 0 | ≥0 | False | Capacity expansion solution to be passed to the optimizer as a hint or initial solution |
Initial Hours Down | h | False | 1E+30 | ≥0 | False | Hours the unit has been down for at time zero |
Initial Hours Up | h | False | 0 | ≥0 | False | Hours the unit has been up for at time zero |
Initial Production | - | False | 0 | ≥0 | False | Production at time zero |
Initial Units Operating | - | False | 0 | ≥0 | False | Number of units operating at time zero |
Integerization Horizon | yr | False | -1 | ≥-1 | False | Number of years over which the expansion decisions are integerized |
Lead Time | yr | False | 0 | ≥0 | False | Number of years after which the expansion project can begin |
Maintenance Frequency | - | True | 0 | ≥0 | False | Frequency of maintenance outages in an annual time frame |
Maintenance Rate | % | True | 0 | Between 0 And 100 | False | Expected proportion of time the facility is unavailable due to maintenance |
Max Capacity Factor | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in the interval |
Max Capacity Factor Day | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in day |
Max Capacity Factor Hour | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in hour |
Max Capacity Factor Month | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in month |
Max Capacity Factor Week | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in week |
Max Capacity Factor Year | % | False | 100 | Between 0 And 100 | False | Maximum capacity factor in year |
Max Down Time | h | False | 0 | ≥0 | False | Maximum number of hours a unit can be off after being shut down |
Max Efficiency Tranches | - | False | 0 | Between 1 And 100 | False | Maximum number of tranches in the efficiency piecewise linear approximation |
Max Operating Level | ~ | False | 0 | False | Maximum unit operating capacity | |
Max Production | ~ | False | 1E+30 | ≥0 | False | Maximum production |
Max Production Day | ~ | False | 1E+30 | ≥0 | False | Maximum production in day |
Max Production Hour | ~ | False | 1E+30 | ≥0 | False | Maximum production in hour |
Max Production Month | ~ | False | 1E+30 | ≥0 | False | Maximum production in month |
Max Production Penalty | $ | False | -1 | False | Penalty applied to violations of [Max Production] and [Max Capacity Factor] constraints | |
Max Production Week | ~ | False | 1E+30 | ≥0 | False | Maximum production in week |
Max Production Year | ~ | False | 1E+30 | ≥0 | False | Maximum production in year |
Max Ramp Down | - | False | 1E+30 | ≥0 | False | Maximum ramp down rate |
Max Ramp Down Factor | % | False | 1E+30 | ≥0 | False | Maximum ramp down rate expressed as a proportion of the maximum operating level |
Max Ramp Down Penalty | $ | False | -1 | False | Penalty for violating [Max Ramp Down] constraint | |
Max Ramp Up | - | False | 1E+30 | ≥0 | False | Maximum ramp up rate |
Max Ramp Up Factor | % | False | 1E+30 | ≥0 | False | Maximum ramp up rate expressed as a proportion of the maximum operating level |
Max Ramp Up Penalty | $ | False | -1 | False | Penalty for violating [Max Ramp Up] constraint | |
Max Starts | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed |
Max Starts Day | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a day |
Max Starts Hour | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a hour |
Max Starts Month | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a month |
Max Starts Penalty | $ | False | -1 | False | Penalty applied to violations of [Max Starts] constraints | |
Max Starts Week | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a week |
Max Starts Year | - | False | 1E+30 | ≥0 | False | Maximum number of starts allowed in a year |
Max Time To Repair | h | True | 0 | ≥0 | False | Maximum time to repair |
Max Units Built | - | False | 0 | ≥0 | False | Maximum number of units automatically constructed in aggregate over the planning horizon |
Max Units Built in Year | - | False | 1E+30 | ≥0 | False | Maximum number of units automatically constructed in any single year of the planning horizon |
Max Units Retired | - | False | 0 | ≥0 | False | Maximum number of units automatically retired in aggregate over the planning horizon |
Max Units Retired in Year | - | False | 1E+30 | ≥0 | False | Maximum number of units automatically retired in any single year of the planning horizon |
Max Up Time | h | False | 0 | ≥0 | False | Maximum number of hours a unit can be run after being started |
Mean Time to Repair | h | True | 24 | ≥0 | False | Mean time to repair |
Min Capacity Factor | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in the interval |
Min Capacity Factor Day | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in day |
Min Capacity Factor Hour | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in hour |
Min Capacity Factor Month | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in month |
Min Capacity Factor Week | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in week |
Min Capacity Factor Year | % | False | 0 | Between 0 And 100 | False | Minimum capacity factor in year |
Min Down Time | h | False | 0 | ≥0 | False | Minimum number of hours a unit must be off after being shut down |
Min Operating Factor | % | False | 0 | ≥0 | False | Minimum unit level required when operating as a proportion of the maximum |
Min Operating Level | ~ | False | 0 | ≥0 | False | Minimum unit production level required when operating |
Min Operating Level Global | - | False | 0 | In (0,-1) | False | If [Min Operating Level/Factor] applies across all units at the Facility or unit-by-unit |
Min Production | ~ | False | 0 | ≥0 | False | Minimum production |
Min Production Day | ~ | False | 0 | ≥0 | False | Minimum production in day |
Min Production Hour | ~ | False | 0 | ≥0 | False | Minimum production in hour |
Min Production Month | ~ | False | 0 | ≥0 | False | Minimum production in month |
Min Production Penalty | $ | False | -1 | False | Penalty applied to violations of [Min Production] and [Min Capacity Factor] constraints | |
Min Production Week | ~ | False | 0 | ≥0 | False | Minimum production in week |
Min Production Year | ~ | False | 0 | ≥0 | False | Minimum production in year |
Min Time To Repair | h | True | 0 | ≥0 | False | Minimum time to repair |
Min Units Built | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in aggregate over the planning horizon |
Min Units Built in Year | - | False | 0 | ≥0 | False | Minimum number of units automatically constructed in any single year of the planning horizon |
Min Units Retired | - | False | 0 | ≥0 | False | Minimum number of units automatically retired in aggregate over the planning horizon |
Min Units Retired in Year | - | False | 0 | ≥0 | False | Minimum number of units automatically retired in any single year of the planning horizon |
Min Up Time | h | False | 0 | ≥0 | False | Minimum number of hours a unit must be run after being started |
Must-Run Units | - | False | 0 | ≥0 | False | Number of must-run units |
One-time Cost | $000 | False | 0 | False | One-time cost associated with the project | |
Outage Factor | % | True | 100 | Between 0 And 100 | False | Unit outage rating based on the unit capacity |
Outage Operating Level | - | True | 0 | False | Unit rating during outage | |
Production Non-anticipativity | $ | False | 0 | False | Price for violating production non-anticipativity constraints | |
Production Non-anticipativity Time | h | False | 0 | ≥0 | False | Window of time over which to enforce production non-anticipativity constraints |
Project Start Date | - | False | 36526 | ≥0 | False | Start date of project, for expansion planning |
Ramp Down Charge | $ | False | 0 | False | Charge applied to ramping down | |
Ramp Up Charge | $ | False | 0 | False | Charge applied to ramping up | |
Random Number Seed | - | False | 0 | Between 0 And 2147483647 | False | Random number seed assigned to the facility for the generation of outages |
Repair Time Scale | - | True | 0 | False | Repair time function scale parameter (for exponential,Weibull,lognormal,SEV,LEV) | |
Repair Time Shape | - | True | 0 | False | Repair time function shape parameter (for Weibull,lognormal) | |
Retire Non-anticipativity | $ | False | -1 | False | Price for violating retire non-anticipativity constraints | |
Retirement Cost | $ | False | 0 | False | Cost of retiring a unit | |
Risk Level | - | False | 0.1 | Between 0 and 1 | False | Risk level for risk-constrained optimization |
Running Cost | $/h (Metric), $/hr (U.S. Imperial) | False | 0 | False | Fixed cost of running a unit when operating | |
Shutdown Cost | $ | False | 0 | ≥0 | False | Cost of shutting down a unit |
Shutdown Penalty | $ | False | 0 | False | Penalty applied to shutting down a unit | |
Start Cost | $ | False | 0 | ≥0 | False | Cost of starting a unit |
Start Penalty | $ | False | 0 | False | Penalty applied to starting a unit | |
Start Window | Yes/No | False | -1 | In (0,-1) | False | Flag if start is allowed in the given time period |
Technical Life | yr | False | 1E+30 | ≥0 | False | Technical lifetime of the unit |
Unit Commitment Non-anticipativity | $ | False | 0 | False | Price for violating non-anticipativity constraints in scenario-wise decomposition mode | |
Unit Commitment Non-anticipativity Time | h | False | 0 | ≥0 | False | Window of time over which to enforce unit commitment non-anticipativity constraints |
Units | - | False | 0 | ≥0 | True | Number of existing units |
Units Out | - | True | 0 | ≥0 | False | Number of units out of service due to maintenance |
VO&M Charge | $ | False | 0 | False | Variable operation and maintenance charge | |
WACC | % | False | 10 | ≥0 | False | Weighted average cost of capital |
Warm Up Operating Level | ~ | False | 0 | ≥0 | False | Unit operating level when in the warm up period |
Warm Up Time | h | False | 0 | ≥0 | False | Number of hours required to warm up the Facility |
x | - | True | 0 | False | Value to pass-through to solution | |
y | - | True | 0 | False | Value to pass-through to solution | |
z | - | True | 0 | False | Value to pass-through to solution |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Production Coefficient | - | False | 0 | False | Consumption for each unit of production | |
Units Coefficient | - | False | 0 | False | Consumption for each installed unit | |
Units Operating Coefficient | - | False | 0 | False | Consumption for each unit operating |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Share | % | False | 100 | Between 0 And 100 | False | Percentage share of interest in the Facility |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Acceptable Risk Coefficient | - | False | 0 | False | Coefficient of entity acceptable risk | |
Available Capacity Coefficient | - | False | 0 | False | Coefficient of available capacity | |
Build Cost Coefficient | $ | False | 0 | False | Coefficient of total build cost | |
Built Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built to date | |
Built in Year Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built in the year | |
Capacity Built Coefficient | - | False | 0 | False | Coefficient of capacity built | |
Capacity Factor Coefficient | - | False | 0 | False | Coefficient of capacity factor | |
Capacity Retired Coefficient | - | False | 0 | False | Coefficient of capacity retired | |
Consumption Coefficient | - | False | 0 | False | Coefficient of Facility consumption in the Constraint | |
Hours Down Coefficient | h | False | 0 | False | Coefficient of number of hours the unit has been off | |
Installed Capacity Coefficient | - | False | 0 | False | Coefficient of installed capacity | |
Maintenance Coefficient | - | False | 0 | False | Coefficient of capacity on maintenance | |
Net Profit Coefficient | $ | False | 0 | False | Coefficient of net profit | |
Net Revenue Coefficient | $ | False | 0 | False | Coefficient of net revenue | |
Operating Capacity Coefficient | - | False | 0 | False | Coefficient of capacity of operating units | |
Operating Hours Coefficient | h | False | 0 | False | Coefficient of number of hours of operation | |
Production Coefficient | - | False | 0 | False | Coefficient of Facility production in the Constraint | |
Ramp Coefficient | - | False | 0 | False | Coefficient of ramp | |
Ramp Down Coefficient | - | False | 0 | False | Coefficient of ramp down | |
Ramp Down Violation Coefficient | - | False | 0 | False | Coefficient of max ramp down violation | |
Ramp Up Coefficient | - | False | 0 | False | Coefficient of ramp up | |
Ramp Up Violation Coefficient | - | False | 0 | False | Coefficient of max ramp up violation | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year | |
Units Coefficient | - | False | 0 | False | Coefficient of the number of installed units | |
Units Operating Coefficient | - | False | 0 | False | Coefficient on the number of units operating | |
Units Out Coefficient | - | False | 0 | False | Coefficient on the number of units out of service | |
Units Retired Coefficient | - | False | 0 | False | Coefficient of number of units retired | |
Units Retired in Year Coefficient | - | False | 0 | False | Coefficient of number of units retired in the year | |
Units Shutdown Coefficient | - | False | 0 | False | Coefficient on the number of units shutdown | |
Units Started Coefficient | - | False | 0 | False | Coefficient on the number of units started |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Acceptable Risk Coefficient | - | False | 0 | False | Coefficient of entity acceptable risk | |
Available Capacity Coefficient | - | False | 0 | False | Coefficient of available capacity | |
Build Cost Coefficient | $ | False | 0 | False | Coefficient of total build cost | |
Built Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built to date | |
Built in Year Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built in the year | |
Capacity Built Coefficient | - | False | 0 | False | Coefficient of capacity built | |
Capacity Factor Coefficient | - | False | 0 | False | Coefficient of capacity factor | |
Capacity Retired Coefficient | - | False | 0 | False | Coefficient of capacity retired | |
Consumption Coefficient | - | False | 0 | False | Coefficient of Facility consumption in the Objective | |
Hours Down Coefficient | h | False | 0 | False | Coefficient of number of hours the unit has been off | |
Installed Capacity Coefficient | - | False | 0 | False | Coefficient of installed capacity | |
Maintenance Coefficient | - | False | 0 | False | Coefficient of capacity on maintenance | |
Net Profit Coefficient | $ | False | 0 | False | Coefficient of net profit | |
Net Revenue Coefficient | $ | False | 0 | False | Coefficient of net revenue | |
Operating Capacity Coefficient | - | False | 0 | False | Coefficient of capacity of operating units | |
Operating Hours Coefficient | h | False | 0 | False | Coefficient of number of hours of operation | |
Production Coefficient | - | False | 0 | False | Coefficient of Facility production | |
Ramp Coefficient | - | False | 0 | False | Coefficient of ramp | |
Ramp Down Coefficient | - | False | 0 | False | Coefficient of ramp down | |
Ramp Down Violation Coefficient | - | False | 0 | False | Coefficient of max ramp down violation | |
Ramp Up Coefficient | - | False | 0 | False | Coefficient of ramp up | |
Ramp Up Violation Coefficient | - | False | 0 | False | Coefficient of max ramp up violation | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year | |
Units Coefficient | - | False | 0 | False | Coefficient of the number of installed units | |
Units Operating Coefficient | - | False | 0 | False | Coefficient on the number of units operating | |
Units Out Coefficient | - | False | 0 | False | Coefficient on the number of units out of service | |
Units Retired Coefficient | - | False | 0 | False | Coefficient of number of units retired | |
Units Retired in Year Coefficient | - | False | 0 | False | Coefficient of number of units retired in the year | |
Units Shutdown Coefficient | - | False | 0 | False | Coefficient on the number of units shutdown | |
Units Started Coefficient | - | False | 0 | False | Coefficient on the number of units started |
Name | Units | Multi-band | Default Value | Validation Rule | Key Property | Description |
---|---|---|---|---|---|---|
Available Capacity Coefficient | MW | False | 0 | False | Coefficient of available capacity | |
Built Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built to date | |
Built in Year Coefficient | - | False | 0 | False | Coefficient on binary variable indicating if any capacity is built in the year | |
Capacity Built Coefficient | - | False | 0 | False | Coefficient of capacity built | |
Capacity Retired Coefficient | - | False | 0 | False | Coefficient of capacity retired | |
Consumption Coefficient | - | False | 0 | False | Coefficient of Facility consumption | |
Installed Capacity Coefficient | - | False | 0 | False | Coefficient of installed capacity | |
Operating Hours Coefficient | h | False | 0 | False | Coefficient of number of hours of operation | |
Outage Coefficient | MW | False | 0 | False | Coefficient of capacity on outage | |
Production Coefficient | - | False | 0 | False | Coefficient of Facility production | |
Units Built Coefficient | - | False | 0 | False | Coefficient of number of units built | |
Units Built in Year Coefficient | - | False | 0 | False | Coefficient of number of units built in the year | |
Units Operating Coefficient | - | False | 0 | False | Coefficient of the number of units operating | |
Units Out Coefficient | - | False | 0 | False | Coefficient on the number of units out of service | |
Units Retired Coefficient | - | False | 0 | False | Coefficient of number of units retired | |
Units Retired in Year Coefficient | - | False | 0 | False | Coefficient of number of units retired in the year | |
Units Shutdown Coefficient | - | False | 0 | False | Coefficient of number of units shutdown | |
Units Started Coefficient | - | False | 0 | False | Coefficient of the number of unit started |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Annualized Build Cost - $000 | Annualized Build Cost - $000 | Expansion | LT Plan | False | Annualized cost of units built |
Available Capacity - ~ | Available Capacity - ~ | Capacity | LT Plan, MT Schedule, ST Schedule | False | Available capacity |
Average Cost - $/~ | Average Cost - $/~ | Production | LT Plan, MT Schedule, ST Schedule | False | Average cost of production |
Build Cost - $000 | Build Cost - $000 | Expansion | LT Plan | False | Cost of units built |
Capacity Built - ~ | Capacity Built - ~ | Expansion | LT Plan | False | Capacity built |
Capacity Factor - % | Capacity Factor - % | Production | LT Plan, MT Schedule, ST Schedule | False | Proportion of capacity in production |
Capacity Price - $ | Capacity Price - $ | Expansion | LT Plan, MT Schedule, ST Schedule | False | Price of new capacity |
Capacity Retired - ~ | Capacity Retired - ~ | Expansion | LT Plan | False | Capacity retired |
Capacity Revenue - $ | Capacity Revenue - $000 | Expansion | LT Plan, MT Schedule, ST Schedule | False | Revenue from capacity payments |
Consumption - ~ | Consumption - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Consumption of the Primary Input Commodity by the Facility |
Discrete Maintenance - ~ | Discrete Maintenance - ~ | Reliability | PASA | False | Planned capacity out of service |
Distributed Maintenance - ~ | Distributed Maintenance - ~ | Reliability | PASA | False | Ideal capacity out of service |
Efficiency - % | Efficiency - % | Production | LT Plan, MT Schedule, ST Schedule | False | Average efficiency of production |
Efficiency Incr - % | Efficiency Incr - % | Production | LT Plan, MT Schedule, ST Schedule | False | Marginal efficiency of production |
Electric Energy Consumption - MWh | Electric Energy Consumption - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Electric energy consumption |
Electric Energy Cost - $ | Electric Energy Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of electric energy consumed |
Electric Energy Production - MWh | Electric Energy Production - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Electric energy production |
Electric Energy Revenue - $ | Electric Energy Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from electric energy produced |
Fixed Costs - $ | Fixed Costs - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total fixed costs including amortized build costs |
Fixed Production - ~ | Fixed Production - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Production attributable to [Fixed Operating Level] constraint |
Fixed Production Violation - ~ | Fixed Production Violation - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Fixed Operating Level] constraint |
Fixed Production Violation Cost - $ | Fixed Production Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Fixed Operating Level] violations |
Fixed Production Violation Hours - h | Fixed Production Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours that [Fixed Operating Level] is violated |
FO&M Cost - $ | FO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Fixed operation and maintenance cost |
Forced Outage - ~ | Forced Outage - ~ | Reliability | LT Plan, MT Schedule, ST Schedule | False | Capacity lost to forced outage |
Forced Outage Hours - h | Forced Outage Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours on forced outage |
Forced Outage Rate - % | Forced Outage Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of capacity on forced outage |
Gas Consumption - GJ (Metric), MMBtu (U.S. Imperial) | Gas Consumption - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas consumption |
Gas Cost - $ | Gas Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of gas consumed |
Gas Production - GJ (Metric), MMBtu (U.S. Imperial) | Gas Production - TJ (Metric), BBtu (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Gas production |
Gas Revenue - $ | Gas Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from gas produced |
Heat Consumption - MWh | Heat Consumption - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Heat consumption |
Heat Cost - $ | Heat Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of heat consumed |
Heat Production - MWh | Heat Production - GWh | Production | LT Plan, MT Schedule, ST Schedule | False | Heat production |
Heat Revenue - $ | Heat Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from heat produced |
Hours Down - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours since the last shutdown | |
Hours Up - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours since the last start | |
Installed Capacity - ~ | Installed Capacity - ~ | Capacity | LT Plan, PASA, MT Schedule, ST Schedule | False | Installed capacity (Max Operating Level x Units) |
Levelized Cost - $ | Levelized Cost - $ | Expansion | LT Plan | False | Levelized cost of production |
Maintenance - ~ | Maintenance - ~ | Reliability | LT Plan, PASA, MT Schedule, ST Schedule | False | Capacity out on maintenance |
Maintenance Hours - h | Maintenance Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours on maintenance |
Maintenance Rate - % | Maintenance Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of capacity on maintenance outage |
Marginal Cost - $/~ | Marginal Cost - $/~ | Production | LT Plan, MT Schedule, ST Schedule | False | Marginal cost of production |
Max Production Violation - ~ | Max Production Violation - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Production] or [Max Capacity Factor] constraints |
Max Production Violation Cost - $ | Max Production Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Production] or [Max Capacity Factor] constraint violations |
Max Starts Violation | Max Starts Violation | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Starts] constraints |
Max Starts Violation Cost - $ | Max Starts Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Starts] constraint violations |
Min Production Violation - ~ | Min Production Violation - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Min Operating Level] constraint |
Min Production Violation Cost - $ | Min Production Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Min Operating Level] violations |
Min Production Violation Hours - h | Min Production Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours that [Min Operating Level] is violated |
Minutes of Ramp Down - min | Minutes of Ramp Down - min | Production | LT Plan, MT Schedule, ST Schedule | False | Total minutes spent ramping down |
Minutes of Ramp Up - min | Minutes of Ramp Up - min | Production | LT Plan, MT Schedule, ST Schedule | False | Total minutes spent ramping up |
Net New Capacity - ~ | Net New Capacity - ~ | Expansion | LT Plan | False | Capacity net of build and retire |
Net Profit - $ | Net Profit - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Net profit = net revenue - fixed costs |
Operating Hours - h | Operating Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of operation |
Outage - MW | Outage - GWh | Reliability | LT Plan, MT Schedule, ST Schedule | False | Capacity lost to outage |
Outage Hours - h | Outage Hours - h | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of hours on outage |
Outage Rate - % | Outage Rate - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of installed capacity on outage |
Price Received - $ | Price Received - $ | Production | LT Plan, MT Schedule, ST Schedule | False | Price received for production |
Production - ~ | Production - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Production of the Primary Output Commodity by the Facility |
Production Cost - $ | Production Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of production |
Ramp - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Rate at which units are ramping | |
Ramp Down | Ramp Down | Production | LT Plan, MT Schedule, ST Schedule | False | Total ramping down |
Ramp Down Cost - $ | Ramp Down Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of ramp down charged at [Ramp Down Charge] |
Ramp Down Price - $ | Ramp Down Price - $ | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of the maximum ramping down constraint |
Ramp Down Violation | Ramp Down Violation | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Ramp Down] constraint |
Ramp Down Violation Cost - $ | Ramp Down Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Ramp Down] violations |
Ramp Down Violation Hours - h | Ramp Down Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of [Max Ramp Down] violation |
Ramp Up - ~ | Ramp Up - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Total ramping up |
Ramp Up Cost - $ | Ramp Up Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of ramp up charged at [Ramp Up Charge] |
Ramp Up Price - $ | Ramp Up Price - $ | Production | LT Plan, MT Schedule, ST Schedule | False | Shadow price of the maximum ramping up constraint |
Ramp Up Violation - ~ | Ramp Up Violation - ~ | Production | LT Plan, MT Schedule, ST Schedule | False | Violation of [Max Ramp Up] constraint |
Ramp Up Violation Cost - $ | Ramp Up Violation Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of [Max Ramp Up] violations |
Ramp Up Violation Hours - h | Ramp Up Violation Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours of [Max Ramp Up] violation |
Retirement Cost - $000 | Retirement Cost - $000 | Expansion | LT Plan | False | Cost of retiring a unit |
Revenue - $ | Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue for production |
Service Factor - % | Service Factor - % | Reliability | LT Plan, MT Schedule, ST Schedule | False | Proportion of capacity available for production |
Start & Shutdown Cost - $ | Start & Shutdown Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of unit start up and shutdown |
Start & Shutdown Penalty Cost - $ | Start & Shutdown Penalty Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Penalty cost of unit start up and shutdown |
Total Cost - $000 | Total Cost - $000 | Expansion | LT Plan | False | Total of fixed and variable costs |
Total Production Cost - $ | Total Production Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total production cost including production, VO&M, start and shutdown costs |
Units | Units | Production | LT Plan, MT Schedule, ST Schedule | False | Number of existing units |
Units Built | Units Built | Expansion | LT Plan | False | Number of units built |
Units Operating | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units operating | |
Units Out | Reliability | LT Plan, MT Schedule, ST Schedule | False | Number of units out of service due to maintenance | |
Units Retired | Units Retired | Expansion | LT Plan | False | Number of units retired |
Units Shutdown | Units Shutdown | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units shutdown |
Units Started | Units Started | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units started |
Units Warming Up | Production | LT Plan, MT Schedule, ST Schedule | False | Number of units in the warm up process | |
VO&M Charge - $ | VO&M Charge - $ | Production | LT Plan, MT Schedule, ST Schedule | False | Variable operation and maintenance charge |
VO&M Cost - $ | VO&M Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Total variable operation and maintenance cost |
Warm Up Hours - h | Warm Up Hours - h | Production | LT Plan, MT Schedule, ST Schedule | False | Number of hours warming up |
Water Consumption - m³ (Metric), gal. (U.S. Imperial) | Water Consumption - m³ (Metric), gal. (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Water consumption |
Water Cost - $ | Water Cost - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Cost of water consumed |
Water Production - m³ (Metric), gal. (U.S. Imperial) | Water Production - m³ (Metric), gal. (U.S. Imperial) | Production | LT Plan, MT Schedule, ST Schedule | False | Water production |
Water Revenue - $ | Water Revenue - $000 | Production | LT Plan, MT Schedule, ST Schedule | False | Revenue from water produced |
x | x | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
y | y | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
z | z | Pass-through | LT Plan, MT Schedule, ST Schedule | True | Value to pass-through to solution |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Consumption | Consumption | Production | LT Plan, MT Schedule, ST Schedule | True | Amount of Process Primary Input Commodity consumed by the Facility |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Production | Production | Production | LT Plan, MT Schedule, ST Schedule | True | Amount of Process Primary Output Commodity produced by the Facility |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Consumption | Consumption | Production | LT Plan, MT Schedule, ST Schedule | True | Amount of Process Secondary Input Commodity consumed by the Facility |
Name | Summary Name | Property Group | Phases | Multi-band | Description |
---|---|---|---|---|---|
Production | Production | Production | LT Plan, MT Schedule, ST Schedule | True | Amount of Process Secondary Output Commodity produced by the Facility |